Skip to main content
Official casework recordDismissedCurrent release

Appeal 3338155

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

proposed single storey side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The application plan 2252-04A shows two parking spaces at the front of the property. The council’s officer report refers to it as a “new parking area”. It does not form part of the description of the development and I noted it was in situ when I visited the site. I am therefore proceeding on the basis that is part of the existing situation on the site and does not form part of the appeal proposals.

  3. Section 04

    [name]

    The main issues are: • whether appropriate arrangements can be made for the disposal of surface water from the site; and • whether the proposed development makes suitable provision for the parking of vehicles including its effect on the local highway network.

  4. Section 05

    Disposal of surface water

    The flood risk assessment (FRA) submitted with the planning application proposes to discharge surface water from the development at a controlled rate to a combined sewer to be approved by the relevant water company, [name]. However, it commented on the application that discharging to a public combined sewerage network was not an acceptable method of disposal and alternative surface water run off options should have been considered in accordance with a defined “[name]”.

    This approach is supported by policy PNP(i) of the Paignton Neighbourhood Plan 2012-2030 (PNP). This encourages [name] systems which keep surface water out of the combined sewer network at source. Paragraph 6.51 of the PNP refers to a 2014 Sewer Capacity Assessment which concluded that the outlying sewer network will not necessarily have sufficient spare capacity to take additional development.

    Torbay Local Plan 2012 to 2030 (TLP) policy ER2 also seeks to reduce water being discharged into foul sewers through the use of sustainable urban drainage measures. Policy ER1 supports the use of sustainable drainage measures in the context of managing wider flood risk.

    No evidence has been submitted by the appellant to substantiate the proposed surface water discharge method contained in the FRA. Nor has any evidence been submitted to justify why a more sustainable drainage solution cannot be provided in accordance with the development plan objectives. Whilst the proposal is for a relatively small extension, it is apparent from the relevant development plan policies that the use of a combined sewer for surface water run off should only be considered once other options have been explored.

    I have given consideration as to whether an appropriately worded condition to secure further details could be imposed if I were minded to allow the appeal. However, from the submitted evidence it is not clear whether a satisfactory drainage solution could be designed. On that basis, I have concluded that such a condition would not be reasonable.

    In the absence of evidence to justify the approach proposed in the FRA, I therefore conclude that it has not been satisfactorily demonstrated that appropriate arrangements can be made for the disposal of surface water from the site. Hence, the development conflicts with policies ER2 and ER1 of the TLP and policy PNP(i) of the PNP which seek to promote the use of drainage solutions which reduce surface water being discharged into the sewerage network.

  5. Section 06

    Effect on local highway network

    Elm Park serves a mix of predominantly terraced and semi-detached houses together with a small convenience store. It is on a hill which rises up from [address]. The other end of the road loops around again to meet [address].

    Off street parking around the appeal site is limited with only a few houses having spaces. There are a small number of designated disabled parking spaces along the road. I noted during my visit that there were cars parked on street, many of which had done so with two wheels on the footway thereby reducing the width of the pavement available for pedestrians. The houses either side of the site both have off street parking spaces albeit of different layouts.

    The site has a short, sloping drive up to the highway. It is currently restricted in width by a ramp leading to a door into the bungalow but is sufficient to provide parking for a single vehicle. In addition, there is a separate parking space parallel to the road with a dropped kerb running the length of the site’s frontage. The property therefore currently has [address] parking spaces, one at right angles to the other.

    The proposed kitchen side extension would infill the space between an existing utility room and the front of the bungalow, thereby shortening the length of the driveway and the space available for parking on it. TLP policy TA3 requires that extensions to houses must not result in the net loss of parking provision to below the standards set out in [name] to the policy. For dwelling houses, the requirement is 2 car parking spaces per dwelling unit. For domestic extensions, the requirement is 1 space per 2 bedrooms. The proposed extension is for a study and bathroom. No additional bedrooms are being created so the parking standard for domestic extensions does not apply. The parking standard in the TLP therefore requires two spaces.

    The council’s [name] (HSA) provides guidance on the design of parking spaces. Whilst not part of the development plan, the HSA guidance is a material consideration. It is however generic advice issued by the council and not site specific. The HSA advises that parking spaces should be at least 5.5m long where the parking area is between the back of the pavement and the front of the building. In this case, the appellant has submitted photographs showing a van parked on the drive to demonstrate that the retained space would be sufficient to park a vehicle in front of the extension and clear of the highway. In the absence of evidence to the contrary, this demonstrates that adequate parking could be provided in front of the extension.

    Together with the second, more recently created parking space, the level of parking on the site would therefore meet the policy TA3 parking standard for a dwelling. The council has suggested that the new space should not be considered as a parking area as it does not comply with the relevant design advice. However, the space already exists and is in use. I therefore consider it reasonable to take it into account. By providing off-street parking, the requirement for on street parking to serve the site could reduce, along with any associated restriction of the carriageway or footway.

    Accordingly, I conclude that the proposed development would make suitable provision for the parking of vehicles and would not have a harmful effect on the local highway network. Hence, the proposal would not conflict with TLP policies TA2 and TA3 regarding the requirements for parking.

  6. Section 07

    Conclusion

    Despite my findings in relation to the effect of the proposal on the local highway network, the proposed drainage arrangements would conflict with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. Therefore, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4802No official casework-database value to compare
    Extracted decision date · page 1
    30 May 2024Matches the official casework database
    Extracted site visit dates
    14 May 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3338155
Application reference
P/2023/1009
Lead case reference
Not recorded
Planning authority
Torbay Council
Planning authority code
E06000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 February 2024
Valid date
20 February 2024
Start date
8 April 2024
Planning authority decision date
18 January 2024
Appeal decision date
30 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
51779
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21