Appeal 3331283
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as: ‘First floor side/rear extension and conversion of enlarged roof space to habitable accommodation including rear dormer extension and side roof light’.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
[name] 2023, the Government published a revised version of the National Planning Policy Framework (Framework). [name] have had regard to the revised national policy as a material consideration, planning decisions must still be made in accordance with the development plan unless material considerations indicate otherwise. In this instance, the issues most relevant to the appeal remain unaffected by the revisions to the Framework. I am therefore satisfied that there is no requirement to seek further submissions on the revised Framework, and that no party would be disadvantaged by such a course of action.
The description of development as detailed on the application form has been amended in subsequent documents. I have adopted the description included in the appeal form, which details the proposal accurately and concisely.
Section 05
Main Issue
The main issue in this case is the effect of the proposal on the character and appearance of the area.
Section 06
Reasons for the Recommendation
The appeal site comprises a two-storey, semi-detached, 20th century dwelling set in a large plot. It forms part of an established residential area designated as the [site address] Area of Special Residential Character (ASRC). The [site address] ASRC is a pleasant suburban area of housing from the inter-War period, originally designed on the garden suburb principle, with spaciously placed large plots.
As noted in Annex 2 to the London Borough of Bromley Local Plan 2019 (Local Plan), the separation between buildings as well as the rhythm and pattern of the houses adds to its special character. Despite a number of alterations and side extensions having taken place, the separation between properties on [site address] Road maintains an uncrowded and open feel. Houses are typically set in good-sized plots and unaltered semi-detached pairs display an attractive symmetrical form. These features give the area a pleasing, semi-rural, character.
For a proposed extension of two or more storeys in height, Policy 8 of the Local Plan requires a minimum one metre space from the side boundary of the site to be retained for the full height and length of the building. However, it also makes it clear that where higher standards of separation already exist within residential areas, proposals will be expected to provide a more generous side space. As noted in the supporting text to Policy 8, the retention of space around residential buildings is important, to prevent a cramped appearance and unrelated terracing from occurring.
The appeal proposal is for a wraparound first floor side and rear extension, combined with the enlargement of the roof space to include a rear dormer extension and a side roof light. Although the proposed extension would be set away from the side boundary, it would significantly reduce the current visual gap between the appeal property and its neighbouring dwelling. This would result in a cramped form of development, unacceptably eroding the open and spacious character of the area. Also, the proposed extension would unbalance and disrupt the current symmetry of the semi-detached pair. Consequently, the proposed side alterations would harmfully affect the character of the area and the ASRC.
Whilst the appellant has referred to examples of extensions sited within proximity to an adjoining side boundary, the pattern of development remains predominantly characterised by wider gaps between buildings. In some instances where side development has occurred, this has had a detrimental effect to the spacious feel of [site address] Road. Therefore, these do not justify a development which would deteriorate the spacious and open character of the area.
One of the examples brought forward by the appellant was a scheme allowed on appeal at 10 [site address] Road (APP/G5180/D/18/3194319). Despite its relative proximity to the appeal site, the development occurred in a somewhat different context. Separation distances in the vicinity of the considered proposal are wider than at the previous appeal scheme, increasing the importance of maintaining this facet of the area’s character. For these reasons, very limited weight can be ascribed to these examples and appeal decision.
The proposed side extension would cause unacceptable harm to the character and appearance of the area, and would therefore conflict with Policies 6, 8, 37 and 44 of the Local Plan. Amongst other things, these require development to complement the layout of its surrounding area, and positively contribute to its heritage context. They also make clear that spaces or gaps between buildings should be respected or maintained, where these contribute to the special character of an area.
Section 07
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s recommendation and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 152No official casework-database value to compare
- Extracted decision date · page 1
- 9 July 2024Matches the official casework database
- Extracted site visit dates
- 2 February 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3331283
- Application reference
- 23/01337/FULL6
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 13 October 2023
- Valid date
- 29 October 2023
- Start date
- 6 December 2023
- Planning authority decision date
- 29 September 2023
- Appeal decision date
- 9 July 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53700
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21