Appeal 3336914
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The effect of the proposal on the character and appearance of the main building and the surrounding area.
Section 04
Reasons
[name] is a large two-storey semi-detached dwelling set back from the highway of [address]. The dwelling sits within a linear pattern of dwellings along the south side of the highway, there are neighbours to the east and the attached neighbour to the west, with open agricultural land to the north and south. There is an existing garage set forward of the dwelling, in line with the building line of the neighbouring garage to the east. The garages are of the same scale, height and design, being clearly subservient to the main dwellings. This contributes positively to the character and appearance of the linear street scene as the ridge heights of the main dwellings remain the regular dominant design feature along the line of development.
The proposed annexe would be sited on the footprint of the existing garage following its demolition, and thus closer to the highway than the main dwelling. The ridge height would exceed that of the existing adjacent extension to the west of the proposal and is the minimum height that would be required to provide usable living accommodation within the eaves of the proposed annexe.
Due to its position forward of the existing dwelling, its greater ridge height and its juxtaposition with the neighbouring smaller garage, I find that it would be unduly prominent in the street-scene and would not appear ancillary to the main dwelling.
The distance between the main dwelling and the annexe, together with its position forward of the dwelling’s building line would create the impression of a separate dwelling even though I note that the curtilage is not proposed to be sub-divided in this proposal.
Due to its position and design I find that the proposal would not easily integrate into the main building as a single dwelling house in the future, as it would not have a sufficiently close spatial relationship with the main dwelling. I reach this conclusion notwithstanding the Appellant’s points about other potential future ancillary uses such as a gym or office space, and the existence of a shared vehicular access and rear garden area. In this case the driveway frontage and garden area are extensive, such that the sharing of the space does not correlate to a close spatial relationship with the main dwelling.
For these reasons I find the proposal conflicts with Policy LP02 of the Babergh and Mid Suffolk Local Plan (2023) in that it does not appear ancillary and subordinate to the main dwelling and the design does not lend itself to easily integrate into the main building as a single dwellinghouse when the need no longer exists. The proposal also conflicts with the National Planning Policy Framework that seeks high quality design that makes a positive contribution to its context.
Whilst the proposal would provide the benefit of additional living accommodation, I find that this does not outweigh the harm caused by the proposal to the character and appearance of the street scene and the conflict with the development plan outlined above.
Section 05
Other Matters
Although it is regrettable that the pre application advice did not reflect the Council's formal decision, it is not bound to follow that pre-application advice. I have considered the proposal on its own merits and reached my decision based on the submitted plans and my own judgement.
Section 06
Conclusion
For the above reasons and having regard to all representations made, I conclude that the proposal conflicts with the development plan taken as a whole and that there are no material considerations including the Framework that outweigh the harm caused by the proposal. The appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 7187No official casework-database value to compare
- Extracted site visit dates
- 25 March 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3336914
- Application reference
- DC/23/04905
- Lead case reference
- Not recorded
- Planning authority
- Babergh District Council
- Planning authority code
- E07000200
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 15 January 2024
- Valid date
- 28 January 2024
- Start date
- 14 February 2024
- Planning authority decision date
- 18 December 2023
- Appeal decision date
- 24 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 50035
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21