Skip to main content
Official casework recordAllowedCurrent release

Appeal 3335000

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a single storey side and front wrap-around extension with a hipped roof.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of a single storey side and front wrap-around extension with a hipped roof at [site address] in accordance with the terms of the application, Ref 23/05316/FU, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan, Block Plan, and drawing reference number 134/101D.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the construction of the exterior of the existing building.

  2. Section 03

    [name]

    The application form refers solely to the erection of an extension, but the decision notice includes additional reference to replacement hardstanding to the front and side. However, there are no specific details of any proposed hardstanding on the plans submitted and it is unclear whether the appellant was in agreement with the change of description. I have therefore made my assessment of the proposal on the basis of the description of development set out on the application form.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the surrounding area.

  4. Section 05

    Reasons

    There is great variation in the design, scale and layout of dwellings in the area that surrounds the appeal site and beyond. However, the appeal dwelling sits within a row of three identical pairs of semi-detached dwellings, none of which have been altered in any notable way to their front or side elevations. This creates a pleasant and visually coherent row of dwellings within this section of the street scene, in particular in views taken down [address]. Collectively, these dwellings contribute positively to the character and appearance of the surrounding area.

    The effect of the proposal would be to disrupt this symmetry by adding the ground floor wrap-around extension to the host dwelling. It would visually set it apart from the unaltered other semi-detached dwellings in the row. Due to the surrounding topography and the prominent position of the appeal dwelling within the street scene, close to the wide junction with [name] and set forward from [address], the proposed development would be particularly noticeable. Therefore, although only of a relatively small scale, what is proposed would nonetheless cause visual harm to the host dwelling and the street scene.

    Consequently, the proposal would fail to accord with the aims of Policies P10 and P12 of the [name] 2019 and Policies GP5 and BD6 of the Unitary Development Plan 2006 where they seek to protect character and appearance. There would also be a conflict with the aims of Policy HDG1 of the Householder Design Guide Supplementary Planning Document 2012 in the same respect and with the National Planning Policy Framework where it seeks to achieve well-designed and beautiful places.

  5. Section 06

    Other consideration

    The appellant states that if this appeal is unsuccessful, they will look to undertake a similar extension using permitted development rights. This would take the form of a separate front porch and side extension, without the wrap-around section. They also highlight that a side extension could, under permitted development rights, be considerably wider than what they currently propose, and a porch could be larger in size. The Council seemingly does not dispute that an alternative development would be possible as permitted development, and indeed they suggested to the appellant during the course of the planning application that this is a route that they could consider pursuing.

    In order to establish whether a fallback position is a material consideration, the courts have set out there should be a greater than a theoretical possibility that the alternative development might take place, or in other terms a real prospect of the fallback being implemented. It seems clear to me that the appellant is actively seeking to extend their dwelling to meet their current needs, and they have gone through the process of submitting a planning application and this appeal with that aim in mind. Although the Council makes reference to the appellant having stated that what could be achieved under permitted development rights would not meet their needs, faced with the alternate option of no new floorspace I am satisfied that there is a real prospect that they would utilise permitted development rights. This is consistent with the position they set out in their Statement of Case.

    The principal effect of building a porch to the front and an extension to the side would be the same as the effect from building the proposed development, in that the appearance of the host dwelling and the symmetry of the row of semi-detached dwellings would be disrupted and visual harm would be caused. The impact would be the same as the appeal proposal in that scenario. Furthermore, what is proposed is modest in scale and there would be a greater visual impact if a wider side extension and/or a larger porch were built instead. There would appear to be a distinct possibility of that occurrence with the side extension in particular, as there would be likely to be some need to compensate for the loss of floorspace that would have been provided by the wrap-around section. This means that it is entirely possible that what might be built under permitted development rights would have a more harmful visual impact than the appeal proposal.

  6. Section 07

    Planning Balance

    I have found that there would be a conflict with the development plan due to the impact on the character and appearance of the host dwelling and the street scene that would arise. However, for the reasons I have set out the fallback position carries significant weight in support of the development, in particular as there is a real prospect that it would be implemented, and it would have the same or potentially a more harmful visual impact than the appeal proposal. This consideration justifies the permitting of a development that fails to accord with the relevant policies of the development plan.

  7. Section 08

    Conditions

    Conditions setting out the period to commence development and the approved plans are required to provide certainty. Due to the prominent location of the proposal, it is necessary to impose a condition requiring the use of matching facing materials, in the interests of providing an acceptable visual finish. There is no apparent intention to provide windows in the side elevation of the proposal and in any event such windows would be at ground floor level, offset from the common boundary and would not directly face the adjacent dwellinghouse. The condition suggested by the Council with regard to the future insertion of such windows is therefore not necessary.

  8. Section 09

    Conclusion

    For the reasons given above, the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 183No official casework-database value to compare
    Extracted decision date · page 1
    13 March 2024Matches the official casework database
    Extracted site visit dates
    5 March 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3335000
Application reference
23/05316/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
20 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 December 2023
Valid date
18 December 2023
Start date
4 January 2024
Planning authority decision date
24 October 2023
Appeal decision date
13 March 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
48125
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21