Skip to main content
Official casework recordDismissedCurrent release

Appeal 3333817

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

demolition of existing dormer and construction of first floor rear extension, including new flat roof to ground floor extension; alterations to rear fenestration.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    In the interests of clarity, the description used in the above banner heading is taken from the decision notice and appeal form as this more accurately describes the works proposed.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the area.

  4. Section 05

    Reasons

    The appeal property is a detached dormer bungalow with a generous, steeply pitched roof. It is located within a residential area. In the vicinity of the appeal site, there are a mix of bungalows and 2 storey dwellings, constructed of a mixed material palette.

    Dwellings with dormer windows and incremental additions and alterations are evident in the street scene. In this part of [address], I observed that dormer windows are generally contained within the original roof slope, set in from the verges of the principal roof and set down from the ridge. Dormers project out from the central part of the roof slope, rather than rising directly from the eaves and being aligned with the rear wall of the dwelling. As such, dormers are subservient to the principal dwelling, the massing and roof form of which remains clearly legible.

    [name] note that the proposal has been slightly reduced in size since a previously refused scheme, it would only be marginally set in from the roof verges, down from the ridge and back from the rear wall of the dwelling, and so would obscure the roof form and subsume the parent dwelling.

    The scale and mass of the proposed extension would be a disproportionate addition to the single storey host property and would visually dominate it.

    For these reasons, the proposed extension would not form a satisfactory composition, rather it would appear as a discordant feature, resulting in disharmony, to the detriment of the character and appearance of the dwelling.

    The proposed materials would be similar to those found on the existing rear dormer and would match the roof. However, by reason of the scale, design, form and massing of the first-floor extension, it would not be legible as a dormer projecting from the roof. Therefore, tile cladding would appear incongruous.

    Although located at the rear of the dwelling, I observed that the existing rear dormer is visible in places in the street scene. As the scale and mass of the proposed first-floor extension would be significantly greater, this would have a greater visible presence. [name] accept that in such views the proposal would not be visible in its entirety, the emphasis on good design in both national and local policies is not dependant on visibility from the public realm.

    Alterations and extensions that include a number of flat roof dormers in the vicinity are noted. I am not familiar with the history of the dormer windows identified by the appellant, but the Council has confirmed that in most cases, these dormers are original features of the host dwelling, rather than retrofitted. Furthermore, these dormers predate the Council’s current design guidance that provides specific guidance on alterations and extensions to dwellings. Whilst some of these dormers are large, they are contained within the original roof space and do not fill the entire roof slope as the proposal would do. Therefore, these dormers are not directly comparable with the appeal scheme and do not justify the harmful development proposed here. In any case, the proposed extension is not a dormer but a first-floor rear extension on a bungalow. Such extensions are not a common feature in the area and those I saw confirmed that such extensions are detrimental to both the host property and the surrounding area and so do not set a precedent to follow.

    For these reasons, the proposed development would be detrimental to the character and appearance of the host building and the area. Therefore, the proposal would be contrary to policies P10 of the [name] 2019 and BD6 and GP5 the Leeds Saved Unitary Development Plan (2006). Taken together these require good contextual design, appropriate size, and for extensions to respect the scale and form of the original building.

    The proposed development also conflicts with the aim of achieving well-designed and beautiful places identified in chapter 12 of the National Planning Policy Framework.

  5. Section 06

    Other Matters

    The potential benefits to the appellants and occupiers of the appeal property arising from the proposed development are acknowledged, not least in addressing the structural condition of the appeal dwelling, and the issue of water ingress. However, the need to address these issues does not preclude good contextual design and so these issues do not justify the proposed development and the consequent I have identified it would cause. As such, I attribute little weight to these issues.

  6. Section 07

    Conclusion

    Notwithstanding the benefits to the appellants and occupiers of the appeal property, I have found that the proposed development would conflict with the development plan when read as a whole and there are no other considerations, which outweigh this finding.

    The appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5474No official casework-database value to compare
    Extracted decision date · page 1
    15 November 2024Matches the official casework database
    Extracted site visit dates
    12 March 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3333817
Application reference
23/05453/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
50 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 November 2023
Valid date
24 November 2023
Start date
29 November 2023
Planning authority decision date
27 October 2023
Appeal decision date
15 November 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
60043
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21