Appeal 3328950
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
change of use from an ancillary annexe for a family member to a dwellinghouse now known as the [address] (C3).
Section 02
Decision
The appeal is allowed and the planning permission [name]/22/02337 for change of use from an ancillary annexe for a family member to a dwellinghouse now known as the [address] (C3) at [site address] granted on 23 June 2023 by Babergh District Council, is varied by deleting condition No 3.
Section 03
Preliminary Matters
Paragraph 56 of the National Planning Policy Framework (the Framework) states planning conditions should only be imposed where they meet six tests. Each of the six tests needs to be satisfied for each condition which an authority intends to apply1.
The Framework was updated in December 2023, during the course of this appeal. However, the section on planning conditions has not changed. Therefore, I am satisfied no party would be disadvantaged by not having the opportunity to provide observations on the new Framework. 1 Planning Practice Guidance Paragraph: 003 [name]: 21a-003-20190723
A new Babergh and Mid Suffolk Joint Local Plan Part 1 (JLP1) was adopted in November 2023, after the Council’s decision on the planning application subject of this appeal. The Council’s appeal statement, which post-dates the adoption of JLP1, states the [name] previously referred to are no longer relevant and identifies the JLP1 Policies relevant to the appeal. The appellant has had the opportunity to comment on the JLP1 Policies referred to by the Council.
The appellant considers the fence that has been erected across the route through the wider site at [site address] has planning permission granted by the Town and Country Planning (General Permitted Development) (England) Order 2015. This is not a matter for me to determine in the context of an appeal made under section 78 of the Town and Country Planning Act
It is open to the appellant to apply to have the matter determined under sections 191 or 192 of the Act. Any such application would be unaffected by my determination of this appeal. I have considered the appeal on its merits.
Section 04
Background and Main Issue
The Council is concerned that [address] should remain linked to the family of buildings it belongs to, in the interests of connectivity. It considers the driveway that loops south-westwards to join [site address] provides poor connectivity and is ill-related to its surroundings; and that the shorter route to the north provides a more logical path, for both vehicles and pedestrians. It therefore imposed condition No 3 to ensure better connectivity for the development.
The appellant states condition No 3 is not necessary because the southern access already exists and will remain as the principal access to the development. In their view there is no planning reason to insist on access northwards. They also consider the condition to be unenforceable.
The main issue in this appeal is therefore whether condition No 3 satisfies the tests for planning conditions, with particular regard to necessity, relevance to planning, and enforceability.
Section 05
Necessity
The wider site known as [site address] comprises a group of buildings and a paddock or small field. The wider site’s complex planning history has involved its change from use as a riding centre to an emerging cluster of primarily residential buildings. There are two points of access to and from [site address] , broadly located at the north and south-west corners of the wider site. The south-west access point also serves a separate commercial use and a new housing development to the south.
The building now known as [address] is at the southern end of the emerging cluster of dwellings at [site address] . It does not face onto the main ‘yard’ area, which provides a focal point for most of the homes, including the main house, a converted building and new build premises under construction at the time of my visit. Although the volume of vehicle movements associated with one dwelling would be limited, the route from [address] to this yard area is narrow and relatively long so does not provide the easiest route in or out. Moreover, the Cottage’s primary entrance and parking area are orientated to face the route into the site from the south-west. The Council accepts the disputed condition would not prevent the southwestern route being used. For these reasons, the south-western route is likely to function on a day-to-day basis as the main point of vehicular access to the dwelling for residents, visitors and services, whether or not the northern route is open.
I recognise that the previous functional relationship between the building’s use as a residential annexe and the main dwellinghouse provided a logic for maintaining vehicular access between the two. However, change of use from annexe to separate dwelling severs this functional relationship, notwithstanding the sequence of events that led to its permission. Therefore, [address] as a separate dwelling has neither a strong spatial nor functional relationship with the majority of the other dwellings at [site address] site. Consequently, physical connectivity with those dwellings is not necessary. This would remain the case whatever the outcome of the planning application for The Paddock Stable2.
The Council point out that access to [site address] from [address] is longer via the south-western route than the northern route. However, even if the difference in length is 100 metres as the Council suggests, this would add just seconds to the drive time and only a few minutes to the walk to the nearby bus-stop. I walked both routes to the bus-stop during my visit and found little material difference between the two. I also found little greater logic to the northern route given the stop is located approximately half-way between the two exits onto the road. Moreover, the south-western route has an acceptable relationship to its surroundings given it serves more than one use including several other dwellings.
I am therefore not persuaded that access via the slightly shorter northern route would materially enhance the connectivity of [address] as a separate dwelling, nor that the absence of access via this route would materially harm it.
For these reasons, I find condition No 3 does not meet the test of necessity.
I find no conflict between the proposed removal of condition No 3 and Policy LP24 of JLP1, which requires development to create/reinforce a strong design to the public realm and include linkages to contribute to a walkable neighbourhood. I also find no conflict with the supporting text of the Policy where it explains that good practice in design principles includes permeability and connectivity. Further, I find no conflict with the Framework, where it sets out the principles of good design including the creation of places that are safe, inclusive and accessible.
Section 06
Relevance to planning
Connectivity is a matter related to the planning objective of good design as set out in JLP1 Policy LP24. It is also inherent in the Framework’s objective of good design, as noted above. In addition, the question of connectivity falls within the scope of the permission in this case because it is one facet of the difference in relationship between a primary dwelling house and a residential annexe on the one hand, and between two separate dwellings on the other.
For these reasons, I find condition No 3 does meet the test of relevance to planning. 2 [name]/23/05186
Section 07
Enforceability
A breach of condition No 3 would inevitably involve the erection of a physical barrier obstructing access for motor vehicles to the route described in the condition. The local planning authority would be able to detect a breach through observation of such a barrier. It follows that monitoring of the condition would be neither unreasonably onerous nor practically impossible.
I have addressed the question of permitted development rights under
Section 08
preliminary matters.
For these reasons, I find condition No 3 does meet the test of enforceability.
Section 09
Conclusion
I have found that, whilst condition No 3 does meet the tests of relevance to planning and enforceability, it does not meet the test of necessity. I therefore conclude the condition does not satisfy the tests for planning conditions.
Section 10
Other Matters
Planning permission does not negate or supersede private legal rights relating to land ownership. Accordingly, issues relating to land ownership have not had any material bearing on my assessment of this appeal.
Section 11
Conclusion
For the above reasons, I conclude the appeal should be allowed and the original permission should be varied by deleting condition No 3.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 19390No official casework-database value to compare
- Extracted decision date · page 1
- 8 April 2024Matches the official casework database
- Extracted site visit dates
- 27 February 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3328950
- Application reference
- DC/22/02337
- Lead case reference
- Not recorded
- Planning authority
- Babergh District Council
- Planning authority code
- E07000200
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Other
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 5 September 2023
- Valid date
- 5 September 2023
- Start date
- 1 December 2023
- Planning authority decision date
- 23 June 2023
- Appeal decision date
- 8 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 49124
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21