Skip to main content
Official casework recordDismissedCurrent release

Appeal 3335649

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single storey kitchen and utility extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    A revised National Planning Policy Framework (the Framework) was published in December 2023, but there are no material changes relevant to the main issue for this appeal.

    Amended plans were submitted during the course of the application, which the Council used to make their decision. For the avoidance of doubt I have assessed the appeal based on the amended plans.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the property and surrounding area.

  4. Section 05

    Reasons

    The appeal property is a large, previously altered semi-detached two story dwelling that is part of a pair with the adjacent property, The Lees. The appeal property is orientated with its frontage facing south and its side elevation fronting [site address] . The semi-detached pair is part of a linear run of dwellings with spacious grounds set back from [site address] .

    The appeal proposal comprises a side extension with a crown roof to provide an enlarged kitchen and utility room. The proposal would replace an existing single storey projection albeit with a greater width and depth than the current structure. Materials would be finished to match the host dwelling.

    The proposed extension would increase the overall width of the dwelling and bring the building line closer to [site address] . Whilst the appeal dwelling is of a substantial size and the proposal in floorspace terms comparatively modest, the proposed extension would appear as a disproportionate addition due to its excessive width. The proposal’s width would be exacerbated by the proposed crown roof and flat roof component, and setting back from the frontage that when read together with the overall width of the proposal would appear as an unduly elongated and uncharacteristic addition.

    I further note that crown roofs are not a prevailing characteristic of the area with the vast majority of dwellings, and associated extensions and outbuildings, using hipped or gabled roofs. Indeed, the host dwelling in this appeal has a hipped and gabled roof structure. Due to the excessive width of the proposal, the proposed crown roof and flat roofed element would be overly prominent and not relate well to the character and appearance of the existing dwelling and its roof design.

    I have also considered the degree to which the proposal complies with the [name] Planning Document (SPD). Principle DG49 requires extensions to be well-integrated with the existing scale, form and massing allowing the original building to remain the dominant element of the property whether it has one or several additions. Principle DG50 advises that side extensions should normally be subservient to the original dwelling and typically set back from the frontage. Whilst some elements of the SPD are met in this case, I find that the overly wide appearance and use of the uncharacteristic crown roof would not accord with key guidance in the SPD to deliver development that is well-integrated with the original building.

    The Council further contend that the proposal would harm the street scene by obscuring an important local gap that contributes positively to the spaciousness of the area as it moves from being built up area to the countryside. As observed on my site inspection, the gaps between dwellings and the road have a positive contribution to the spacious feel and character of the area. That said, and as highlighted by the appellant, other developments have been approved nearby within spaces, including the adjacent garage at The Lees. These other developments demonstrate that it is possible to build well designed structures within the spaces between buildings and the roads without harming the overriding spacious character of the area. However, in contrast to the appeal proposal these other examples are proportionate and appropriate buildings within their individual settings.

    In this case, the excessive width of the proposal would bring the built form closer to the boundary into the existing space with a discordant design that would harm the character and appearance of the street scene. Whilst there is boundary treatment and a backdrop of existing development, the proposal and its disproportionate width and incongruous roof from would still be visible from some public vantage points. I find, therefore, that the proposal is not consistent with Principle DG50 of the SPD in terms of the proposal responding appropriately to the character of the street form.

    I understand that the existing kitchen is cramped and in need of replacement and the existing lean-to results in heat loss, as well as additional space being needed to meet the appellant’s family needs. [name] have sympathy for these matters, they do not have sufficient weight to outweigh my concerns with the design of the appeal proposal as less harmful extension options are potentially available given the size of the plot.

    The Council officer’s report identifies that the appeal property has potential to be considered as a non-designated heritage asset. However, the report concludes, in agreement with the Council’s Conservation Officer advice, that due to limited information being available and its significance being affected by previous alterations, no objections on heritage grounds could be sustained. In addition, I agree with the Council that the Conservation Officer’s advice was not ignored in the assessment of the application. Notwithstanding this, all parties are agreed that heritage is not a matter of dispute in this appeal. Accordingly, I agree with the Council’s conclusions on heritage matters made at the application stage that the proposal in this regard complies with Policy DP34 of the Mid Sussex District Plan 2014-2031 (the Local Plan) and the relevant paragraphs of the NPPF.

    To conclude, the proposal would harm the character and appearance of the area including street scene due to its width and uncharacteristic crown roof, which would appear as an overly wide development that would not relate well to the host dwelling. Accordingly, the proposal conflicts with Policy DP26 of the Local Plan, which amongst other things requires development to be of high quality design and layout that create a sense of place whilst addressing the scale and character of the surrounding buildings. The proposal is also not consistent with the advice in the [name].

    The proposal also conflicts with paragraph 135 of the Framework and the National Design Guide, which seek to ensure that developments have a high standard of design appropriate to their site and surrounds.

  5. Section 06

    Conclusion

    For the reasons given above, the proposal does not accord with the policies of the development plan as a whole and there are no material considerations, including the SPD, which indicate planning permission should be allowed. I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6440No official casework-database value to compare
    Extracted decision date · page 1
    3 June 2024Matches the official casework database
    Extracted site visit dates
    25 April 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3335649
Application reference
DM/23/0207
Lead case reference
Not recorded
Planning authority
Mid Sussex District Council
Planning authority code
E07000228

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 December 2023
Valid date
18 December 2023
Start date
22 February 2024
Planning authority decision date
3 October 2023
Appeal decision date
3 June 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
51888
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21