Appeal 3332561
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
proposed dormer and garage conversion to front.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue in this case is the effect of the proposed dormer on the character and appearance of the host bungalow and local area.
Section 04
Reasons
No. [site address] (No.9) is a semi-detached bungalow, with rear dormer, located on the north side of [address], a residential cul-de-sac. It is proposed to construct a dormer to the front roofslope of No.9 to accommodate 2no. additional bedrooms at first floor.
The guidance in the Council’s Supplementary Planning Document: [name] (2012) (SPD) is that, in design terms, the scale of a proposed dormer should always be a subordinate feature within the roof plane and windows should line up with the windows of the existing building below. Further, they should not normally occupy more than one quarter of the roof plane which faces the highway or which is otherwise prominent in the wider streetscene.
The proposed dormer would project above the ridgeline of the existing roof of No.9, continuing the existing flat roof dormer observed to the rear. Whilst it would be set-up from the eaves of the roof and in from its sides, the dormer would nonetheless extend much of the width of the bungalow occupying well over one quarter of the roof plane and all but consuming the existing roof. Because of its scale and the low eaves of its host, the proposed dormer would appear unduly ‘top heavy’ and, rather than appearing subordinate, would appear an unsympathetic and incongruous addition. Further, the proposed windows of the dormer would be set right under the fascia of the flat roof and would not align with the windows below, further unbalancing the composition of No.9. There would, therefore, be a clear conflict with the SPD guidance.
I observed on my site visit that the row of bungalows on the north side of [address] are uniform in their style and appearance, characterised by a deep plan form with shallow pitched roof and low eaves height. The proposed dormer would be unduly prominent within this streetscene, with the large cheeks very visible when travelling in either direction along [address]. It would result in a disproportionate addition that would be out of scale with the neighbouring row of bungalows, and would unbalance the symmetry with its semi-detached pair.
I acknowledge that there are front dormers to those dwellings on the south side of [address], but these are quite different in character and appearance to the bungalows on the north side. They have a much steeper pitch to the roof, higher eaves and were designed as chalet bungalows, so with front dormers set well off the ridgeline of the roof, and this pattern of planned development is characteristic of both [address] and [address]. I do not find that these properties lend any support to the proposal now before me, which would be viewed principally within the context of the row of bungalows it forms part.
I therefore conclude on the main issue that the proposed dormer would cause harm to the character and appearance of the host bungalow and local area. Consequently, the proposal conflicts with the principles of good design in Section 12 of the National Planning Policy Framework and policies CG3 and RA2 of [name] (2011) because it fails to be sympathetic to, or conserve, local distinctiveness or have regard to overall built character.
Section 05
Conclusion
For the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 114No official casework-database value to compare
- Extracted site visit dates
- 31 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3332561
- Application reference
- 16517/23
- Lead case reference
- Not recorded
- Planning authority
- Bolton Metropolitan Borough Council
- Planning authority code
- E08000001
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 10 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 November 2023
- Valid date
- 5 November 2023
- Start date
- 18 December 2023
- Planning authority decision date
- 25 September 2023
- Appeal decision date
- 14 February 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 46585
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21