Skip to main content
Official casework recordDismissedCurrent release

Appeal 3331654

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the “Erection of new gates and brick 1.8m pillars at the front of [site address] , set back [address]. The walls past the gates to the road be 900mm in height and partially incorporate railings.”

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Preliminary Matters

    The Government published a revision of the National Planning Policy Framework (the Framework) in December 2023. [name] have had regard to the revised national policy as a material consideration, planning decisions must still be made in accordance with the development plan unless material considerations indicate otherwise. In this instance, the issues most relevant to the appeal remain unaffected by the revisions to the Framework. I am therefore satisfied that there is no requirement to seek further submissions on the revised Framework, and that no party would be disadvantaged by such a course of action.

  4. Section 05

    [name]

    The main issues are the effect of the proposal upon the character and appearance of the area, having particular regard to a protected tree, and highway safety.

  5. Section 06

    Protected Tree

    No [site address] (no 124) sits to the north of [address]. It is a large, detached property and significantly set back from the road frontage within a spacious plot. Opposite the appeal site, the road is lined with thick vegetation. Aside from its immediate neighbour, no other properties are overly immediately visible nearby. This secluded setting, coupled with the abundance of mature trees nearby give the area a semi-rural, quiet, and sylvan setting.

    The proposed gates and brick pillars would be located within proximity to a [name] tree, situated in the front garden of the appeal site, and which is protected by a Tree Protection Order1. The pine tree is of a considerable height and, given its prominent positioning within the front lawn, sits distinctly from other nearby trees and is highly visible within the street scene. As a result, the tree makes a significant contribution to the visual amenity and verdant character of the area.

    The Tree Survey, Arboricultural Impact Assessment and [name] (Ref: TCL-CT-124WEL AMS [2020]) (the tree report) submitted by the appellant as part of the appeal appears to be associated with previous development on the appeal site from several years prior. Whilst it does provide evidence displaying the Root Protection Area (RPA) of the tree, it only does so in relation to the existing driveway and entrance and does not show the proposed development and its positioning concerning the tree.

    Notwithstanding the above, and having regard to the information shown on the Tree Protection Plan contained in the tree report, it is evident that the proposed pillars and walls would encroach within the RPA of the protected tree. No detailed information has however been presented to demonstrate that alternatives were considered to avoid construction works within the tree’s RPA, and there is no overriding justification for constructing the development within the RPA.

    The digging of foundations required for the construction of the proposed development could cause significant harm to the rooting system of the tree. In the absence of detailed evidence to the contrary, it is therefore by no means certain that the tree would recover from potential root damage associated with the proposal. The development could compromise the long-term health and wellbeing of the tree, which would be detrimental to the character and appearance of the area. For these reasons, I can only ascribe very limited weight to the presented tree report.

    The appellant has provided some information within their statement as to how they would seek to preserve the health and vitality of the tree. However, whilst the proposed measures outlined may generally be described as good practice, they do not specifically address how this proposed development can be achieved whilst ensuring any potential tree damage is mitigated against. Whether or not the actions of the previous owner may have already compromised the long-term health of this protected tree, this is no justification for causing further harm.

    In the absence of sufficient information to the contrary, I am unable to conclude the development could be undertaken without causing unacceptable harm to the character and appearance of the area, having particular regard to the protected pine tree. The development therefore fails to accord with Policy 73 of the Bromley Local Plan (adopted January 2019) (BLP) which, amongst other things, seeks to ensure development takes particular account of existing trees on site and on adjoining land. However, I find no conflict with 1 Tree Preservation Order No. 2337 Policy 43 of the BLP, which pertains specifically to trees in conservation areas, and is therefore not relevant to the appeal proposal.

  6. Section 07

    [name]

    The site is located upon a section of narrow highway which has no footpath or road markings. There are no visible road junctions within close proximity to the appeal site. From the existing vehicular access to the site, there are sufficient sightlines along the highway to the east. Towards the west, sightlines are comparatively more limited, due to the curvature of the road. As part of my site visit, I observed sparse levels of motorised traffic, with vehicles travelling at relatively low speed.

    The access would have a maximum width of 7.5 metres and the proposed gate would be set back significantly from the road. This, together with the siting of the wall at a slight angle, would ensure that adequate visibility is maintained either side of the access for motorised vehicles exiting the site. Furthermore, the road circumstances would in all likelihood encourage drivers to proceed with caution when exiting the site. These factors, combined with the relatively low speed of vehicles along what appears to be a lightly trafficked road, lead me to conclude that the proposal would not adversely affect highway safety.

    For the above reasons, the development would not compromise highway safety and would therefore be consistent with the requirements of Policy 32 of the BLP, which seeks to ensure development does not significantly adversely affect road safety.

  7. Section 08

    Conclusion and Recommendation

    Although the proposal would not have a significant adverse effect on highway safety, this is outweighed by the harm which the development would cause to the area, with particular regard to the protected pine tree. Therefore, for the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s recommendation and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 152No official casework-database value to compare
    Extracted decision date · page 1
    29 July 2024Matches the official casework database
    Extracted site visit dates
    27 February 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3331654
Application reference
DC/23/02063/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
19 October 2023
Valid date
19 October 2023
Start date
11 January 2024
Planning authority decision date
19 October 2023
Appeal decision date
29 July 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
54713
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21