Appeal 3330729
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘retrospective planning application for a wind turbine’.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
At the time of my visit, the wind turbine was in situ and I have dealt with the appeal on the basis that planning permission is being sought retrospectively.
The Government published a revised National Planning Policy Framework (the Framework) on 20 December 2023. As the changes do not materially affect the main issues in this case, the parties have not been invited to make further comment. Where reference is made in this decision to paragraph numbers, they are taken from the latest version of the Framework.
Section 04
[name]
The main issues are: • Whether the appeal site is appropriate for wind energy development having regard to local and national policy; • The effect of the development on the living conditions of nearby residents with particular regard to shadow flicker and noise; • The effect of the proposal on public safety; and • The effect of the development on the character and appearance of the area.
Section 05
Appropriateness of site
The Framework indicates that the planning system should support the transition to a low carbon future and is supportive of the need to provide renewable energy. It highlights that even small-scale projects provide a valuable contribution to cutting greenhouse gas emissions. However, with regard to wind turbines, footnote 58 to paragraph 163b) indicates that applications for one or more turbines should not be considered acceptable unless it is in an area identified as suitable for wind energy development in the development plan or a supplementary planning document and, following consultation, it can be demonstrated that the planning impacts identified by the affected local community have been appropriately addressed and that the proposal has community support.
Policy SD2 of the Staffordshire Moorlands Local Plan (LP) is supportive of renewable or low-carbon energy sources to meet part of the district’s future energy demand. It indicates that wind turbine schemes will be assessed in line with the Government’s specific policy on wind turbines.
The appeal site is not located in an area identified as suitable for wind energy as the LP does not identify any such areas. In addition, consultation on the planning applications resulted in several letters of objection. It is therefore clear that the development does not have the support of the local community.
Accordingly, the appeal site is not appropriate for wind energy development as it is contrary to LP Policy SD2 and footnote 58 to paragraph 163b) of the Framework.
Section 06
Living conditions
The wind turbine is sited close to the front boundary of [site address] (No 2). A pair of two storey semi-detached dwellings, 1 and 3 Parkway (No 1 and No 3) are sited opposite at a lower ground level. Such properties are separated from the wind turbine by the carriageway and modest front gardens.
Given the orientation and proximity of the wind turbine relative to the front windows of No 1 and No 3, it is reasonable to consider that the rotation of the wind turbine blades could cast shadows in the rooms served by the front facing windows. I acknowledge that the occupiers of the nearest property, No 1, have not objected. Nonetheless, an occupant of No 3 has indicated that the rotation of the turbine reflects in the lounge of that property.
Consequently, in the absence of technical evidence that demonstrates otherwise, I cannot be certain that acceptable living conditions for neighbouring occupants could be maintained with the wind turbine in situ.
A Noise Impact Assessment Report (the Report) was provided with the planning application documents which concludes that the wind turbine has a low impact at the nearest and worst affected noise sensitive receptors. I acknowledge that the Council’s Environmental Health Officer (EHO) has raised no objection to the conclusion of the Report and recommends that the noise levels and advice set out in it are secured by condition. In the absence of any substantive evidence to the contrary, I find no reason to dispute the findings of the Report or disagree with the EHO.
I therefore conclude that the development has an unacceptable effect on the living conditions of nearby residents with regard to shadow flicker. Consequently, as it has not been demonstrated that this planning impact as identified by the affected community has been appropriately addressed, it is contrary to LP Policy SD2 and footnote 58 to paragraph 163b) of the Framework.
Section 07
Public safety
As part of the appeal documents, the appellant has provided information about the wind turbine and pole. This includes warranty details for the turbine, confirmation that it was installed by an appropriately qualified person, and that the turbine has a cut-out mechanism that takes it out of excessive winds. It is indicated that the turbine would be inspected regularly by an engineer. Furthermore, the appellant has suggested guy wires could be attached to the pole as an extra precautionary measure and on my visit, I noted that had already been done. [name] were minded to allow the appeal, conditions could be imposed to require regular inspection and the retention of the guy wires.
I acknowledge the concerns of the Council, shared by interested parties, that the wind turbine poses an unquantified safety risk given its proximity to the public highway and pavement. However, in the absence of any substantive evidence to the contrary, I find no reason to dispute the operational and safety information that has been provided or conclude that the installation is unsafe.
Consequently, the appeal scheme does not harm public safety and accords with LP Policy DC1 which requires new development to create a safe public environment. Insofar as it is relevant to this main issue, the proposal also accords with LP Policy SD2 and footnote 58 to paragraph 163b) of the Framework as the planning impact that has been identified by the affected community has been appropriately addressed.
Section 08
Character and appearance
The wind turbine is in a prominent position on the corner of Parkway and [address] in a residential area. Lampposts are regularly spaced along the two highways creating a rhythm and verticality within the street scene.
The column on which the wind turbine is mounted is comparable in scale and appearance to the nearby lampposts. Whilst the turbine and blades are bulkier than the lighting units on top of the lampposts it has a relatively linear and compact design overall. Notwithstanding its elevated and exposed position, I find that it is typical of the infrastructure often experienced in built up areas and, accordingly, is not an alien and unexpected feature in the street scene.
Therefore, the development does not harm the character and appearance of the surrounding area. As such it accords with [name] SS1, SS8, DC1, DC3 and SD2 which, amongst other things, seek to ensure that developments respect the site and its surroundings. In addition, it accords with the design aims of the Framework set out at paragraph 135.
Section 09
Other Matters
I acknowledge the appellant’s concerns regarding the Council’s handling of the planning application, including the significant financial burden of commissioning a Noise Impact Assessment. However, these are matters that fall outside of the remit of this decision.
I note that there is some public support for the wind turbine, however this does not justify development that I have found to be harmful.
Section 10
Planning Balance
Section 38(6) of the Planning and Compulsory Purchase Act 2004 sets out that applications for planning permission must be determined in accordance with the development plan unless material considerations indicate otherwise.
The Framework gives strong support to the delivery of renewable energy schemes. In addition, in declaring a climate emergency the Council is seeking to reduce carbon emissions, and as part of this they wish to enable people to reduce their own carbon footprint by supporting small standalone renewable energy schemes. The benefits of this domestic scale turbine are small but the reduction in carbon emissions arising from it add moderate weight in favour of the development.
I have, however, concluded that the proposal would not be located in an area identified as suitable for wind turbines. Furthermore, I have found that the development causes harm to the living conditions of nearby residents and, consequently, all the planning impacts identified by affected local communities have not been appropriately addressed. It is therefore contrary to the development plan, which carries substantial weight in this decision.
I have not found harm with regard to public safety or in respect of the character and appearance of the area. However, the absence of harm in these matters are neutral factors in the balance.
Accordingly, in this instance, I consider that the benefits of the proposal do not present a material consideration that is sufficient to outweigh the identified conflict with the development plan and the Framework.
Section 11
Conclusion
The proposed development conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweighs the identified harm and associated development plan conflict. I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3473No official casework-database value to compare
- Extracted decision date · page 1
- 8 January 2024Matches the official casework database
- Extracted site visit dates
- 20 December 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3330729
- Application reference
- SMD/2023/0118
- Lead case reference
- Not recorded
- Planning authority
- Staffordshire Moorlands District Council
- Planning authority code
- E07000198
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 25 July 2023
- Valid date
- 25 July 2023
- Start date
- 20 October 2023
- Planning authority decision date
- 11 May 2023
- Appeal decision date
- 8 January 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 44473
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21