Skip to main content
Official casework recordAllowedCurrent release

Appeal 3330414

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

two portal framed buildings comprising café, offices, toilets/changing and storage facilities, together with ancillary structures, site works and landscaping.

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 22/01150/OUT, dated 24 March 2022 for the erection of two portal framed buildings comprising café, offices, toilets/changing and storage facilities, together with ancillary structures, site works and landscaping granted on 8 September 2023 by [name] & Chester Council, is varied by deleting condition No 9 and replacing it with the following condition:

    The use of the floorspace hereby approved as a café or as office facilities shall be exercised solely for the benefit of anglers and spectators using [site address] at the time, and staff working at the premises, and shall at no time serve the general public. For the avoidance of doubt, no building shall form a separate planning unit.

  2. Section 03

    Background and [name]

    A commercial fishery, with associated toilets, reception and store has existed at the site for a number of years having been granted planning permission in

    I noted at my site visit that the development is not yet complete, and the fishery is not operating to its maximum capacity. 1 Planning Application No: 10/12984/FUL

    Outline planning permission was granted for two portal framed buildings comprising a café, offices, toilets/changing and storage facilities together with ancillary structures, site works and landscaping, in 2023, as set out above. The permission was subject to various conditions including condition 9 which limits the use of the floorspace within the approved buildings to [site address] anglers and staff and prevents the buildings from becoming a separate use.

    The appellant seeks to remove condition 9 in order for the café to be used by passing trade in order to support the viability of the business. The site lies within the countryside outside any settlement boundary and is within the Green Belt.

    The main issue in this case is therefore whether the condition is reasonable, necessary and enforceable having regard to national and local policy relating to development in the Green Belt and outside local settlements.

  3. Section 04

    Reasons

    The National Planning Policy Framework sets out that the construction of new buildings should be regarded as inappropriate in the Green Belt. An exception to that is the provision of appropriate facilities (in connection with the existing use of land or a change of use) for outdoor sport and outdoor recreation, amongst other things, as long as the facilities preserve the openness of the Green Belt and do not conflict with the purposes of including land within it. These exceptions are also referred to in the justification for Policy STRAT9 of the [name] and Chester Local Plan which aims to protect the character of the countryside.

    There is no reason to doubt that the appellant intends that the café and offices are used in connection with the fishery and the Council, in granting planning permission subject to conditions, considered that the proposal was an appropriate facility to serve what is a recreational and sporting activity and therefore met the Green Belt test. I have no reason to consider otherwise. However, there is nothing in the description of development which describes the proposed use as being ancillary to the fishery or which otherwise ties the proposed use to the existing.

    The café and office would occupy a relatively limited area of the overall development. However, at this stage the plans are indicative only and there would be nothing to prevent, for example, the café becoming larger than that shown, up to a limit set out in condition 5. Nor can I be certain that the café would be located to the rear of the proposed storage building and thereby less visible to members of the public, although I acknowledge that even if it were sited adjacent to the shop it would not have a significant presence from the road.

    Notwithstanding this, whether a use can be considered incidental to the primary use of the site is not solely dependent on its size, rather the question is whether the use would be functionally related to the primary use of the planning unit. The removal of the condition would allow the cafe to be used by members of the public not associated with the fishery. Accordingly, without the condition, there would be no certainty that the café and office would remain an incidental use to the fishery, and thereby an appropriate facility for sport, in perpetuity.

    I acknowledge that during the week, and in poor weather conditions, the fishery, including the café, is likely to be less intensively used than at other times. However, there is no specific evidence before me about the financial viability of the café or the business as a whole, or to what extent the use of the café by visiting members of the public is required to make it viable.

    My attention has been drawn to other countryside businesses, including other fisheries, which have café facilities. I do not have the details before me to determine whether the circumstances or context of those developments are the same as the case before me. In any event, most of those developments were granted planning permission prior to the introduction of the Framework in 2012 and may not therefore have been determined in the same policy context. Furthermore, the recently approved café building at [name] is subject to a condition which restricts it to an ancillary use.

    I note the appellant’s contention that business needs to remain competitive with similar facilities in the region. However, there is no dispute that the development would provide appropriate facilities for users of the facility, including disabled participants, and there is no convincing evidence before me to demonstrate that the condition itself would render the business uncompetitive.

    I understand that the shop on site is not subject to any planning restrictions although I am not aware that the retail use required and/or received planning permission itself. Moreover, its presence does not justify the proposal before me which can only be determined in accordance with current planning policy.

    Taking into account all of the above, without any other mechanism to ensure that the proposed use remained incidental to the fishery, the removal of the condition would result in the development being considered inappropriate development in Green Belt terms. Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. No other considerations have been put forward that indicate that very special circumstances exist.

    On that basis the condition is necessary. I have also considered it against the other tests for conditions set out in the Framework and the Planning Practice Guidance. I acknowledge that it is not clear whether the ‘angler’ specified in the condition would need to be actively using the site and this element of the condition would not be precise and it would thereby be difficult to enforce. It also seems to me that the condition is narrowly worded and that spectators should reasonably expect to use the café and toilet facilities.

    I have therefore altered the wording of the condition to include the patrons of the business referred to by the appellant. As a result, the appeal is allowed but only in respect of the wording of the condition, as set out in the formal

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 724No official casework-database value to compare
    Extracted decision date · page 1
    1 May 2024Matches the official casework database
    Extracted site visit dates
    16 April 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3330414
Application reference
22/01150/FUL
Lead case reference
Not recorded
Planning authority
Cheshire West and Chester
Planning authority code
E06000050

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor general industry/storage/warehousing
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.13 hectares
Floor space
491 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 September 2023
Valid date
12 December 2023
Start date
26 February 2024
Planning authority decision date
8 September 2023
Appeal decision date
1 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
50306
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21