Appeal 3333531

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as a two storey side and rear extension and replacement garage

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a two storey side and rear extension and replacement garage at [site address] , Burbage, Leicestershire [postcode] in accordance with the terms of the application, Ref: 23/00633/HOU, dated 27 June 2023, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plan referenced WA 619 (04) 01 – Location Plan WA 619 (04) 02 – [name] and First Floor Plan WA 619 (04) 03 – [name] and Roof Plan WA 619 (04) 04 – [name] 619 (04) 05 – [name] and First Floor Plan WA 619 (04) 06 – Proposed Roof Plan WA 619 (04) 07 – [name] 619 (04) 08 – [name] 619 (04) 09 – Proposed Site Plan

    No development above damp proof course level shall be carried out until details of the external wall and roof materials have been submitted to the Local Planning Authority, and approved in writing. The development shall be carried out using these approved materials.

  2. Section 03

    Procedural Matters

    The description of development in the banner heading and formal decision above has been taken from the Council’s decision notice which differs from that within the application form. Neither of the main parties has provided written confirmation that a revised description of development has been agreed. However, I have used the one given on the decision notice as it is more accurately describes the development proposed.

    The Council’s decision notice makes reference to specific paragraphs of the National Planning Policy Framework (the Framework). A revised version of the Framework was published, with immediate effect, on 19 December 2023. The revised Framework is a material consideration and its content should be taken into account in decision making. Main parties have been given an opportunity to comment on the new Framework and I have taken into account any subsequent comments received in arriving at my decision.

  3. Section 04

    Main Issue

    The main issue is the effect of the development on the character and appearance of the dwelling and surrounding area.

  4. Section 05

    Reasons

    The appeal site is a two-storey detached dwelling of red brick and tile construction with a prominent asymmetrical roadside facing gable. The dwelling has an attached flat roofed garage to the side. Mature landscaping, both on and off the site, provides a verdant setting for the dwelling, screening the approach to the property along [address] in both directions.

    [address] has two distinct character areas. The dwellings around the junctions with [address] and [address] East are more individual in design, comprising a variety of form, appearance and a mixed palette of materials. Further along [address], away from [address], the pattern of development becomes more uniformed. The appeal dwelling is located within the varied character area and has an individual design.

    The Council has raised no particular concern with regard to the red brick flat roof garage to the side and front, nor the more contemporary two-storey extension to the side and rear1. I have no reason to disagree with their assessment in this regard. The Council’s primary concern relates to the design and appearance of the proposed first floor flat roof link between the existing dwelling and two storey side/rear extension.

    The two-storey elements of the extension would be positioned deep into the site, set back from the existing front building line. This set back would ensure that the existing prominent gable would remain the most dominant feature of the dwelling. The proposed link would be set at a lower height to both the existing dwelling and that of the larger side/rear extension. The set down is considerable and would result in a visually subservient element of the scheme.

    The use of green zinc facing materials would contrast with the red brick and tile construction of the dwelling. The proposed rear/side extension would be constructed from alternative materials, including zinc cladding, to which the 1 [name] 8.7 and 8.8 Council raise no objection. The Good Design Guide Supplementary Planning Document 2019 (the SPD), at page 14, advises that “Choosing the right materials can greatly help new development to fit harmoniously with its surroundings. They may not have to match, but colour, texture, grain and refectivity can all support harmony”. The ratio of green zinc to the front elevation would be modest compared to extent of red brickwork, which would remain the prominent building material. In addition, its colour would complement the verdant surroundings of the site, while providing a visual transition between existing dwelling and more contemporary two storey side/rear extension. Given the variety of designs and use of materials in the surrounding area it is considered that the modest use of green zinc to the front elevation can be incorporated into the scheme without appearing incongruous to the dwelling or surrounding area.

    The link would include a flat roof with chamfered roof to the side. The chamfered roof is similar in pitch to both the gable of the main dwelling and that of the rear/side extension. The form of the link would therefore visually complement both the existing dwelling and proposed extension to its rear. I acknowledge that the SPD advises that flat roofs may not usually be acceptable where visible from the public realm2. However, the SPD goes on to state that there are instances where they may be acceptable, particularly where they reduce visual impact and are designed with a contemporary aesthetic style. A contemporary approach is adopted for the design of the extensions. Together, the setback, subservience in scale and use of contrasting materials would ensure that the flat roof link would not be visually prominent or harmful to the host dwelling.

    A large, single pane, full height window is proposed within the link which contrasts with the multi-pane windows in the existing dwelling. The lintel height and the width of the opening is similar to the existing openings at first-floor level. Therefore, this window would visually align with the existing, while its appearance appropriately reflects the contemporary design approach of the extension.

    The first floor set back of the extension would mean that the contemporary components of the extension are sited deeper into the plot and, as such, would not be prominent. The established landscaping would screen the extension when approaching the site. Views of the extension would largely be limited to the street immediately to the front of the property. The siting and screening, along with the established mixed variety of building designs in the area, is such that the proposal could be provided without appearing prominent on the streetscene or out of context with its surroundings.

    The concerns of the Burbage Parish Council, with regard to the proposed materials, are noted. However, as I have identified above, the variety of building designs in the area mean that the use of such materials can be incorporated into the scheme without causing harm to the character of the dwelling or area.

    For the above reasons, the proposal would not be harmful to the character and appearance of the dwelling or surrounding area. Therefore, the proposed development would accord with Policy DM10 of the Hinckley & Bosworth Borough Council Site Allocations and Development Management Policies 2 Development Plan Document (2016); Policy 2 of the Burbage Neighbourhood Plan (2021); the SPD; and, the Framework. Together, amongst other things, these seek to achieve high quality design in new developments and providing development which complements or enhances the surrounding area.

  5. Section 06

    Conditions

    I have imposed standard conditions relating to the commencement of development, and to require compliance with the submitted plans for certainty. A condition requiring the details of materials to be submitted to the LPA for approval is also necessary in the interest of the character and appearance of the area.

  6. Section 07

    Conclusion

    For the above reasons the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5832No official casework-database value to compare
    Extracted decision date · page 1
    7 February 2024Matches the official casework database
    Extracted site visit dates
    16 January 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3333531
Application reference
23/00633/HOU
Lead case reference
Not recorded
Planning authority
Hinckley and Bosworth Borough Council
Planning authority code
E07000132

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
164 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
20 November 2023
Valid date
23 November 2023
Start date
15 December 2023
Planning authority decision date
14 September 2023
Appeal decision date
7 February 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
46181
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21