Skip to main content
Official casework recordDismissedCurrent release

Appeal 3330187

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single storey side extension of the dwelling in order to accommodate a bedroom and a wet room for a disabled person.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    A revised version of the National Planning Policy Framework (the Framework), was published in December 2023 and is a material consideration to this appeal. Both parties were given the opportunity to comment on this. I have taken into account the response received.

  3. Section 04

    [name]

    The main issues are the effect of the proposed development on: • the character and appearance of the area; • amenity and highway safety; and, • the appellant’s personal circumstances.

  4. Section 05

    Character and appearance

    Four pairs of semi-detached houses stand in a formal layout opposite each other between each of the four legs of a broad crossroads. Each corner of the crossroads has been truncated with oblique footways, or verges and tree planting. The front gardens of the houses are enclosed by low walls or fences. Because of the formality of their siting, the low street enclosure, and the generous public realm at this junction, the pairs of houses are prominent features which command the public space between them.

    Side extensions to properties occupying corner plots are largely absent in the immediate area. Indeed, the area is characterised by the generous, and largely undeveloped space between the pairs of houses whose common townscape of compact mass and footprint under pitched roofs with robust, traditional detailing and quality materials provide an attractive backdrop to the street.

    I appreciate that the side garden of the house is broad and could accommodate the extension without the plot appearing cramped. However, given the compact footprint of the house, the width of the proposed extension would undermine the prominence of the main section of the house. It would unbalance its place in the hierarchy of forms in the street scene. The lack of a set-back or articulation of the extension from the front line of the house would exacerbate this imbalance.

    Moreover, the very low pitch of the roof of the extension, as well as its monopitch form, would undermine the utility and order in the roofscape of some of the houses in the area which are distinguished by elegant sprocket-hipped ends, and paired, high gables. In this distinctive townscape context, the proposal would appear incompatible.

    Furthermore, I observed that side extensions of similar width to this proposal are not common in the street scene. Where houses have been extended, generally the extensions have been set back from the front building line, which ensures their subservience to the main mass of the house, at least in townscape terms, if not spatially.

    I conclude that for these three reasons: the width of the extension; its front wall position flush with that of the house; and the low pitch and monopitch form of its roof, the proposal would undermine the distinctive architectural character of the buildings which characterise the area and whose coherent forms, detailing and materials make it distinctive. These elements of the extension’s design would lead to very significant harm to the character and appearance of the area.

    The proposed development would conflict with UDP policy BD6, which requires extensions to respect the scale, form and detailing of the original building, as well as policy P10 of the [name] 2019 (CS), which requires good contextual design, that respects the character and quality of surrounding buildings. The proposed development is also in conflict with the guidance on achieving well-designed and beautiful places contained in chapter 12 of the Framework, which seeks to ensure development is visually attractive, in keeping with its surroundings, and maintains a strong sense of place.

    The Council referred to saved policy GP5 of the Leeds Unitary Development Plan (Review 2006)(UDP), however, it’s not determinative to this issue.

  5. Section 06

    Amenity and highway safety

    The development would reduce the amount of space beside the house, though it is unclear if parking space would be lost. Even if parking space were lost, the street is not parking-controlled and I saw no signs of unsustainable pressure for street parking in this area. In the absence of any substantive evidence to the contrary, I conclude that the development would not reduce the amenity of neighbouring occupiers or cause a risk to highway safety. I find no conflict from the proposal with UDP policy GP5 and CS policies P10 and T2 as far as they concern car parking.

  6. Section 07

    Personal circumstances

    I recognise the failure of this appeal could affect the living arrangements for the current occupant of the house. I have had due regard to Article 19 of the [name] on the Rights of Persons with Disabilities (UNCRPD), to the Human Rights Act 1998 (HRA), and to the Public Sector Duty (PSED) under Section 149 of the Equality Act 2010, which sets out the need to eliminate unlawful discrimination, advance equality of opportunity and access, and foster good relations between persons who share a protected characteristic and those who do not share it. Disability is a relevant protected characteristic to which the PSED applies.

    These rights are engaged in reaching my decision and I have kept these interests at the forefront of my mind. However, they are qualified rights and interference may be justified where in the public interest. The concept of proportionality is key. I recognise that the extension has been designed to provide facilities for a person with a protected characteristic and does not include other extraneous accommodation. Given the detailed evidence on the protected characteristic and the accommodation proposed, I attribute significant weight to the benefits of the proposal.

  7. Section 08

    Other Matters

    The Council suggests that an alternative siting for the proposed extension would resolve the policy conflicts, however, I do not have details of an alternative extension. I have assessed the proposal before me.

  8. Section 09

    Conclusion

    I have found that the development would not reduce the amenity of neighbouring occupiers or cause a risk to highway safety. However, because of the three elements of its design which I have identified, it would lead to very significant harm to the character and appearance of the area.

    I have had due regard to the Equality Act 2010, and the UNCRPD. I acknowledge that the additional living accommodation would deliver benefits related to a person with the protected characteristic of disability. The negative impacts of dismissing the appeal on the appellant arise since he would be unable to extend and improve his home as sought, and his accessibility requirements in terms of living conditions would not be met in this regard.

    Furthermore, there is a chance that the appellant’s specific needs would not be met if an acceptable alternative could not be put forward. However, having due regard to this, and to the need to eliminate discrimination and promote equality of opportunity, I have concluded that the interference of rights is necessary and proportionate in dismissing the appeal, in view of the legitimate and well-established planning policy aims to protect the character and appearance of the area.

    Even taken alongside the other considerations, including the benefits of the proposal related to a person with the protected characteristic of disability, the PSED considerations would not outweigh the harm I have identified.

    The proposed development is contrary to the development plan, when read as a whole, and there are no material considerations to indicate that a decision should be taken other than in accordance with that plan. For the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5474No official casework-database value to compare
    Extracted decision date · page 1
    6 March 2024Matches the official casework database
    Extracted site visit dates
    21 November 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3330187
Application reference
23/01986/FU.
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
26 September 2023
Valid date
26 September 2023
Start date
3 October 2023
Planning authority decision date
20 July 2023
Appeal decision date
6 March 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
47715
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21