Appeal 3331284

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for the demolition of existing detached garden store, construction of two storey side extension and lean-to, and associated works.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the demolition of existing detached garden store, construction of two storey side extension and lean-to, and associated works at [name], [site address] , Fishbourne, [name] [postcode] in accordance with the terms of the application, Ref: FB/22/02347/DOM, dated 14 September 2022, subject to the following

  2. Section 03

    conditions:

    Other than the materials used in the construction of the external surfaces, the development hereby permitted shall be carried out in accordance with the following approved plans ref: DPA-01 Revision 02.

    Within two months of the date of this decision, the materials to be used in the construction of the external surfaces of the development hereby permitted shall be submitted to and agreed in writing by the local planning authority. The materials shall match as far as possible the existing materials used on the host dwelling. The external materials agreed shall be installed within three months of the date of the local planning authority’s formal written approval.

  3. Section 04

    Preliminary Matters

    The description of development on the Council’s decision notice is different to that on the planning application form. I have used the Council’s description in the heading above as it more accurately describes the development, albeit have omitted reference to a garden store / garage as this is not included on the plans before me.

    A revised version of the National Planning Policy Framework (the Framework) was published in December 2023. I have not considered it necessary to invite observations from the main parties as regards any relevance, this is in view of the determining issues at play.

    I note from the information before me, and as observed on the site visit, that the development has already been constructed and the planning application sought retrospective planning permission.

  4. Section 05

    [name]

    The main issue is the effect of the development on the character and appearance of the host property and wider area.

  5. Section 06

    Reasons

    The appeal property is a two-storey detached dwelling located on the corner of [address] and [address]. The character of the area is residential comprising a wide range of dwelling types, sizes and styles.

    The development as built comprises a two storey side extension with hanging tiles and a gable end pitched roof. I have reviewed the planning history including a previous planning permission for a two storey side extension with a hipped roof ref: FB/20/01576/DOM. This is a material consideration that establishes the principle of a two storey side extension. Whilst it included a slight set back from the host property, I am satisfied that the appeal development is not materially different in terms of its scale, bulk and mass up to eaves level and therefore acceptable in this regard in terms of impact on the character and appearance of the area.

    The key difference in terms of scale, bulk and mass is, therefore, the roof design. In this regard, the host property has a gabled ended roof, which the extended part replicates albeit with a lower ridge height. The appeal development is, therefore, subservient to the host dwelling. This subservience results in a development that does not appear as unduly large or out of place with the host dwelling in terms of scale, bulk and mass.

    Whilst twin gabled properties are not prevalent in the area, the roofscape character in the locality comprises a wide and eclectic mix of styles and types; the prevailing character of roofscape is therefore a distinct lack of uniformity. In this context, the twin gable design is no more visually intrusive in terms of scale, bulk and mass than what already exists in the area, even with it being on a relatively open corner plot. Accordingly, the development’s scale, bulk and mass does not result in material harm to the character and appearance of the area.

    I do, however, find that the materials that have been used with terracotta colour hanging tiles creates an unduly discordant relationship with the host property and how it appears in the street scene. This discordance is highlighted by the property’s position on a corner plot, which can be seen from public views in the immediate vicinity of the site. I note the appellant has highlighted that hanging tiles were approved under the previous planning permission. However, that was a different scheme to the development before me and proposed a less tiled area than what has been used on the extension as built. I, therefore, conclude that the materials on the external surfaces of the extension as built should match as far as possible the original dwelling in order for a visually acceptable development to be achieved. This could be secured by

  6. Section 07

    condition.

    For the reasons given above, the development does not cause unacceptable harm to the character or appearance of the existing building or the wider area. Consequently, the development accords with Policies 2 and 33 of the Chichester Local Plan 2014-2029 and Policy D1 of the Fishbourne Neighbourhood Plan 2014-2019, which expects development to have the highest standards of design, respect and respond to the character of the surrounding area and site and use good quality materials that complement the existing palette of materials used in Fishbourne.

    The development is also consistent with Chapter 12 of the National Planning Policy Framework and the Council’s Planning Guidance Note 3: [name] for Alterations to Dwellings & Extensions ([name] 2009), which seek to ensure that developments are designed to be sympathetic to local character.

  7. Section 08

    Conditions

    I have considered which planning conditions are required having regard to the tests contained in Planning Practice Guidance (PPG). As the development has been substantially completed it is not necessary to include the standard time limit condition. However, it is necessary to include a condition that specifies the approved plans in order for clarity and precision over the scale, type and form of development that is approved by this decision.

    It is also necessary to require that the external surface materials match the host property to ensure an acceptable visual appearance of the development. I have included a condition to require these details to be submitted to and agreed in writing by the local planning authority so they can retain control over the quality of materials to be installed. I have included time limits for both the submission of the details and subsequent installation following the local planning authority’s approval to ensure the development can be completed as soon as possible.

  8. Section 09

    Conclusion

    For the reasons given above, the development subject to conditions is consistent with the policies of the development plan as a whole and there are no material considerations that would lead me to a different conclusion. I therefore conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6440No official casework-database value to compare
    Extracted site visit dates
    31 January 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3331284
Application reference
FB/22/02347/DOM
Lead case reference
Not recorded
Planning authority
Chichester District Council
Planning authority code
E07000225

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
27 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 October 2023
Valid date
29 October 2023
Start date
7 December 2023
Planning authority decision date
24 July 2023
Appeal decision date
26 February 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
47131
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21