Appeal 3331318
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a fence and gabion pillars to the front of one property.
Section 02
Decision
The appeal is allowed and planning permission is granted for a fence and gabion pillars to the front of the property at [site address] , [postcode] , in accordance with the terms of the application, Ref 2023/1619, dated 31 May 2023, and the plans submitted with it.
Section 03
[name]
The main issues are the effect of the development on i) highway safety and ii) the character and appearance of the area.
Section 04
Highway safety
The appeal site is located on a quiet modern residential estate road, with a 30mph speed limit. Traffic movements along this road are likely to consist primarily of domestic vehicles, and occasional delivery and service vehicles.
There is very little information before me to substantiate the Council’s highway safety concerns, other than that the pavement is only 1.5 metres wide, and that as such there would not be a 2 metre visibility splay between the end of the private driveways and the public road.
As the driveways to Nos. 9 and [site address] are both wide enough for two cars, and are served by equally wide dropped kerbs, drivers, cyclists and pedestrians would be aware of their presence when approaching them and would be able to see any vehicles attempting to exit them. Moreover, vehicles would not be exiting these driveways at speed or attempting to join a road of busy or fast flowing traffic. Guidance contained in the Manual for Streets states that the absence of wide visibility splays at private driveways will encourage drivers to emerge more cautiously.
Due to the alignment of the road, visibility from the driveway of No.11 continues to be good in both directions. Although the fence slightly restricts visibility to the south-east, from the driveway of No.9, traffic approaching from this direction would be on the opposite side of the road and would become visible to drivers of vehicles exiting No.9 before they join the highway.
I note that the access road between Nos.1 and [address], which serves a cul-de-sac of 4 dwellings and has no footways, has high walls, fences and hedges planted on either side of it, up to the carriageway edge and up to the edge of the footway at its junction with [address]. Other properties on either side of [address] also have hedge planting along the edge of the footpath, some of which already exceeds a metre high and which will, along with other less mature hedge planting, continue to grow.
The dwelling on the junction of [address] and [address], and its rear garden wall, is also located up to the edge of the pavement, obstructing the visibility of the private driveway serving the dwelling behind it.
As the footway is the same width throughout the estate, it is clear that other 1.5 metre visibility splays have been accepted on to [address] from private driveways.
I therefore conclude that the fence and pillars do not restrict visibility from the driveways of Nos. 9 or [site address] , to an extent that causes danger and inconvenience to users of the adjoining public highway. As such the development accords with Policy DM3.11 of the South Norfolk Local Plan Development [name] 2015 (the DMPD), which seeks to resist development that endangers highway safety or the satisfactory functioning of the highway network.
Section 05
Character and appearance
There is no uniformity or distinctive consistency to the boundary treatments adjacent to the highway on [address]. Although some properties are open plan, many of the front gardens are enclosed by fencing and landscaping of varying types and heights. Rear gardens located adjacent to the highway are bound by high brick walls, some of which are set in with planting in front of them and some of which sit just behind the pavement.
The fencing in question consists of narrow horizontal timber bars with narrow gaps between them that allow obscured views through to the garden and the front of the house. The gabion pillars comprise large wire cages filled with stones of multiple sizes and colours that reflect the coloured render and other paving to the front of the house. The height of the fence steps down with the slope of the road and neither the fencing nor the pillars exceed the height of other boundary walls, fences and planting that exists between the houses and the road in this area. Given the variety of boundary treatments present within the streetscene, the appeal proposal, despite being different, is no more dominant or harsh than other walls and fences in the immediate area.
I therefore conclude that the development does not adversely affect the streetscene and is not contrary to Policy DM3.8 of the DMPD or Policy 2 of the [name] for Broadland, Norwich and [name] 2011. These policies seek to promote good design that respects adjoining structures and spaces and integrates successfully into its surroundings.
Section 06
Conclusion and Conditions
For the reasons given above the appeal is allowed. As the development has already been completed no conditions are necessary.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 164No official casework-database value to compare
- Extracted decision date · page 1
- 31 January 2024Matches the official casework database
- Extracted site visit dates
- 24 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3331318
- Application reference
- 2023/1619
- Lead case reference
- Not recorded
- Planning authority
- South Norfolk District Council
- Planning authority code
- E07000149
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 13 October 2023
- Valid date
- 13 October 2023
- Start date
- 19 December 2023
- Planning authority decision date
- 31 August 2023
- Appeal decision date
- 31 January 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 45735
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21