Appeal 3335623
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Proposal is to construct an additional storey on top of the 3-storey building at [site address] . This proposal is to build one additional bedroom and one bathroom to the property in line with the London Plan (2021) accommodation standards.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Development is permitted under Article 3 and Schedule 2, Part 1, Class AA of the GPDO for the enlargement of a dwellinghouse by construction of additional storeys, subject to limitations and conditions, as set out at paragraphs AA.1 and AA.2.
The Council’s decision notice differs from the banner heading as it describes the development as ‘Determination as to whether prior approval is required for the erection of additional storey to dwellinghouse’. I concur this accurately and succinctly describes the proposal before me.
Section 04
Main Issue
The main issue is whether prior approval should be granted for the external appearance of the dwellinghouse.
Section 05
Reasons
The site lies in a residential street that is characterised predominantly by two-storey terraced dwellings. The appeal site is part of an identical pair of three-storey dwellings over a basement attached to the end of a terrace of houses and located close to the junction with the local amenities along [address]. To the same side as the appeal dwelling, [address] consists of traditional Victorian terraces of the same rhythm and style, built in pairs. The opposite side of the street is built as a terrace of houses that share the same archetypal design characteristics but are of a later possibly mid-20th Century construction.
The appellant has provided evidence with the appeal of the planning history behind the pair of houses for me to understand. The appeal site and its attached neighbour, Number [address] are notable in the street scene as they are a pair of new-build houses built to a contemporary style. They are symmetrical in design. I could see that the appeal site and its attached new build neighbour have been intentionally designed as, broadly speaking, a modern interpretation of the terrace of older houses that it adjoins. They are visually distinctive from the other houses along [address] but in the words of the previous Inspector, he concluded that the houses ‘In this context, it would not appear excessive in scale or height’.
Overall, despite the different house types and styles seen to both sides of the street, and even with the addition of these new builds, to my mind it has a cohesive appearance and rhythm which makes a positive contribution to the character of the area.
[name].2.(3)(a)(ii) of Class AA requires prior approval to be sought for ‘the external appearance of the dwellinghouse, including the design and architectural features of (aa) the principle elevation of the dwellinghouse, and (bb) any side elevation of the dwellinghouse that fronts a highway.’ The use of the word ‘including’ means that the lists that follow are not exhaustive and that other factors could affect the external appearance of the dwellinghouse. Furthermore, the wording of (aa) and (bb) suggests that some assessment should be made of how the dwellinghouse would appear in the street scene, as otherwise alterations could be made to the design and architectural features that could be considerably at odds with the surrounding area.
The proposal would add an additional storey to No. 2B at approximately 2.85m in height and nearly the full width of the dwelling. The extension has been designed in a mansard style with a combination of glazing and zinc cladding to its elevations.
The upper three floors of this dwelling share proportionality to their scale and height. The extra storey proposed would sit atop the flat roof adding further scale, mass and bulk. Even if the dwelling already incorporates a mansard design, this is not highly visible, but this mansard roof at approximately 2.85m in height and its width at nearly the full width of the dwelling with its unusual set-back would, as a combination, create uncharacteristic additional height and massing to the dwelling. Consequently, it would be a new and incongruous feature to a prominent part of the dwelling. It would negatively alter the proportions of the building to such an extent that it would adversely detract from the external appearance of the appeal site.
It is demonstrated by the submission that the extension would be visible from street level. The proposed extension would unacceptably change the external appearance of the dwelling and therefore negatively affect how the dwelling appears within the street scene where it would take on the characteristics of appearing detrimentally taller and out of scale with the other adjoining houses.
The appellant points to no conflict raised by the Council in all other areas of criteria to which the proposal has been assessed against. The appellant has gone to lengths to demonstrate examples of other similar style extensions locally where they consider there is a precedent for this type of extension. However, there is limited information before me on their precise details but nevertheless, as is my duty, I have assessed the proposal in line with the requirements of the Schedule and reached my own judgment and decision on the matter. Each decision is determined on its own individual merits.
Section 06
Conclusion
The proposal would fail to satisfy the broad aims of the National Planning Policy Framework in so far as they relate to character and appearance. Therefore, prior approval is refused.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 296No official casework-database value to compare
- Extracted decision date · page 1
- 26 June 2024Matches the official casework database
- Extracted site visit dates
- 20 May 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3335623
- Application reference
- 2023/3037
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Wandsworth
- Planning authority code
- E09000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 29 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 December 2023
- Valid date
- 7 January 2024
- Start date
- 22 March 2024
- Planning authority decision date
- 16 October 2023
- Appeal decision date
- 26 June 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53072
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21