Skip to main content
Official casework recordAllowedCurrent release

Appeal 3329222

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

11 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single-storey rear extension and rear dormer window (retrospective).

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a single-storey rear extension and rear dormer window (retrospective) at [site address] in accordance with the terms of the application reference 23/01486/HOU and subject to the following conditions:

    The development hereby permitted shall be carried out in accordance with the following approved plans: Existing and [name] 102 REVB 28.04.2023, [name] 119 REVB 28.04.2023, Site Plan 101 REVB 28.04.2023, Existing and [name] 103 REVB 28.04.2023, [name] 104 REVB 28.04.2023 and [name] 118 REVB 28.04.2023.

    Prior to the first occupation of the development hereby permitted, the proposed window in the side elevation of the single storey extension shall be fitted with and thereafter retained as obscure glazing.

    Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any subsequent equivalent legislation) no windows, including dormer windows and other than those hereby permitted, shall be inserted in the elevations or roof of the single storey extension hereby permitted.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Preliminary Matters

    Since the Council’s decision was issued, the appellant has made some changes to the scheme. These relate to minor matters of elevation treatment, windows and glazing. They do not, individually or cumulatively, amount to fundamental alterations to the scheme as it was considered by the Council. No party would therefore be prejudiced by my acceptance of revised plans to the above effects. For the same reasons, I have taken the description of development from the Council’s decision notice which, in any case, most accurately, clearly and concisely describes the development to which the appeal relates.

    The National Planning Policy Framework was revised during the life of the appeal. The substantive elements thereof as they relate to the appeal scheme have not changed. I have not therefore sought the views of the main parties.

  4. Section 05

    Main Issue

    There are two main issues. These are the effect of the proposal on a) the character and appearance of the area; and b) the living conditions of the occupiers of neighbouring dwellings.

  5. Section 06

    Character and Appearance

    The dormer element is something of a bulky feature and in running close to the full width of the dwelling it dominates the rear roof profile, resulting in a top heavy appearance. There are limited public views of the dormer with it being to the rear albeit there are a number of surrounding gardens from where it is obvious. The side elevation of it can also be glimpsed from the street. Suitable materials do not make up for the adverse effect of the overall size, location and positioning of the dormer element.

    This element of the scheme would therefore be harmful to the proportions and design of the building which would translate to harm to the character and appearance of the area, despite the variety of different architecture and scale to dwellings in the immediate vicinity. This would lead to conflict with Policies DS1 and DS3 of the Bradford District Core Strategy Development Plan Document ([name]) which seek to ensure, amongst other things, that development achieves good design and high quality through understanding of the site and its context, as well as retaining urban character and identity.

  6. Section 07

    Living Conditions

    The single-storey rear extension wraps around to join the side extension at the neighbouring boundary of no. [address]. This extension is closer to the side boundary than the sunroom which it has replaced, however, the proposal does not exceed the side boundary distance of the existing swimming pool building. The shared stone boundary wall separates the neighbouring property’s rear garden space from the appeal property’s which, along with the side gap between, the use of a flat roof and the overall height of the extension, acceptably reduces any overbearing effect.

    The side window of the extension looks directly towards No.[address] quarters; however, obscure glazing is proposed which would acceptably mitigate against any loss of privacy and can be secured through condition. The amended plans and the scheme as built at the time of my site visit show that the flat roof cannot be accessed via the first floor as the original door is now a full length window. This mitigates the overlooking and privacy harm to surrounding neighbouring occupants on [address] and [address] by preventing people accessing the roof as a terrace.

    The dormer faces neighbouring properties but, there is a significant distance between it and neighbours on [address]. In addition, the dwelling already has rear facing windows on the first floor which offer views of a very similar nature. With this and the above in mind, the proposal does not harm the living conditions of neighbouring occupiers and, as such, accords with Core Strategy Policy DS5 and the Bradford Householder Supplementary Planning Document which require, amongst other things, that development does not harm the amenity of existing or prospective residents.

  7. Section 08

    Other Matters

    The appeal site is located within the Saltaire World Heritage Site buffer zone. That said, there is no compelling evidence to point me away from the Council’s view that the proposal would not have a harmful impact thereon. In addition, and as the trees subject to preservation orders referred to by third parties are not directly related to the scheme before me (and the Council’s Enforcement Team are currently investigating them), it is not a matter which I have considered any further.

  8. Section 09

    Conditions

    The time condition is not required due to the proposals seeking retrospective planning permission. I have referred to the approved plans for enforcement purposes, as well as conditions restricting glazing type and new window openings to protect the living conditions of the occupants of neighbouring properties. A condition to restrict alterations to the roof of the single storey extension to prevent it being used as a balcony would not be necessary as the installation of such would require express planning permission in its own right.

  9. Section 10

    Conclusion and Recommendation

    [name] have found harm in regard to the first main issue, I am mindful of the Council’s confirmation, which is not contended by the appellant, that the size and position of the dormer element of the scheme would be acceptable under the allowances of the relevant class of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). There is nothing compelling before me to lead me in a different direction. I recommend that, taking into account the lack of harm I have found in regard to the second main issue, that this matter is relevant and worthy of substantial weight as a fallback position. Such that it would indicate a decision other than in accordance with the development plan. I therefore recommend that the appeal should be allowed, subject to the conditions set out above.

  10. Section 11

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed, subject to the conditions set out.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    6 June 2024Matches the official casework database
    Extracted site visit dates
    2 January 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3329222
Application reference
23/01486/HOU
Lead case reference
Not recorded
Planning authority
City of Bradford Metropolitan District Council
Planning authority code
E08000032

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
8 September 2023
Valid date
15 September 2023
Start date
25 September 2023
Planning authority decision date
10 August 2023
Appeal decision date
6 June 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
52064
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21