Skip to main content
Official casework recordDismissedCurrent release

Appeal 3336865

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

afront dormer and front porch, elevational alterations.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed dormer on the character and appearance of the host dwelling and the surrounding area.

  3. Section 04

    Reasons

    [address] is a residential street with a mix of property styles and types including bungalows, detached and semi-detached houses. There is no presiding style although some properties share similar design features with their neighbours. Dormer windows of varying size and design are common features on the street and surrounding roads.

    The appeal property is a modest bungalow with an existing flat roof dormer to the front roof slope. The properties either side are of a different style, one has a large flat roof dormer on the front elevation and the other has a large dormer on the side roof slope.

    The proposed dormer window would be larger than the one it replaces having a double gabled frontage and spanning a wider portion of the roof. There are no other examples of double gabled dormers in the immediate surrounding areas. Dormers tend to either have flat roofs or they are smaller dormers with pitched hipped or gable roofs.

    The front of the property is clearly visible from the road. Although the property may be smaller than its neighbours the proposed extension would appear overly large in relation to the property itself. It would appear top heavy on the dwelling and its design is not sympathetic to the property or the wider area. Overall, it would appear as an incongruous addition to the property.

    Whilst other examples in the area have been presented for my consideration by the appellant, none are of a similar scale or design or on a directly comparable style of property. The dormer is therefore considered to be out of character and harmful to the appearance of the property and the area.

    The front porch proposed is of a suitable design and scale for the property. Whilst there would be a slightly awkward junction with the top of the porch and the lower part of the dormer this would have limited visual impact.

    The appellant references a [name], however, I have not been provided with any relevant design guide for this area and therefore cannot take this into consideration.

    The proposed dormer window is not considered to be of a sympathetic high quality design and it does not integrate, respect or complement the character of the area and would therefore be contrary to Policy E1 of the Test Valley Borough Local Plan. The National Planning Policy Framework requires the creation of well designed and beautiful places and this is not achieved by this proposal.

  4. Section 05

    Other Matters

    Increased energy efficiency is provided as a reason for the gable design of the proposed dormer with reference to “[name]” and the Council’s “[name]”. These documents have not been provided and are not planning policy. However, even if it could be demonstrated that there would be enhancements to the thermal efficiency of the dormer window they would not outweigh the design harms identified above.

  5. Section 06

    Conclusion

    The proposal conflicts with the development plan taken as a whole, and the material considerations do not indicate that the appeal should be decided other than in accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4712No official casework-database value to compare
    Extracted decision date · page 1
    14 August 2024Matches the official casework database
    Extracted site visit dates
    17 July 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3336865
Application reference
23/02109/FULLS
Lead case reference
Not recorded
Planning authority
Test Valley Borough Council
Planning authority code
E07000093

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 January 2024
Valid date
14 January 2024
Start date
11 March 2024
Planning authority decision date
15 November 2023
Appeal decision date
14 August 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
55598
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21