Skip to main content
Official casework recordDismissedCurrent release

Appeal 3332099

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a part single storey, part two storey rear extension, partial garage conversion and first floor rear balcony.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The National Planning Policy Framework (the Framework) was revised in December 2023. As the changes do not materially affect the main issues in this case, the parties have not been invited to make further comments.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on protected trees.

  4. Section 05

    Reasons

    Located in a predominantly residential area, the site comprises a detached dwelling within a large plot. An area Tree Preservation Order (TPO) covers various types of trees in the former grounds of [name], [address], and Cranmore, [address]. This includes three mature oak trees in the rear garden of the appeal site.

    The Arboricultural Survey and Planning Integration Report (ASPIR) indicates that the oak trees on the site are in a satisfactory condition. From my observations on site, the trees appear to be healthy, and, although located in a private rear garden, due to their condition, height and canopy, they make a significant and positive contribution to the character of the area.

    The proposed extension would be sited close to the tree canopy of two of the oak trees (T1 and T2), within their root protection areas (RPAs) according to [name] 5837 Trees in Relation to Design, Demolition and Construction (BS5837). The ASPIR shows temporary ground protection to avoid compaction of the soil from the passage of heavy vehicles on the area of the proposed extension and surrounding path, and a construction exclusion zone in the remaining parts of the RPAs, with the use of tree protection fencing.

    Due to the existing external paving and raised internal floor level, it is indicated that the proposed extension could be built on a structurally integral floor slab supported by short piles, with the new path laid using a no dig specification. However, there is no certainty that the proposed development would be built using this method and, indeed, the ASPIR indicates that this would be subject to engineering design. Further, although smaller than a previously refused scheme, as the proposal would extend beyond the existing path into land which rises towards the trees, there would be significant intrusion into the soil. Therefore, although root depths can vary and sandy soil can benefit them, from the information before me, I cannot be certain that the proposal would not harm the roots and integrity of the protected trees.

    The appellant refers to the availability of compensatory rooting areas and to other appeal decisions where the Inspectors found that proposals would not harm the overall root systems. However, much of the existing house is already within the RPA for tree T1 and the proposed extension would encroach significantly further into it as well as introducing built development into the RPA for tree T2. [name] acknowledge that BS5837 provides recommendations which allows justified deviations from them, I am not convinced that the proposal would not have a harmful impact on the tree root systems as a whole.

    It is indicated that the trees would be retained. Nevertheless, although trees will tolerate reasonable pruning and require routine maintenance, the extension would be so close to the crown of one of the oak trees (T1) that minor branch tips may have to be pruned back for scaffolding clearance. Therefore, due to the proximity of the proposed extension to the tree, I am not satisfied that the proposal would not harmfully damage its crown.

    The extended house would be much closer to the trees than the existing dwelling. As such, there would be an increased likelihood of future pressure to prune or remove the trees from occupiers perceiving a risk of branch or tree failure, and greater potential for harm from falling tree branches and debris.

    The appellant suggests a condition requiring the submission of an arboricultural method statement prior to the development commencing. However, this would not overcome the harm I have found due to the position of the proposed extension in relation to the protected trees.

    Consequently, I conclude that the proposal would harm protected trees. This would be contrary to Policy 73 of the BLP where it seeks to retain trees in the interests of visual amenity and protect trees of environmental importance. It would also conflict with the Framework which requires decisions to recognise the intrinsic character of trees.

  5. Section 06

    Other matters

    The Council does not raise concerns or find development plan conflict in relation to several other matters, including the appearance of the extension and living conditions. There is no compelling evidence before me that would lead me to reach a different conclusion to the Council on them. Nevertheless, these are neutral factors.

  6. Section 07

    Conclusion

    For the reasons given above, the proposal would conflict with the development plan as a whole and there are no material considerations, including the Framework, that would outweigh that conflict. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4490No official casework-database value to compare
    Extracted decision date · page 1
    1 March 2024Matches the official casework database
    Extracted site visit dates
    19 February 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3332099
Application reference
23/03059/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
27 October 2023
Valid date
27 October 2023
Start date
7 December 2023
Planning authority decision date
3 October 2023
Appeal decision date
1 March 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
47479
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21