Skip to main content
Official casework recordAllowedCurrent release

Appeal 3335665

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the enlargement of the existing basement including a front lightwell.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the enlargement of the existing basement including a front lightwell, at [site address] , Chiswick, London, [postcode] , in accordance with the terms of the application, Ref: 00430/35/P3, dated 2 August 2023, subject to the conditions set out in the Schedule below.

  2. Section 03

    Main Issue

    The main issue in this case is the effect of the proposal on the character and appearance of the host property and the wider Bedford Park Conservation Area.

  3. Section 04

    Reasons

    No 35 is a three-storey, brick-built, mid-terraced house situated on the western side of [address]. [address] lies within the Bedford Park Conservation area. Houses along the road are of varied design and all have modest sized front gardens. At the time of my visit, the appeal property was undergoing renovation work and the front garden was fully used for storage of waste materials, with security fencing all around. The appeal proposal involves the extension downwards of the existing cellar, remaining as a single floor, to become a larger basement area, both in terms of height and depth, along with the provision of a lightwell with a surface grille beneath the front window.

    Policy CC1 of the Council’s Local Plan Volume One (LP) indicates that new development should conserve or enhance particular qualities that contribute to an area’s character. Policy CC2 indicates that new development should respond meaningfully and sensitively to the site, its characteristics, and its surroundings. Policy CC4 indicates that proposed extensions to a heritage asset should be in keeping with the character of the building and harmonious with its surroundings and the wider character of the area. Policy SC7 indicates that residential extensions should complement the original building; harmonise with adjoining properties; maintain the character of the general street scene; and have regard to the character, materials and scale of the principal building.

    The Council’s Residential Extensions Guide (SPD) indicates that basements should not harm the character of the property or the surrounding area and that the depth of the basement should be no deeper than a single subterranean floor to ensure the development remains sustainable. In addition, unless visible lightwells are a characteristic of other buildings in the street, new lightwells should be of a modest depth and extend no more than 1m from the front wall of the building. Finally, front lightwells should be screened from the street by boundary treatment and landscaping to avoid changing the character of the street scene.

    The Council contends that the proposed basement and the excavation of a front lightwell, by reason of its position, size and scale, would be an incongruous development, out of scale, compromising character, quality and integrity of the dwelling's unique and historic scale and architectural style, harmful to the character and appearance of the terrace and streetscene.

    The appellants contend that, whilst most of the houses within the CA were constructed without basements, houses along [address] were built with basements. Moreover, the proposal, including the lightwell, would comply with guidelines on basements as contained in the SPD, and would preserve the character and appearance of the CA.

    The CA character appraisal identifies variety in the layout and the siting of individual houses. In addition, ‘carefully designed front garden walls and fences also play a crucial part in the composition, where the intention appears to have been for a variety of boundaries rather than a consistent approach per street, providing interest rather than uniformity’. One of the pressures facing the CA is listed as a desire to create basements in order to extend properties, which can be detrimental to the character of country-style buildings of gaps and wide footprint rather than high-density town-houses. The appraisal also notes that excavation for cellars is not in accordance with the original philosophy and is alien to the character of the buildings and their front gardens.

    In the case of [address], it would appear that most, if not all, properties already have cellars, as evidenced by the number of dwellings with small windows or vents beneath front windows. Some now also have lightwells in the front garden area, indicating that the cellars have been extended into basements. These are chiefly in the vicinity of the appeal property and include developments at Nos 28 and 31 which were granted permission subsequent to publication of the [name]. In each of these cases, with which the proposal at No 35 would be very similar, the Council acknowledged that the development would not be detrimental to, or adversely harm, the character and appearance of the site or the CA. Having seen these, and other similar examples in the vicinity, I concur with that perspective..

    The Council has made reference to a recent dismissed appeal relating to No [address], which also lies within the CA. In this case, the proposal concerned the excavation of a basement and the creation of two lightwells at what appears as a small cottage-style property. It would seem that, unlike the larger appeal property, No 10 does not have an existing cellar, and that the lightwell would be a more prominent and intrusive feature in its small front garden. In the current scheme at No 35, the dwelling has an existing cellar and the lightwell would have a depth of only 0.9 metres beyond the front elevation of the house. Moreover, the visual impact of the lightwell could be minimised by planting to the front boundary, as is the case with other nearby examples. This could be secured by means of an appropriate condition.

    In conclusion on this issue, I find that the proposed basement and lightwell would not be harmful to the character or appearance of the host property, the immediate surroundings, or the wider CA. On this basis the proposed development would not conflict with Policies CC1, CC2, CC4 and SC7 of the LP, nor with guidance on basements in the SPD.

  4. Section 05

    [name]

    In its decision notice, the Council referred to the proposal as having a serious and adverse effect on the amenities enjoyed by residents of the area. It is not made clear what these effects would be, but practical issues such as the means of construction and flood risk can be dealt with by way of suitable conditions, and I have added such conditions accordingly.

  5. Section 06

    Conditions

    I have attached a condition relating to plans because it is necessary that the development shall be carried out in accordance with the approved plans for the avoidance of doubt and in the interests of proper planning. I have attached further conditions relating to: • Submission and approval of a [name], in the interests of protecting public safety and neighbour living conditions. • The lightwell and the future landscaping of the front garden area, in the interests of protecting the character and appearance of the CA. • Flood prevention measures and use of the basement, in the interests of minimising flood risk and protecting future occupiers of the dwelling.

    Since there is no possibility of vehicles entering or leaving the site, I do not consider a condition relating to wheel washing necessary.

  6. Section 07

    Schedule of Conditions

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: PO1, PO3, PO3c, PO4, PO6, PO7, PO8, PO9, all Rev 1.

    No development shall take place, including any works of demolition, until a [name] has been submitted to, and approved in writing by the local planning authority. The Statement shall provide for: loading and unloading of plant and materials; storage of plant and materials used in constructing the development; the erection and maintenance of security hoarding including decorative displays where appropriate; measures to control the emission of dust and dirt during construction; a scheme for recycling/disposing of waste resulting from demolition and construction works; delivery, demolition and construction working hours. The approved [name] shall be adhered to throughout the construction period for the development.

    The front lightwell hereby approved shall be covered with a walk-on metal grille positioned to be level with the front courtyard's ground surface level and be permanently retained as such.

    No development shall commence until there shall have been submitted to and approved in writing by the local planning authority a scheme of landscaping for the front garden area. All planting comprised in the approved details of landscaping shall be carried out in the first planting season following the occupation of the dwelling or the completion of the development, whichever is the sooner; and any shrubs which, within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.

    All flooding prevention measures detailed in the submitted ‘amended’ Flood Risk Assessment (Ref: 00430-35-P3-Amended-35-FR-FRA-151223) shall be implemented prior to the completion of development and be permanently retained and maintained as such.

    The single-storey basement extension hereby approved shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling known as [site address] , and shall not include primary residential uses, including bedrooms and kitchens.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 239No official casework-database value to compare
    Extracted decision date · page 1
    9 May 2024Matches the official casework database
    Extracted site visit dates
    15 April 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3335665
Application reference
00430/35/p3
Lead case reference
Not recorded
Planning authority
London Borough of Hounslow
Planning authority code
E09000018

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
19 December 2023
Valid date
19 December 2023
Start date
26 February 2024
Planning authority decision date
2 November 2023
Appeal decision date
9 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
50772
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21