Skip to main content
Official casework recordAllowedCurrent release

Appeal 3329549

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for drop kerb to allow vehicle access.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a drop kerb to allow vehicle access at [site address] , Coventry [postcode] in accordance with the terms of the application, [name]/2023/0001606/HHA, dated 2 August 2023, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Block Plan Ref TQRQM23216153941754; Site/Block Plan Ref TQRQM23214130016028; and Location Plan Planning Portal Ref PP-12360197v1.

  2. Section 03

    Preliminary Matters

    The Council has stated in the decision notice and in some parts of its officer’s delegated report that the Coventry Local Plan was adopted in 2016, yet the evidence provided, including the front cover of the local plan, shows it was adopted in December 2017. I have had regard to the adopted Coventry Local Plan (2017) in reaching my decision.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on highway safety.

  4. Section 05

    Reasons

    The appeal property, [site address] (No 268) is a mid-terraced dwelling set back from the road with on-plot hardstanding in front, which appears to have been recently constructed. In front of No 268, between it and the road, there is a footpath of approximately 1/1.5 metres width, then a strip of grass verge. The grass verge area has no features within it directly in front of No 268, although it is interspersed with lampposts and large trees continuing along the road. There are no on-street parking restrictions along this part of [address] and there was a significant amount of on street parking along the road.

    [address] has a 30mph speed limit and is a classified road on a bus route. At the time of my visit (approximately 9.30am on a weekday) I noted that whilst the road is fairly busy, there was not a constant stream of traffic and traffic appeared to travel at or below the speed limit.

    Whilst most dwellings in this part of [address] are terraced and have garages at the rear, which are accessed via shared driveways situated between the terraced blocks, it does not appear the garages are generally being used to park vehicles. Also, due to the width of the access driveway there seemed to be limited manoeuvring space, to allow ease of access to these rear garages. However, a number of properties nearby in this part of [address] have existing frontage parking areas, some with and some without dropped kerbs. Examples of existing dropped kerbs nearby include at Nos 237, 262, 276, 280, 306, 310 and [address]. None of these properties have on-site turning space to allow vehicles to leave in forward gear and the dropped kerb and driveways are of similar design to that proposed at No 268.

    No 268 has an open frontage, yet the neighbouring properties to either side have front boundary walls up to a height of approximately 600mm. There is an end wall pillar rising to approx. 1.2m between 268 and [address] and an approx. [address] boarded fence along the side boundary between No 268 and 266, which extends up to the front boundary wall of No 266. These boundary features would restrict pedestrian visibility to drivers reversing off the driveway and so the required 2m by 2m pedestrian visibility spays would not be achieved. Although, I observed that this relationship and boundary treatment arrangement is very similar to that found in respect of the driveway and dropped kerb in front of [address]. Therefore, it is not clear why such an arrangement proposed at the appeal property would differ and be more harmful to highway safety than that found at No [address].

    Also, at No [address], the existing dropped kerb is in a location where visibility appears to be much more restricted than that proposed at No

    This is due to the existence of a bus stop and bend in the road close to No

    The proposed dropped kerb, therefore, in my opinion, would be less harmful to highway safety than this example nearby.

    Due to the existence of parked cars along the road and other features within the highway verge and footway, including trees and lampposts, it is unlikely that drivers would not take care in reversing off the driveway. Also, due to the existence of parked cars and other features in the highway verge, together with the 30mph speed limit, I consider other highway users are likely to be mindful of potential conflicts and have greater awareness when driving or walking along this part of [address].

    [name] acknowledge the concerns of the local highway authority and Council, I have no substantive evidence to show that reversing vehicles would cause a significant increase in conflict with road users, even taking into account the limited pedestrian visibility splays. Additionally, whilst the proposal would introduce a further crossing point, I do not agree with the highway authority that this necessarily equates to an additional point of conflict such that it would fail to accord with the National Planning Policy Framework (the Framework), which seeks to prevent development on highway grounds where an unacceptable impact on highway safety would occur, or where the residual cumulative impacts on the road network would be severe.

    Having regard to the above, the proposed development would not cause harm to highway safety and there would be no conflict with, in particular, Policy AC2 of the Coventry Local Plan (2017) (CLP), which sets out new development should ensure it does not cause unacceptable highway problems. Also, there would be no conflict with Policy AC4 of the CLP which, amongst other matters, requires development to incorporate safe and convenient access to walking routes.

  5. Section 06

    Other Matters

    [name] acknowledge the proposal would involve the removal of one available on-street parking space to accommodate the dropped kerb, there would be enough space for two parking spaces on the driveway of the appeal property. This would result in a net gain of parking provision in the area and consequently reduce the need for on-street parking. I also acknowledge that the proposal may affect the ability to install on-street EV charging along the highway in the future. However, I have no substantive evidence to show this would be harmful or conflict with the development plan. Additionally, there would remain opportunities elsewhere along the road to provide EV charging points. I therefore provide limited weight to these matters.

  6. Section 07

    Conditions

    The Council has not suggested any conditions that they feel would be necessary if the appeal were to succeed. However, in light of the advice contained within the national Planning Practice Guidance and the Framework, in addition to the standard implementation condition, it is necessary for the avoidance of doubt and in the interests of certainty to define the plans with which the scheme should accord.

  7. Section 08

    Conclusion

    In view of the above, I have found there would be no conflict with the development plan as a whole, nor any conflict with the Framework. Accordingly, I conclude that the appeal should succeed and grant planning permission.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4850No official casework-database value to compare
    Extracted decision date · page 1
    29 December 2023Matches the official casework database
    Extracted site visit dates
    22 November 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3329549
Application reference
PL/2023/0001606/HHA
Lead case reference
Not recorded
Planning authority
Coventry City Council
Planning authority code
E08000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
14 September 2023
Valid date
14 September 2023
Start date
11 October 2023
Planning authority decision date
14 September 2023
Appeal decision date
29 December 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
44228
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21