Appeal 3333817
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of existing dormer and construction of first floor rear extension, including new flat roof to ground floor extension; alterations to rear fenestration.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
In the interests of clarity, the description used in the above banner heading is taken from the decision notice and appeal form as this more accurately describes the works proposed.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the area.
Section 05
Reasons
The appeal property is a detached dormer bungalow with a generous, steeply pitched roof. It is located within a residential area. In the vicinity of the appeal site, there are a mix of bungalows and 2 storey dwellings, constructed of a mixed material palette.
Dwellings with dormer windows and incremental additions and alterations are evident in the street scene. In this part of [address], I observed that dormer windows are generally contained within the original roof slope, set in from the verges of the principal roof and set down from the ridge. Dormers project out from the central part of the roof slope, rather than rising directly from the eaves and being aligned with the rear wall of the dwelling. As such, dormers are subservient to the principal dwelling, the massing and roof form of which remains clearly legible.
[name] note that the proposal has been slightly reduced in size since a previously refused scheme, it would only be marginally set in from the roof verges, down from the ridge and back from the rear wall of the dwelling, and so would obscure the roof form and subsume the parent dwelling.
The scale and mass of the proposed extension would be a disproportionate addition to the single storey host property and would visually dominate it.
For these reasons, the proposed extension would not form a satisfactory composition, rather it would appear as a discordant feature, resulting in disharmony, to the detriment of the character and appearance of the dwelling.
The proposed materials would be similar to those found on the existing rear dormer and would match the roof. However, by reason of the scale, design, form and massing of the first-floor extension, it would not be legible as a dormer projecting from the roof. Therefore, tile cladding would appear incongruous.
Although located at the rear of the dwelling, I observed that the existing rear dormer is visible in places in the street scene. As the scale and mass of the proposed first-floor extension would be significantly greater, this would have a greater visible presence. [name] accept that in such views the proposal would not be visible in its entirety, the emphasis on good design in both national and local policies is not dependant on visibility from the public realm.
Alterations and extensions that include a number of flat roof dormers in the vicinity are noted. I am not familiar with the history of the dormer windows identified by the appellant, but the Council has confirmed that in most cases, these dormers are original features of the host dwelling, rather than retrofitted. Furthermore, these dormers predate the Council’s current design guidance that provides specific guidance on alterations and extensions to dwellings. Whilst some of these dormers are large, they are contained within the original roof space and do not fill the entire roof slope as the proposal would do. Therefore, these dormers are not directly comparable with the appeal scheme and do not justify the harmful development proposed here. In any case, the proposed extension is not a dormer but a first-floor rear extension on a bungalow. Such extensions are not a common feature in the area and those I saw confirmed that such extensions are detrimental to both the host property and the surrounding area and so do not set a precedent to follow.
For these reasons, the proposed development would be detrimental to the character and appearance of the host building and the area. Therefore, the proposal would be contrary to policies P10 of the [name] 2019 and BD6 and GP5 the Leeds Saved Unitary Development Plan (2006). Taken together these require good contextual design, appropriate size, and for extensions to respect the scale and form of the original building.
The proposed development also conflicts with the aim of achieving well-designed and beautiful places identified in chapter 12 of the National Planning Policy Framework.
Section 06
Other Matters
The potential benefits to the appellants and occupiers of the appeal property arising from the proposed development are acknowledged, not least in addressing the structural condition of the appeal dwelling, and the issue of water ingress. However, the need to address these issues does not preclude good contextual design and so these issues do not justify the proposed development and the consequent I have identified it would cause. As such, I attribute little weight to these issues.
Section 07
Conclusion
Notwithstanding the benefits to the appellants and occupiers of the appeal property, I have found that the proposed development would conflict with the development plan when read as a whole and there are no other considerations, which outweigh this finding.
The appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5474No official casework-database value to compare
- Extracted decision date · page 1
- 15 November 2024Matches the official casework database
- Extracted site visit dates
- 12 March 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3333817
- Application reference
- 23/05453/FU
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 50 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 24 November 2023
- Valid date
- 24 November 2023
- Start date
- 29 November 2023
- Planning authority decision date
- 27 October 2023
- Appeal decision date
- 15 November 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 60043
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21