Skip to main content
Official casework recordAllowedCurrent release

Appeal 3336872

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of x10 PV panels to rear roof elevation.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the installation of x10 PV panels to rear roof elevation at [site address] , Coventry [postcode] in accordance with the terms of the application, Ref: PL/2023/0001835/HHA, dated 31 August 2023, subject to the following

  2. Section 03

    conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans referenced Location Plan (dated 31/08/23) and Proposed Plan of Installation, and in accordance with the specifications contained within the document titled “Installation of PV solar panels to rear elevation” (dated August 2023).

  3. Section 04

    Procedural Matters

    In my formal decision and banner above, I have used the description of development from the decision notice instead of the planning application form. This describes the proposed development more concisely, albeit I have removed wording which is not an act of development.

    Since the decision was made by the Council, a revised version of the National Planning Policy Framework (the Framework) was published (19 December 2023). This does not materially change the planning policy context in respect of

  4. Section 05

    the main issue.

    The Council has stated in the decision notice and in some parts of its officer’s delegated report that the Coventry City Council Local Plan is dated 2016, yet the evidence provided, including the front cover of the local plan, shows it was adopted in December 2017. I have had regard to the adopted Coventry City Council Local Plan (2017) (LP) in reaching my decision. Appeal Decision: APP/U4610/D/24/3336872

  5. Section 06

    Main Issue

    The main issue is the effect of the development on the character and appearance of the host property, as a non-designated heritage asset, and whether the character or appearance of the Earlsdon Conservation Area (ECA) would be preserved or enhanced.

  6. Section 07

    Reasons

    The Earlsdon Conservation Area Appraisal (the ECCA) outlines the special interest of the ECA. The ECCA confirms that the appeal site is located within the [address] locality where, overall, there is a high level of surviving original detailing on buildings. Insofar as is relevant to this appeal, I find the significance of the ECA is found on the historic plan form and evolution of the city, along with the overall variety and architectural quality of the buildings that the ECA possesses.

    The appeal dwelling is a two-storey semi-detached dwelling. The semi-detached pairing are constructed from a mixed palette of facing materials and red tiled roof. The dwellings include characterful projecting gables to the front side and rear, with a number of large chimney stacks. The varying gables results in a property with multiple roof slopes. The dwellings retain much of their original character and are a good example of an arts and crafts design. The dwellings are of heritage value, and I would consider them together to be a non-designated heritage asset. Overall, the dwellings contribute positively towards the character and appearance of the ECA.

    The dwelling fronts onto, and is accessed from, [address]. To the rear, the dwelling backs onto [address], between which is a reasonably deep garden. [address], the dwelling is well screened by mature landscaping. Surrounding properties are varied in their design, appearance, and age. Numerous properties in the wider area have solar panels installed on their rear or side roof slopes. Those on the rear roofs of dwellings on [address] are particularly apparent from [address].

    The proposed solar panels would be sited on the rear roof slope of the dwelling, positioned between the projecting rear gable and the centre line of the properties. The mature landscaping on [address] would ensure that views of the solar panels would be largely screened. When approaching the site from the bend on [address], the flank elevation and rear gable of the semi-detached pairing is prominent in view and creates a strong focal point to this short vista. However, the orientation the properties, means that the rear roof of the appeal dwelling is largely obscured from this view. Closer to the property, the rear roof slope does come into view, albeit only momentarily and from a small vantage point. These views are glimpsed through or over vegetation. This, together with the distance of the roofslope from the highway and positioning behind the prominent gables, would ensure that the solar panels would appear relatively inconspicuous.

    The solar panels, due to their colour and reflectivity would contrast with the red tile roof. However, the dwelling has multiple roof slopes and the coverage of proposed solar panels would be limited to a single area of roof. The extent of roof coverage would not, on the whole, be significant. The solar panels would Appeal Decision: APP/U4610/D/24/3336872 be set back behind the projecting gable which would remain the dominant feature from the rear. Furthermore, as I have identified above, the degree of visibility from public areas would be limited. Together, these would ensure that the overall character and appearance of the building, and its semi-detached pairing, would not be adversely diminished by the solar panels.

    I understand that existing solar panels in the area have been installed prior to the designation of the ECA, although I do not have sufficient evidence to conclude on this point. The ECCA and the Earlsdon Conservation Area Management Plan provide limited commentary on the installation of solar panels in the ECA, but do seek to limit visual clutter. Existing solar panels in the area, particularly those on [address], are prominent from [address] due to limited screening and their more exposed roof design. These are contextually different to the appeal proposals. Furthermore, together with the appeal proposals, they would not be viewed cumulatively to result in an unacceptable level of visual clutter in the ECA. In any event, I have considered the proposals on its individual merits and in accordance with the statutory requirement1.

    For the above reasons, the development would not have a negative effect on the character and appearance of the host property, as a non-designated heritage asset, and would preserve the character and appearance of the ECA. Therefore, the proposed development accords with Policies DE1 and HE2 of the LP, and guidance contained within the Framework. Together, amongst other things, these require development to respect their surroundings, and for heritage assets to be protected and conserved.

  7. Section 08

    Conditions

    I have imposed standard conditions relating to the commencement of development, and to require compliance with the submitted plans and documents for certainty, and in the interest of the character and appearance of the ECA.

  8. Section 09

    Conclusion

    For the above reasons the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5832No official casework-database value to compare
    Extracted decision date · page 1
    10 April 2024Matches the official casework database
    Extracted site visit dates
    13 March 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3336872
Application reference
PL/2023/0001835/HHA
Lead case reference
Not recorded
Planning authority
Coventry City Council
Planning authority code
E08000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
14 January 2024
Valid date
1 February 2024
Start date
15 February 2024
Planning authority decision date
26 October 2023
Appeal decision date
10 April 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
49335
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21