Skip to main content
Official casework recordDismissedCurrent release

Appeal 3329227

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the installation of cycle and canoe store and associated works.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    It was evident to me following my site visit that elements of the appeal proposals have been undertaken. The description on the decision notice also refers to the appeal proposal as ‘part retrospective.’ Section 73A of the Town and Country Planning Act 1990 (the Act) makes allowance for the submission of a planning application for development which has been carried out before the date of the application.

    Section 55 of the Act describes development as the carrying out of building operations or the making of material changes of use rather than the retention of works or the continuation of a use. I have therefore not included the words ‘part retrospective’ in the description of the proposal, and I have reworded the description of the development to better reflect the proposal before me. I have considered the appeal on this basis.

  3. Section 04

    [name]

    The main issues are the effects of the development on the character and appearance of the area and designated heritage assets, including that of the Chelston Conservation Area (the CA) and the setting of the [name]* listed [name], and surface water drainage.

  4. Section 05

    Character and appearance

    Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, as amended, requires special attention to be paid to the desirability of preserving or enhancing the character or appearance of the CA. These Appeal Decision: APP/X1165/D/23/3329227 statutory requirements are reinforced through Policy SS10 of the adopted Torbay Local Plan 2012-2030 (the LP).

    Paragraph 199 of the National Planning Policy Framework (the Framework) says when considering the impact of a proposed development on the significance of a heritage asset (including conservation areas), great weight should be given to the asset’s conservation (and the more important the asset, the greater the weight should be). This is irrespective of whether any potential harm amounts to substantial harm, total loss or less than substantial harm to its significance. Paragraph 202 of the Framework explains that where a development proposal will lead to less than substantial harm to the significance of the heritage asset, this harm should be weighed against the public benefits of the proposal.

    I am also aware of the Chelston Conservation Area Character Appraisal (the CAA). This document does not form part of the development plan but was subject to public consultation and I consider it to be a useful and material document in the appraisal of the appeal proposals.

    Paragraph 4.1.11 of the CAA explains that: ‘The 1880s villas, fan out north and south from [name] – an important green area of public open space, [address] to the north, [address] to the south – and are a mixture of detached and semi-detached as dictated by the undulating topography. Almost all retain the majority of their original Victorian detail with very little later alteration.’

    The CAA refers to the appeal property on [name] as ‘Other key buildings and building groups of architectural importance or which make a significant contribution to the townscape.’ [name] the CAA details the front boundary wall of the appeal property as part of the identified ‘[name] in the CA.

    Following my visit to the appeal site, it was evident to me that the front boundary walls to the properties along [address], as a consequence of their use of traditional materials, height and consistency are distinctive features that provide an important contribution to the character and history of their associated properties, and of the wider area, including that of the CA. The alterations to the front boundary wall of the appeal property, including the rebuilding and raising of its height and associated gate posts, which have an odd combination of exposed brickwork and stone, are not consistent with the boundary enclosures and gate posts found elsewhere along [address] in terms of proportions, style and appearance.

    Further, the proposed works to provide for the cycle/ canoe store to be positioned behind the front boundary wall through the excavation, then raising of the front garden area, which would thereafter provide for a raised levelled area to be enclosed by railings with the store underneath, would result in an elevated and level building mass as perceived from [address] and [name] opposite. These works would also not be reflective of the characteristics along the road, which predominately consist of sloping gardens leading upwards from the front of the properties recognised through the CAA as key buildings and building groups.

    For the above reasons, the appeal proposals would appear unusual and incoherent as a result, unduly drawing the eye. They would create prominent Appeal Decision: APP/X1165/D/23/3329227 discordant features to the front of the appeal property that would materially impact upon the visual quality of the street scene and would fail to preserve the character or appearance of the CA.

