Appeal 3332686
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a rear outbuilding.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The application was made retrospectively and at the time of my visit the outbuilding was complete.
The Council’s decision notice refers to the impact of the development upon the occupiers at [address]. The correct address is [address].
Section 04
Main Issue
The main issue is the effect of the outbuilding upon the living conditions at [address] in terms of visual impact and overshadowing.
Section 05
Reasons
The appeal property is a detached dwelling located within a residential cul-de-sac and which backs on to the rear gardens of properties along [address]. The appeal relates to a detached, single-storey outbuilding with a pitched roof over and which has been erected at the foot of the garden to No 6. The rear garden boundary of the appeal site adjoins and spans the full width of the rear garden boundary to [address] and part of the rear garden boundary to No 208. The outbuilding is positioned off-centre and principally sits adjacent to the common boundary with No 210, spanning the majority of its width.
The plans show the outbuilding to be set 500mm from the side boundary with [address], 3100mm from the side boundary with No 8, and 500mm from the rear boundary to [address]. I saw during my visit that the eaves and gutter overhang to the rear elevation of the building reached up to the fence along the rear boundary. The ridge height for the building is given as 3300mm, a figure that is not disputed by the Council.
The Council’s Residential Extensions & Alterations Supplementary Planning Document 2 (SPD), dated January 2018, deals with outbuildings at section 2.10. Amongst other things it advises that outbuildings should normally be restricted to a single-storey and that, where any part of it would lie within 2m of a neighbour’s garden, the maximum height permitted would be 2.5m, or 3m if the proposed outbuilding would be over 2m from the nearest boundary. The SPD further advises that in certain circumstances, when a dual-pitched roof is proposed and the outbuilding would be at least 2m from all neighbouring boundaries, then a ridge height of 4m may be considered acceptable. The SPD clearly states that the reason for these guidelines is to ensure that any outbuilding does not overbear a neighbour’s garden.
The outbuilding is well within a 2m distance when measured to the boundary with [address] to one side and the boundary with [address] to the rear. With a ridge height of 3.3m, the outbuilding exceeds the Council’s normal guidelines by 0.8m and appears to me to precisely represent a form of development the SPD advises against.
To the side, the outbuilding sits adjacent to a single-storey, flat roof outbuilding at the foot of the garden to No 4. As such and given that it would be seen in the outlook from this neighbouring property at an angle and not head-on, I share the Council’s view that the neighbour’s living conditions to this side are largely unaffected.
To the rear, the outbuilding sits very close to the rear boundary fence shared with [address] and spans virtually the full width of this neighbour’s plot. Being immediately east of the garden to No 210, I am not persuaded that it has any significant impact in terms of overshadowing the neighbour’s garden by any meaningful degree. Nevertheless, the outbuilding has imposed itself at very close quarters upon the outlook from this neighbouring amenity space. I share the Council’s, and neighbour’s view, that due to its height, its presence at the foot of this garden is seen as visually intrusive and overbearing. I find this to be to the detriment of the neighbour’s living conditions.
The appellant has argued that the maximum ridge height of the building is over 2m from the boundary with No 210. Regardless, the SPD is clear that where any part of an outbuilding lies within 2m of a boundary, its maximum height should be no more than 2.5m, irrespective of its roof form. In this instance the distance from the boundary with No 210 is considerably less than the 2m normally required. Were a building to be positioned 2m from the boundary with No 210, it follows that its maximum ridge height would be further still from the same boundary, minimising its visual impact when viewed from neighbouring land. I find nothing to the circumstances of this case to suggest that the Council’s normal guidelines should be set aside.
The examples of the outbuildings at Nos 4 and [address] that have been pointed out to me by the appellant do not resemble the dual pitched form of the development at the appeal property and are therefore not directly comparable.
Section 06
Conclusion
For the reasons given, I find the development to be harmful to the living conditions at [address]. In addition to conflict with the SPD’s guidelines, there is conflict with Policy DMP1 of the Brent Local Plan 2019-2041 (adopted February 2022), as far as it requires, amongst other things, development to achieve high levels of amenity. The harm that I have identified and conflict with the development plan means that the outbuilding does not represent a sustainable form of development. Therefore, the National Planning Policy Framework’s presumption in favour of sustainable development does not apply. Accordingly, and having regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 286No official casework-database value to compare
- Extracted site visit dates
- 18 December 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3332686
- Application reference
- 23/2631
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Brent
- Planning authority code
- E09000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 November 2023
- Valid date
- 7 November 2023
- Start date
- 20 November 2023
- Planning authority decision date
- 12 October 2023
- Appeal decision date
- 29 December 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 44233
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21