Appeal 3336803
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a rear ground floor infill extension with lantern roof light.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural matter
The appellant has submitted an additional drawing1 at the appeal stage, which shows a lantern roof light in the proposed rear elevation. The original plan2 omits this detail. As the extra drawing corrects a discrepancy, with no change sought to the proposal, I am satisfied that no injustice would be caused if I were to consider it. Accordingly, I shall deal with the appeal on the basis of the plans provided at both the application and appeal stages.
The reasons for refusal refer to the Council’s Supplementary Planning Document 2: [name] (2018). I have assumed this reference is in error because the extracts before me are from a document entitled [name] and Alterations SPD2 (SPD2).
Section 04
Main issues
The main issues are the effect of the proposed development firstly, on the character and appearance of the host building and the local area; and secondly, on the living conditions of the occupiers of [address] with particular regard to sense of enclosure.
Section 05
Reasons
The proposal is primarily to erect a ground floor extension at the back of the appeal property, which is a semi-detached house of traditional style within a predominantly residential area. The new addition would replace an existing canopy structure, which provides a partly enclosed courtyard, and a single 1 Drawing number 0006 [name] 2 Drawing number 0006 Rev 00 storey rear projection that has brick walls and a flat roof. The site is not within a conservation area nor is No 66 a listed building.
The proposed extension would not extend beyond the rear of the existing buildings to be replaced and a good-sized garden would remain with the new built form in place. The external materials to be used would also match those of the existing dwelling, which is a matter that could be covered by a condition.
Nevertheless, the proposal would be a sizeable addition. It would result in a ground floor rear extension that stretches across the entire width of the host building. According to the Council, it would also project outwards from the main rear wall by about 4.8-metres. That the proposal would have a flat roof with overhanging fascias, and a line of full-length glazed panels would visually accentuate its considerable width and bulk. From the back garden of No 66, which slopes downwards from the main house, the completed extension would appear as an overly large ‘box-like’ addition. The main outcome would be significant harm to the appearance of the appeal dwelling because its rear elevation would be visually dominated by the proposal. As a result, the intrinsic character of the host building would be spoilt.
The new rear extension would not be visible from the road given its position at the back of the host building. It would, however, be evident from the back garden of the attached property, which is [address], from which it would draw the eye as an uncharacteristically large and unwelcome addition to the local area.
I agree that the existing canopy structure and extension establish a significant built form beyond the main rear wall of No 66 and adjacent to No 68. Taken together, these existing buildings cover a similar footprint to the appeal scheme. However, the solid form of construction of the new extension and its unbroken rear wall would noticeably contrast with the more ‘lightweight’ appearance of the canopy structure to be replaced, with its Perspex like upper side wall and roof, and its partly open frontage to the garden. Consequently, the completed extension would appear far more substantial than the existing buildings to be replaced.
SPD2 states that the maximum depth of single storey rear extensions to attached houses, including semi-detached properties, is normally 3-metres from the original wall. It also advises that the height of a flat roof extension on the site’s boundary should not exceed 3-metres. Based on the information provided by the Council, the proposal would comfortably exceed both thresholds. SPD2 also notes that rear extensions should be designed to respect the character and size of the house. For the reasons given, the proposal would not adhere to these design principles.
On the first main issue, I conclude that the proposed development would cause significant harm to the character and appearance of the host building and the local area. Accordingly, it conflicts with Policy DMP1 of the Brent Local Plan 2019-2041 (LP) and the advice within SPD2. These policies and guidance aim to ensure that development is of a scale, layout and siting that provides high levels of amenity and that complements the locality.
Section 06
Living conditions
The new flank wall would be up to and along part of the site’s shared boundary with No 68. As a result, the patio and part of the garden of this attached property would be partly enclosed by the new extension. In views from these vantage points, and the rear windows of No 68, the proposal would be evident particularly as it would occupy an elevated position relative to the site due to a difference in ground levels.
There is already a brick wall in place along the common boundary between Nos 66 and 68. Whilst the new flank wall would be taller and more substantial than its existing counterpart, I attach some weight to the presence of a permanent and solid feature alongside the rear of No 68. From what I saw, the main direction of outlook from the rear windows and patio of No 68 would continue to be across the back garden of this adjacent property. While the proposal would be close to the back of this neighbouring property, on balance, neither its height nor depth would be so great as to unduly heighten a sense of enclosure for the occupiers of No 68.
Therefore, I conclude on the second main issue that the proposed development would not cause significant harm to the living conditions of the occupiers of No
As such, it does not conflict with LP Policy DMP1 and SPD2 insofar as they aim to safeguard residential amenity. My finding on this issue does not outweigh the harm that I have identified in relation to the effect of the proposal on the character and appearance of the host building and the local area.
Section 07
Other matters
The proposal includes several additional elements including new ground floor side windows, a lowered ground floor to the existing dining room, a new wood burner chimney, removal of the existing chimneystack and alterations to the rear garden terrace. From my inspection of the plans, these parts of the development are not severable from the ground floor rear extension, which is objectionable. Therefore, I have not considered further the opportunity to issue a split decision, in which planning permission might be granted for certain elements of the appeal scheme.
An interested party raises additional concerns including the effect of the proposal on light, privacy, and the potential for structural damage, noise, and general disturbance during the construction phase. These are important matters and I have considered all the submitted evidence. However, given my findings on the first main issue, these considerations have not been critical to my decision.
Section 08
Conclusion
The proposed development would conflict with the development plan. There are no material considerations, including those of the Framework, which indicate that the decision should be taken otherwise than in accordance with the development plan. For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 287No official casework-database value to compare
- Extracted site visit dates
- 16 April 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3336803
- Application reference
- 23/1661
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Brent
- Planning authority code
- E09000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 January 2024
- Valid date
- 12 January 2024
- Start date
- 23 February 2024
- Planning authority decision date
- 8 November 2023
- Appeal decision date
- 25 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 50095
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21