Appeal 3337914
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
“Erection of two units selling food and drink (within [name](a) and Class E(b)), with associated access arrangements, landscaping and car parking. (amended site section plan, site plan, acoustic fence and landscaping plan received on 9.8.22)”.
Section 02
Decision
The appeal is allowed and the planning permission Ref 22/00531/FUL, for Erection of two units selling food and drink (within [name](a) and Class E(b)), with associated access arrangements, landscaping and car parking. (amended site section plan, site plan, acoustic fence and landscaping plan received on 9.8.22), at [site address] , granted on 1 August 2023 by Sunderland City Council, is varied by deleting condition No 11.
Section 03
Applications for Costs
An application for costs has been made by [name] of [name] against Sunderland City Council and is the subject of a separate decision.
Section 04
Preliminary Matters
An update to the National Planning Policy Framework (the Framework) was published following the granting of planning permission. I have determined the appeal against the revised Framework, and I am satisfied this contains no material changes relevant to the substance of the appeal.
[name] 2 of planning permission Ref 22/00531/FUL (the ‘permission’) requires the development to be carried out in full accordance with a list of approved plans, including: “Proposed drainage layout received on 28.6.22 - Drainage maintenance plan received on 28.6.22”. However, condition No 2 does not reference any drawing numbers.
The evidence before me refers to various versions of these drawings. The Council has confirmed that the correct drawing numbers which were before them at the time of determination were: [name] and Levels – P20-148-3E-ZZ-XX-DR-C-1000-P5 Date – May 2020 Maintenance Plan – P20-148-3E-ZZ-XX-DR-C-1101-P5 Date – June 2020
Both parties have had the opportunity to clarify and comment on the drawings to which condition No 2 refers. Based on this feedback, I have determined the appeal against the plans listed above.
Section 05
Main Issue
The main issue is whether the disputed condition is reasonable and necessary in terms of ensuring the development is acceptable with regard to sewerage, flooding and surface water drainage.
Section 06
Reasons
The Council’s contention is that condition No 11 was imposed on the permission because the drainage details listed under condition No 2 did not comply with relevant development plan policy in relation to water treatment. Additionally, the Council consider insufficient reasoning was provided as to why a surface water drainage connection could not be made to a culverted watercourse to the south of the site.
The lead local flood authority (LLFA) response refers to conflict with Policy WWE3 of the Sunderland City Council Core Strategy and Development Plan 2015-2033 – January 2020 (the CSDP). This requires development to consider the effect on flood risk, on-site and off-site, commensurate with its scale and impact. The policy also sets 10 specific criteria that development must meet.
In relation to water treatment, criterion 9 states that development must demonstrate control of the quality of surface water run-off during construction and for the lifetime of the development. For all developments the management of water should be an intrinsic part of the overall development.
The plans secured under condition No 2 illustrate features including a detention basin, filter trenches and permeable paving to improve water quality as part of the surface water drainage strategy. They also provide a detailed maintenance schedule for the various elements of the drainage scheme, distinguishing between the construction and operational phases of the development.
Neither Policy WWE3 nor its supporting text provides additional specific criteria for water quality requirements beyond those already mentioned. Given the policy requirements, I find the detail provided in the plans secured through condition No 2 to be acceptable for ensuring compliance with the policy.
In terms of the surface water drainage connection, criterion 5 of Policy WWE3 states that development must separate, minimise and control surface water run-off by discharging in the following order: i. to an infiltration or soak away system; ii. to a watercourse (open or closed); iii. to a surface water sewer.
The supporting text to Policy WWE3 states that the policy seeks to minimise the risk that future development locations could be flooded from sewers or add to an existing risk by ensuring that surface water run-off entering the sewer system is kept to an absolute minimum. Other benefits of such an approach will include a much reduced risk to water quality.
There appears no dispute between the parties that an infiltration or soak away system would not be feasible. However, there appears to be a fundamental disagreement regarding the extent to which the appellant has explored options to discharge via a watercourse; specifically the culverted watercourse to the south of the site.
Policy WWE3 does not prohibit surface water discharging to a sewer but considers it less favourable than discharging to a watercourse. To my mind, although it is not explicitly stated, the policy implies that proposals must justify why it is not feasible to follow the preferred hierarchy.
I have reviewed the correspondence between the main parties prior to the granting of the permission. It is clear from this dialogue and the committee report that both parties made efforts to resolve the disagreement, but without success. Based on this evidence, I am satisfied that the proposal to discharge to a surface water sewer has been adequately justified, and the details approved under condition No 2 would accord with Policy WWE3 in respect of the surface water drainage connection.
Moreover, the Planning Practice Guidance (PPG) advises that conditions that unnecessarily affect an applicant’s ability to bring a development into use, allow a development to be occupied or otherwise impact on the proper implementation of the planning permission should not be used. A condition requiring the re-submission and approval of details that have already been submitted as part of the planning application is unlikely to pass the test of necessity.
Taking account all of the above, the details required under condition No 11 have already been secured under condition No 2. Moreover, these details are sufficient to ensure, in respect of the main issue, that the proposal would comply with Policy WWE3 of the CSDP, the aims of which have previously been set out. Therefore, I find condition No 11 to be unnecessary and unreasonable when assessed against the tests outlined in paragraph 56 of the Framework and the PPG.
Section 07
Conclusion
For the reasons given above, the appeal should be allowed, and the permission varied to delete condition No 11, as set out in my formal decision.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4240No official casework-database value to compare
- Extracted decision date · page 1
- 3 July 2024Matches the official casework database
- Extracted site visit dates
- 19 April 2024 (page 1)
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 4240No official casework-database value to compare
- Extracted decision date · page 1
- 3 July 2024Matches the official casework database
- Extracted site visit dates
- 19 April 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3337914
- Application reference
- 22/00531/FUL
- Lead case reference
- Not recorded
- Planning authority
- Sunderland City Council
- Planning authority code
- E08000024
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor retail and services
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.56 hectares
- Floor space
- 347 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 31 January 2024
- Valid date
- 1 February 2024
- Start date
- 5 February 2024
- Planning authority decision date
- 1 August 2023
- Appeal decision date
- 3 July 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53397
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21