Appeal 3336909
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a covered timber porch, removal of existing render to expose existing brickwork and install mock Tudor cladding with render in between.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
In addition to this proposal, I was also the Inspector for an appeal relating to other proposed developments (a carport, outbuilding and wall, railings, and gate) at the same property which is the subject of a separate decision - APP/P3610/D/24/3336907.
Section 04
Main Issue
The main issue is the effect of the development on the character and appearance of the host property and the surrounding area, including the Ewell Village Conservation Area.
Section 05
Reasons
The appeal property is located at the end of The Headway, a private road of predominately 1930s detached properties. No.1 has been extended to the side and has an extensive width, nonetheless, space remains to each side of the property. Positioned at the end of the road the property is also visible from
Section 06
[address] and the car park to [name] opposite
The Headway forms part of the Ewell Village Conservation Area (EVCA) covering an extensive area which includes the commercial village centre and residential areas with notable natural features including springs, woodland and green space together with buildings of merit. The spacious, detached properties and landscape qualities of The Headway are referenced in the [name] and [name] document, and the architectural character of the properties and the pattern of development contribute to the character and appearance of the area.
Section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires special regard to the desirability of preserving or enhancing the character or appearance of that area.
I agree with the Council that the appeal property makes a neutral contribution to the EVCA and has undergone various alterations. From what I observed, timber is a material which features on many of the properties along The Headway, particularly in the first-floor gable projections. The existing cream render and extensive tile hanging of No.1 has a somewhat different appearance to the other properties along The Headway, and the use of mock Tudor and exposing brickwork would reinstate some of the property’s original character.
However, in contrast to the other properties, which primarily exhibit timber and render to the upper floor, the proposed design would consume the whole property. The extensive use of mock Tudor cladding would be out of keeping and the continuation over the large side element, which was not part of the original property, would add to the visual discordance.
Porches are not a prolific feature of properties along The Headway and where they do occur, they are generally part of the original form created from a projecting first floor or they are of a modest canopy style. The appeal property has an existing single-storey flat-roofed element across the frontage of the original property and compared to other properties it has a limited setback from the road. Whilst the proposed porch would be of a canopy form with a tiled roof and timber supports it is a wide structure and part of the roof would project in front of the property’s two-storey gable feature. As such, the porch would appear as a disproportionate and incongruous feature to the detriment of the character of the host property.
I acknowledge that the appellant is investing in the property, that the proposed features are found along The Headway and that planning permission has been granted for a porch to nearby properties. Be that as it may, each proposal is to be considered on its own merits and it is the scale and extent of the proposed elements which would be harmful. Consequently, I find that the proposed development would fail to harmonise with the prevailing character and ensure that the appearance of the EVCA is preserved.
The impact of the development would be localised and the effect on the Conservation Area as a whole would be less than substantial. Nonetheless, in accordance with the National Planning Policy Framework (the Framework) great weight is to be given to the conservation of heritage assets irrespective of the level of harm and there are no identified public benefits which would outweigh this harm.
Thus, the proposal would therefore conflict with policies CS1 and CS5 of the [name] 2007 and policies DM8, DM9 and DM10 of the Development Management Policies Document 2015. Together these seek to protect the built and natural environment, to conserve and enhance heritage assets and reinforce local distinctiveness. Additionally, they promote good design and require extensions and alterations to respect the prevailing development, the scale, form and massing, typical details and to maintain key features.
Section 07
Conclusion
For the reasons set out and having regard to all other matters raised the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 362No official casework-database value to compare
- Extracted decision date · page 1
- 10 April 2024Matches the official casework database
- Extracted site visit dates
- 22 March 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3336909
- Application reference
- 23/01272/FLH
- Lead case reference
- Not recorded
- Planning authority
- Epsom and Ewell Borough Council
- Planning authority code
- E07000208
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 15 January 2024
- Valid date
- 15 January 2024
- Start date
- 9 February 2024
- Planning authority decision date
- 2 January 2024
- Appeal decision date
- 10 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 49337
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21