Skip to main content
Official casework recordDismissedCurrent release

Appeal 3333362

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural matters

    The appellant’s surname is spelt differently on the planning appeal form compared to that given on the application form lodged with the Council. As the right of appeal rests solely with the original applicant, I have proceeded on the basis that [name] is the appellant in this case.

    Since the appeal was lodged, a revised National Planning Policy Framework (the Framework) has been published. The Framework does not raise any new matters that are determinative to the outcome of this appeal.

  3. Section 04

    Main issue

    The main issue is the effect of the proposed development on the living conditions of the occupiers of [address] and [address] with particular regard to visual impact and light.

  4. Section 05

    Reasons

    The proposal is to introduce a full width ground floor extension at the back of the appeal property, which is a semi-detached house within a predominantly residential area. The new addition would project outwards from the existing rear wall by about 3-metres into the back garden, which gently slopes downwards away from the main house.

    Of the properties close to the site, it is the occupiers of [address] and [address] that are most likely to be affected by the proposal. No 3 is attached to the appeal dwelling and the rear garden of No 9 backs onto the opposite side of the site. A new flank wall would run alongside the shared boundaries with each of these neighbouring properties and the proposal would be visible from their back gardens and rear windows.

    By significantly lengthening the existing sidewall that is close to and parallel with the common boundary with No 3, the proposal would further enclose the external space that is closest to the main house. Because this garden area is close to the rear elevation of No 3 it is likely to be most used and therefore of particular value to the neighbouring occupiers. The new flank wall is also likely to be evident at close range from the ground floor rear windows of No 3. Due to its rearward projection, height, and position, I consider that the presence of this lengthy blank wall would feel unduly imposing to the occupiers of No 3.

    There would also be some loss of sunlight and daylight to the rear of No 3 due to the overshadowing effect of the proposal just to the east. The loss of natural light would be most pronounced during the early morning and in winter months when the sun is lower in the sky. The effect of overshadowing would accentuate the visual impact of the new extension, causing it to overbear on the occupants of No 3 when viewed from the rear of their property.

    The appeal scheme would be some distance from the rear windows of No 9 and the boundary treatment along this shared boundary would already cause some overshadowing of its rearmost garden. Consequently, the additional loss of natural light due to the proposal would be modest in both extent and duration. Overall, the main outlook from the rear of No 9 and the main source of natural lighting would not be significantly affected. Consequently, the living conditions of the occupiers of No 9 would not be materially reduced.

    Nevertheless, I conclude on the main issue that the proposed development would materially harm the living conditions of the occupiers of No 3. As such, it conflicts with Policy DMP1 of the Brent Local Plan 2019-2041 and the advice within the Council’s Supplementary Planning Document, [name] & Alterations (SPD2) insofar as they aim to safeguard residential amenity. It is also contrary to the policies of the Framework, which seek to ensure a high standard of amenity for existing and future users.

  5. Section 06

    Conclusion

    Overall, the development conflicts with the development plan, when read as a whole. There are no material considerations, including those of the Framework, which indicate that the decision should be taken otherwise than in accordance with the development plan.

    For the reasons set out above, and having regard to all other matters raised, including the absence of objections from others, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    27 February 2024Matches the official casework database
    Extracted site visit dates
    20 February 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3333362
Application reference
23/2126
Lead case reference
Not recorded
Planning authority
London Borough of Brent
Planning authority code
E09000005

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
17 November 2023
Valid date
17 November 2023
Start date
29 November 2023
Planning authority decision date
1 September 2023
Appeal decision date
27 February 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
47224
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21