Appeal 3330103
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
new vehicular crossover.
Section 02
Decision
The appeal is allowed and planning permission is granted for new vehicular crossover at [site address] , in accordance with the terms of the application, Ref. 23/01126/FULH, dated 3 July 2023, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 2023/06/271aSG Sheet 2 (Existing location & block plans); 2023/06/271aSG Sheet 3 (Proposed Site Plan); and 2023/06/271aSG Sheet 4 ([name] and [name]).
No development shall take place until an Arboricultural Impact Assessment and details of any tree protection measures for the two street trees adjacent to the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in full accordance with the findings and recommendations of the approved Arboricultural Impact Assessment and the approved tree protection measures. The approved tree protection measures shall be installed prior to the commencement of the development and shall be retained for the duration of the construction phase of the development.
Section 03
Procedural Matter
A revised National Planning Policy Framework (the Framework) was published in December 2023, after the appeal was lodged. However, as the policies of most relevance to this proposal have not changed it has not been necessary to seek further comments from the parties.
Section 04
Main Issue
The main issue is the effect of the proposal on highway safety and the free flow of traffic as a result of the removal of an on-street parking space.
Section 05
Reasons
The appeal property is a dwelling constructed in recent years with access onto [address]. The width of the road is sufficient to accommodate on-street parking bays whilst maintaining traffic flow. These bays are interspersed with vehicular accesses serving dwellings along the length of the road, although there are also dwellings which rely on street parking.
[address] appears to be part of a controlled parking zone (CPZ), with the parking bays on this particular road limited to vehicles for residents with permits at specified times. At the time of the mid-morning, weekday site visit, many of the resident bays in the road were unoccupied. However, in nearby roads there was some evidence of parking pressure, with vehicles lining both sides of the road with few gaps.
The appeal property has access to its own on-site car parking, with the area in front of 271 and [site address] (Nos. 271 and 271A) being hard surfaced for this purpose. Access to these spaces is via a single crossover in front of No.271. This means that vehicles accessing No.271A pass in front of the neighbouring property.
The proposed crossover would result in the loss of a permit space from the communal on-street parking bay. The Council published as guidance a ‘Vehicle Crossing Policy’ July 2021 (VCP). This document advises that when considering applications for new vehicle crossings, one matter to be considered is the impact on kerbside parking capacity. It also advises that applications within an existing controlled parking zone will be refused if the proposed access/crossover would take up more than one average parking space, taken to be 5 metres1. This guideline does not appear to preclude properties which have alternative access to existing on-site spaces.
In this case, the proposal would not involve the loss of more than one permit parking space, and the appellant advises that it would increase the potential for on-site parking. Whilst highway safety may have been a factor in the introduction of parking controls in the area, the Council does not indicate that the design of the proposal would introduce any safety hazards in itself, but rather from the wider effect on parking and traffic flow as a result of the loss of one space.
The appeal property already benefits from on-site parking, but I can appreciate that there is potential for obstruction of the shared frontage by indiscriminate parking. This should be manageable by agreement between neighbours, but I do not doubt that at times this could be impractical and awkward. More importantly, this arrangement could limit access to/exit from the appeal site in the event of an emergency, and could lead to more hazardous manoeuvring on the highway.
In addition, although the frontage is reasonably deep, the existing parking arrangements would require vehicles of No.[address] to 1 Vehicle Crossover Policy Traffic & [name] 2021: page 6, last paragraph of section 3. the habitable room windows and front door of No.271. Whilst residents would already experience a degree of traffic nuisance from vehicles using [address], cars manoeuvring on the forecourt closer to No.271 would cause greater disturbance and potential hazards to its occupants.
I am mindful that previous planning applications involving a similar crossover to the appeal proposal have been refused by the Council. Limited information has been supplied of the reasoning for those decisions, but in any event the dwelling has now been built and this decision has been considered against current policies and guidance, and the circumstances on the ground.
Paragraph 115 of the Framework advises that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. The Council advises that the area is one of parking pressure, but I am not convinced that the loss of one on-street parking bay would give rise to unacceptable impacts on highway safety, particularly when it would materially improve the safety and manoeuvrability for vehicles at the appeal site, and at No. 271. This is a factor that would outweigh any residual impact on the network. The effect on the free flow of traffic would be neutral.
I therefore conclude that the loss of one on-street parking space would not be detrimental to highway safety and the free flow of traffic. In so doing, it would accord with the Framework, and with the road safety aims of Policy CP3 of the Southend on [name] 2007. There would be no conflict with Policies DM3 and DM15 of the Council’s Development Management Document 2015, insofar as the proposal would not result in undue stress on transport capacity, and there would be physical and environmental capacity to accommodate the type and amount of traffic generated in a safe and sustainable manner. As the VCP allows for the loss of one space within a CPZ in assessing applications, the proposal would not conflict with the guidance in that document.
Section 06
Conditions
In addition to the standard time limit, I have attached a condition specifying the approved drawings as this provides certainty. The Council has requested a condition for the submission of an Arboricultural Impact Assessment relating to two nearby street trees. The submitted plans show the position of street trees, but without sufficient detail to gauge with accuracy the root protection areas, which could affect the construction design of the crossover. The Framework confirms the important contribution that trees can make to the character and quality of urban environments, and this is reflected in the Council’s own policies. As such it is necessary and reasonable to ensure that measures are put in place to safeguard the health of the street trees. With some slight modification to wording, I have attached the Council’s recommended pre-commencement condition, to which the appellant has agreed.
Section 07
Conclusion
For the reasons given above I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 867No official casework-database value to compare
- Extracted site visit dates
- 3 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3330103
- Application reference
- 23/01126/FULH
- Lead case reference
- Not recorded
- Planning authority
- Southend-on-Sea City Council
- Planning authority code
- E06000033
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 25 September 2023
- Valid date
- 25 September 2023
- Start date
- 15 November 2023
- Planning authority decision date
- 23 August 2023
- Appeal decision date
- 19 January 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 45084
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21