    In reaching my conclusions on this matter, I acknowledge that the property next door to the west of the appeal site has at some point in the past removed the front boundary wall, excavated the garden area back to provide for off street parking spaces and includes a level area to the front of the property enclosed by railings. However, I have no information as to the planning background behind these works, but nonetheless, these works are uncharacteristic of the area and out of context with the rest of [address]. They do not to my mind provide for a satisfactory justification for the harm that would arise from the appeal proposals. In any case, I am required to determine the appeal on its own individual merits.

    Turning to the effects upon the setting of the [name]* listed [name]. I agree with the appellant on this point that due to the nature of the proposals and the separation distances involved between the appeal site and this designated heritage asset, there would be no resultant effect upon its setting.

    For the above reasons, the appeal proposals are harmful to the character and appearance of the appeal property and the surrounding area. The appeal proposals would also fail to preserve or enhance the character and appearance of the CA. This harm would be less than substantial as defined by the Framework and therefore should be weighed against any public benefits of the proposal. The benefits to the appellant, which includes providing for convenient and secure storage space for domestic items, such as cycles and canoes, alongside providing an area to screen recycling and refuse bins from public vantage points, would not outweigh the harm I have identified.

    I therefore conclude that the appeal proposals would conflict with Policies DE1, DE5, SS10 of the LP, Policy TH8 of the adopted Torquay Neighbourhood Plan 2012 – 2030, Section 16 of the Framework and the CAA, which amongst other matters seek to ensure that development contributes positively to the townscape and conserves designated heritage assets.

  5. Section 06

    Surface water drainage

    The appeal site is located in the Torbay Critical Drainage Area (the CDA). A CDA is defined by the Environment Agency in areas within [name] 1 where surface water or sewer run off may increase existing flooding problems within the wider catchment. The CDA for Torbay sets out that all new development will have to play its part in reducing current rainfall runoff rates. This requirement also applies to brown field sites that will have to match the same standards. The SUDS hierarchy should be followed, by using infiltration as far as is practicable.

    The proposal involves a new built structure that removes part of the existing front garden area, which provides for the capture of the surface water on the appeal site.

    The appellant’s flood risk assessment provides no technical detail as to how the proposals would impact upon surface water drainage at the site and how they would meet the objective of the CDA in terms of playing their part in reducing Appeal Decision: APP/X1165/D/23/3329227 rainfall run off rates. The appellant does refer to a soakaway and a planned wildlife pond for water capture in their flood risk assessment, but I have no technical details of such, and any certainty that these would be an effective solution to surface water drainage at the site.

    Without further detail, I cannot be satisfied that there is an appropriate surface water drainage solution at the site in accordance with the CDA.

    Therefore, the proposals would not align with the CDA and Policy ER1 of the LP, which amongst other matters explains that development proposals will be expected to maintain or enhance the prevailing water flow regime on-site, including an allowance for climate change, and ensure the risk of flooding is not increased elsewhere.

  6. Section 07

    Other matters

    Reason for refusal 02 refers to cabling and gas piping being attached through the boundary walls, which without secure cabinets may represent a safety hazard as a result.

    The appellant states that the proposal does not include any cabling and gas piping, and that these items pre-existed the proposals and are nonetheless implemented to the correct relevant standards.

    [name] am dismissing the appeal on other matters, it has not been critical for me to explore this matter further. Nonetheless, it seems to me that, if necessary, it may have been possible to address this matter through appropriately worded planning conditions if I had been minded to allow the appeal.

  7. Section 08

    Conclusions

    For all the above reasons, having regard to all matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4127No official casework-database value to compare
    Extracted decision date · page 1
    13 December 2023Matches the official casework database
    Extracted site visit dates
    21 November 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3329227
Application reference
P/2021/0782
Lead case reference
Not recorded
Planning authority
Torbay Council
Planning authority code
E06000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
24 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
9 September 2023
Valid date
9 September 2023
Start date
3 November 2023
Planning authority decision date
25 August 2023
Appeal decision date
13 December 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
43546
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21