Appeal 3328912
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
dropped kerb and conversion of existing front garden to a permeable block paved driveway.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are the effect of the development on: • the proper functioning and safety of the highway; and • surface water flood risk.
Section 04
[name]
The appeal relates to a detached dwelling located at the corner of [address] and [address]. [address] is a short residential cul-de-sac that does not restrict on-street parking. [address] is a busy classified road with a 30mph speed limit, pavements located on both sides, and unrestricted on-street parking in the near vicinity of the site. The dwellings on [address] are served by off-street parking within their curtilage and also within communal parking areas. Pavement to [address] is found along its northern side and on both sides of its junction. Many of the nearby dwellings on [address] have dropped kerb accesses and off-street parking to their front. The junction to [address] has a dropped kerb access on its southern side but not on its northern side adjacent to [site address] .
The proposed development would create a dropped kerb and vehicular access across the pavement to enable a car to be parked to the front of no 4, parallel to [address]. The existing front garden to no 4 would be surfaced with a permeable block paving and a new boundary wall 900mm in height would replace the existing.
Due to the small size of the proposed parking area, there would not be sufficient space for a car to easily turn within the curtilage. It would not be possible for a car to both enter and exit the proposed driveway in forward gear. This would lead to cars either reversing onto or off the highway and across the pavement. This is not disputed by the appellants. Reversing represents a more difficult manoeuvre than driving in a forwards gear and makes achieving a wide splay of visibility more difficult. On my site visit, I observed that there is on-street parking on [address] opposite the site and that the pavements and road were busy with pedestrians and vehicles respectively. There would be particularly limited visibility of pedestrians approaching the proposed access from [address].
Undertaking reversing manoeuvres in this context, where vehicles and pedestrians could be approaching from a number of directions, would be a hazard to both pedestrians and road users, and would result in conflicting traffic movements. Inevitably, such conflict would be to the detriment of the free flow of the highway, and to the safety of pedestrians and highway users.
I note that the appellant’s assert a dropped kerb would help pedestrians pushing buggies and mobility scooter/wheelchair users. Manual for Streets however, advises that the kerbed separation of footway and carriageway provides a number of benefits including, amongst others, offering protection to pedestrians and assisting blind or partially-sighted people in finding their way around.
The appellants have also drawn my attention to the number of existing vehicular accesses along [address], which I viewed during my site visit. [name] accept that there are existing accesses and parking spaces that require a car to be reversed across the footway, the majority are not located at a junction. Furthermore, I have no details relating to the circumstances or acceptance of the existing vehicle cross-overs. Although the presence of the other dropped kerbs nearby may appear to set a strong precedent, I must primarily consider the proposal on its own merits. [name] have found that the proposal would harm highway safety, the existence of other examples does not lessen that harm.
The development would be harmful to the proper functioning and safety of the highway. It would, therefore, conflict with Policy CS13 of the West Berkshire District Core Strategy (2012), and the provisions of the National Planning Policy Framework (the Framework), including paragraph 115. Taken together, amongst other things, these policies require that development improves and promotes opportunities for safe travel and does not result in an unacceptable impact on highway safety.
The Environment Agency (EA) [name] for [name] illustrates where areas could potentially be susceptible to surface water flooding in an extreme rainfall event. The Surface Water Flood Map shows that much of the application site is predicted to be at ‘High’ risk of surface water flooding, meaning this area has a chance of flooding of greater than 3.3% each year.
It is proposed that the new driveway will utilise a sustainable drainage system in the form of permeable pavement construction, allowing surface water to percolate through the surface material down into the sub-base where it is stored prior to infiltration into the existing ground. The appellant’s Flood Risk Assessment advises that the majority of the existing front garden consists of garden borders, with approximately 35% of the area being used as impermeable asphalt paths.
Whilst the Council is concerned that the existing upper strata may preclude the use of infiltration devices, the proposal would, nevertheless, increase the total area of the front garden covered by a permeable surface. Final details regarding finished levels could easily be controlled by condition. I am not persuaded, therefore, by the Council’s case that the development would increase surface water flood risk. Furthermore, the General Permitted Development Order 2015 (as amended) permits, without express planning permission, the provision of a hard surface for any purpose incidental to the enjoyment of the dwellinghouse provided the hard surface is made of porous materials.
The development would not, therefore, result in an increase in surface water flood risk. The Council’s refusal reason with regards to flood risk did not include reference to conflict with any development plan policies and I see no reason to disagree.
Section 05
Conclusion
The harms identified in respect of the main highways issue means that the proposal would be contrary to development plan policies when read as a whole. There are no material considerations, either individually or in combination, of sufficient weight to outweigh the identified conflict with the development plan.
For the above reasons, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 165No official casework-database value to compare
- Extracted decision date · page 1
- 22 April 2024Matches the official casework database
- Extracted site visit dates
- 16 April 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3328912
- Application reference
- PP-12079356
- Lead case reference
- Not recorded
- Planning authority
- West Berkshire District Council
- Planning authority code
- E06000037
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 September 2023
- Valid date
- 4 September 2023
- Start date
- 10 November 2023
- Planning authority decision date
- 29 June 2023
- Appeal decision date
- 22 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 49867
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21