Appeal 3330775
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
Although the Council has not provided the Appeal Questionnaire, there is sufficient information available for the assessment of the development from the policies provided for other appeals being determined at the same time and the documents and drawings posted on the Council’s application portal.
Section 04
[name]
It is considered that the main issues are the effects of the development on (a) the character and appearance of the host property and the surrounding area and (b) the living conditions of the occupiers of 19 and [address].
Section 05
Character and Appearance
The appeal property is a 2-storey mid-terraced dwelling situated within a primarily residential area. Prior approval was granted by the Council for the erection of an extension to the rear of the property with a length of 6 metres and height of 2.9 metres ([name]/3380/20/PRIOR). However, the extension which has been erected varies from the approved scheme because it is around 6.12 metres in length, about 3.2 metres in height and sits on a raised patio area. The appeal scheme also includes a flue for a wood burner projecting above the extension’s roof and an outbuilding used for laundry purposes.
Although not built in accordance with the approved scheme, the granting of prior approval for the extension is a material consideration to which significant weight is given in the determination of this appeal. The degree of variation between the erected extension and the approved scheme is not considered to be so significant that there is a materially different physical or visual impact upon the character and appearance of either the host property or the terrace of dwellings.
In reaching this judgement it is acknowledged that the size of this addition is in excess of the guidelines concerning the height and length of extensions contained in the Council’s Harrow Residential Design Guide Supplementary Planning Document (SPD) but, as identified, prior approval exists for a similar form of development. However, because of its close relationship with the extension, the siting of the modest sized outbuilding does visually and, to a lesser extent, physically add to the perceived length of the extension.
Within the surrounding area, chimneys and flues of are associated with the dwellings rather than any rear extensions. Although painted black, the flue does not relate to the host property and, as such, it is an incongruous physical and visual feature within the context of the character and appearance of the rear amenity spaces associated with the surrounding dwellings.
Accordingly, when assessed cumulatively, it is concluded that the development causes unacceptable harm to the character and appearance of the host property and the surrounding area and, as such, it conflicts with Policy CS.1B of the [name] (CS) and Policy DM 1 of the Harrow Development Management Policies Local Plan (DMP). Amongst other matters, these policies require development to be of high-quality design which is not detrimental to local character and appearance and for extensions to respect their host buildings. Policy D3 of The London Plan is more particularly directed at optimising site capacity through the design-led approach rather than being a detailed development management policy for householder extensions.
Section 06
Living Conditions
The side elevations of the extension are sited adjacent to the shared boundaries with 19 and [address]. The gardens of these neighbouring properties are long and spacious. In this case, when viewed from the rear ground floor windows and gardens of these neighbouring properties there is not a material difference between the scale of the extension as built and the scheme subject to prior approval in terms of the effect on outlook, day and sunlight, overshadowing and whether the development is overbearing.
The siting of the outbuilding visually and, in terms of perception, physically increases the extent of built development along the shared boundary with No. 19 and increases the sense of enclosure for the occupiers of this neighbouring property, including from the rear windows and garden. When combined, the extension and the outbuilding represent an unacceptably overbearing form of development for the occupiers of No. 19.
The flue is a noticeable feature from, in particular, the garden of No. 23. On its own, the flue is not overbearing for the occupiers of No. 23 but it is visually and physically conspicuous and does add to the unacceptable harm which has been identified.
Some emissions from the flue are associated with burning wood but the property is situated within a smoke controlled area so any smoke emissions are subject to other legislative controls. The height of the flue above the extension ensures that any emissions are not a significant source of pollutants which adversely affect the air quality for the occupiers of the surrounding properties. However, the absence of any significant adverse effects on air quality associated with the flue does not outweigh the unacceptable harm which has been identified.
On this issue, it is concluded that the development does cause unacceptable harm to the living conditions of the occupiers of 19 and [address] and, as such, it conflicts with DMP Policy DM 1, including the consideration of the adequacy of outlook within buildings and outdoor spaces. Accordingly, it is concluded that this appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1351No official casework-database value to compare
- Extracted decision date · page 1
- 18 December 2023Matches the official casework database
- Extracted site visit dates
- 28 November 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3330775
- Application reference
- P/1729/23
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 27 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 October 2023
- Valid date
- 5 October 2023
- Start date
- 31 October 2023
- Planning authority decision date
- 14 August 2023
- Appeal decision date
- 18 December 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 43885
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21