Appeal 3333005
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are the effect of the proposal upon the character and appearance of the host building and wider street scene, and whether the proposed development makes adequate provision for matters relating to fire safety.
Section 04
Character and Appearance
The appeal property is a detached, two-storey dwelling set back from the road and within a residential area comprising an eclectic mix in terms of size, age, and appearance of mostly detached dwellings. The proposal would substantially remodel the appearance of No 28 with two-storey extensions that would effectively square the footprint of the existing house and which would project both front and rear.
The Council has raised no issue directly with the outward appearance of the resulting building but has concern with the overall scale of the additions in relation to the size of the original dwelling, and in particular that the two-storey front extension would be excessive and intrusive within the street scene.
Although the rear extension would be deep, the plot is large enough to ably accommodate its size. The dwelling would remain well separated from its side boundaries and neighbouring properties such that it would not appear cramped within the street scene. In addition, the overall composition of the remodelled dwelling would appear well-considered in terms of its proportions, scale, and detailing, ensuring that it would be appropriately in-keeping with the mixed character and appearance of the area.
I accept that the fairly modest depth of the existing dwelling would be altered by the proposed additions front and rear, but in my assessment these new elements would remain appropriately subservient component parts of the building by virtue of their hipped roofs, lower ridge heights, and proportionately narrower bay widths compared with the building overall.
The Council has argued that the front building line on this side of [address] is fairly consistent. However, the alignment of buildings is not regimented. The houses are all set back from their front boundaries but there are variations with some set back further than others. The proposed front extension would bring the appeal property closer to the back edge of the pavement, but not excessively so. Importantly, in this instance, a deep frontage would remain. There would be no significant intrusion to the vista along [address] as a result of the forward projection of No 28. Although there would be some undeniable change, the dwelling would merely alter and add to the variation in building lines to this side of the road. I am not persuaded that the change would be significant or harmful.
Overall, I am satisfied that the remodelled form of No 28 would be comfortable in its setting, without harm to the wider character or appearance of the area. As such, there would be no conflict with Policy DM10 of the Croydon Local Plan (CLP) adopted in 2018, particularly parts DM10.1 and DM10.7 which seek to ensure development creates a high-quality built environment by contributing to the character of the local area and which is sympathetic with its context. For the same reasons there would be no conflict with the similar requirements of CLP Policy SP4.1 or with Policy D4 of The London Plan 2021 (TLP).
Section 05
[name]
TLP Policy D12 requires all development proposals to achieve the highest standards of fire safety and sets out six criteria to be satisfied. Paragraph 3.12.1 of the TLP states that fire safety of developments should be considered from the outset. The application made to the Council did not include any details in relation to fire safety. The appellant has stated that this was a simple omission error but yet no further details were provided at the appeal stage. Instead, the appellant has suggested a condition be imposed requiring the submission of a fire strategy.
I have carefully considered if this would be a suitable way to address this matter. The Planning Practice Guidance: Use of Planning Conditions states that ‘if a detail in a proposed development, or the lack of it, is unacceptable in planning terms the best course of action will often be for the applicant to be invited to revise the application’ (paragraph 012). It is not clear to me whether the Council requested any such details either when the application was submitted or during the course of the application prior to refusing permission in order to allow the applicant to address this matter. Regardless, it is clear to me that addressing the issue of fire safety in accordance with Policy D12 may have spatial implications for the layout and design of the development.
From the information available to me as part of this appeal, I cannot be certain that compliance with Policy D12 would not involve change to the layout of the scheme. This could be significant. The lack of detail in addressing fire safety means that I have no assurance that the matter can be satisfactorily addressed. The imposition of a condition after the grant of planning permission would therefore be inappropriate in this case.
Section 06
Conclusion
Notwithstanding my findings on the first main issue, the absence of detail regarding fire safety at both the application and appeal stages is contrary to TLP Policy D12. This leads me to conclude that the proposed development does not make adequate provision for fire safety. In the absence of any material considerations that would indicate otherwise, I have determined the appeal in accordance with the development plan. Accordingly, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 286No official casework-database value to compare
- Extracted site visit dates
- 23 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3333005
- Application reference
- 23/03051/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 13 November 2023
- Valid date
- 13 November 2023
- Start date
- 18 December 2023
- Planning authority decision date
- 28 September 2023
- Appeal decision date
- 8 February 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 46295
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21