Appeal 3338448
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the erection of a two-storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main issues
The main issues in this case are: • Whether the proposal would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework December 2023 (NPPF) and any relevant development plan policies. • The effect of the proposal on the openness of the Green Belt. • If inappropriate, would the harm by reason of inappropriateness, and any other harm, be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.
Section 04
Reasons
No 48 is a detached house situated on the south side of [address]. It is part of a row of detached houses of varying design along this part of the road and, in common with neighbouring properties, is set well back from the road. It would appear that the properties in the vicinity of No [address] that back onto an area of open land between the houses and a large commercial horticultural premises to the south. To the north and further to the east of [address] is open countryside. The proposed development would involve the construction of a two-storey extension across part of the rear elevation of the house, and the insertion of new windows and doors. Whether inappropriate?
The NPPF states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. A local planning authority should regard the construction of new buildings as inappropriate in the Green Belt with certain exceptions, including the extension of a building provided that it does not result in disproportionate additions over and above the size of the original building. When considering any planning application, local planning authorities should ensure that substantial weight is given to any harm to the Green Belt.
Policy GBR1 of the Council’s District Plan 2018 states that planning applications within the Green Belt will be considered in line with the provisions of the National Planning Policy Framework (NPPF). In the explanation relating to planning applications in the Green Belt, it reiterates that inappropriate development in the Green Belt should not be approved except in ‘very special circumstances’, and that ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations. In this respect the development plan policy is consistent with the policy set out in the NPPF.
The appellant has referred to other examples of development granted permission in the Green Belt close to the appeal site, where large increases in size have been involved. However, it would appear that these examples are not of similar circumstances to that of the current proposal, in terms of either type of development, position in relation to the host building, or degree of change with regard to the scale of the actual development proposed, and I have, in any case, considered this case on its own merits.
In this case, the proposed development is an extension and as such, is to be considered against potential exception (c) under paragraph 154 of the NPPF. From the information before me, it would appear that the original dwelling has been extended a number of times in the past, and that the existing dwelling plus the proposed extension would have a floorspace some 97% larger than the original. Whilst, in itself, the proposed extension would not be a large addition, when considered cumulatively with previous additions I find that it would represent a disproportionate addition over and above the size of the original building. It would, therefore, be inappropriate development in the Green Belt.
Section 05
Openness
The proposed extension would partly infill a space at the rear of the house, but would then extend beyond the rear building line by a small amount into the rear garden. It would, therefore, have some impact on the openness of the Green Belt, though the degree of harm would be minimal.
Section 06
Other considerations
The appellant has referred to a Certificate of Lawful Development (CLD) that was issued in 2013 relating to a two-storey rear extension at No 48 which appears to be of a slightly smaller scale and a different design to that of the current proposal. From the information before me, it is unclear as to whether changes to the General Permitted Development Order since 2013 could potentially invalidate the CLD. It is questionable, therefore, whether it could constitute a realistic ‘fall-back’ position.
Even if the CLD were to be considered a fall-back position, the time that has elapsed since the CLD was issued, during which time the development has not been implemented, leads me to consider that there is only a small degree of probability that it would be carried out.
Finally, I note that the CLD scheme is smaller than that of the current proposal. In addition, it would cause less harm than the current scheme in that would retain the characteristic pitched roof design of the main body of the dwelling, whereas the current scheme would introduce a flat-roofed element that would be somewhat incongruous in the context of the design of the rest of the house.
In conclusion on the CLD issue, from the evidence before me, I find that there is some doubt as to the validity of the CLD. Even if the CLD scheme were to be considered a fall-back position, the time delay in implementing it indicates only a limited probability of it being built. In any case, the current proposed scheme would be larger and of a somewhat uncharacteristic design. For all of these reasons I give the existence of the CLD scheme only limited weight
The appellant notes that planning permission was granted by the Council in 2014 for an almost identical development to that of the current proposal. The 2014 permission has, however, now lapsed and, although granted under a similar policy from an earlier development plan, the assessment of that proposal by the Council took place at a time when the CLD would have remained valid. Moreover, it would appear that little detailed consideration was given by the Council at that time to specific quantitative data relating to the scale of the proposal. Given the actual figures available to me, I have found that the 97% increase in floorspace would represent a disproportionate addition over and above the size of the original building. The existence of the much earlier permission does not alter my conclusion on this matter and, once again, I afford it limited weight.
Section 07
The Planning Balance
I find that the proposal would represent inappropriate development in the Green Belt. In the light of my considerations given in paragraphs 9-12 above, I afford the existence of the CLD scheme only limited weight. Similarly, for reasons given in paragraph 13, the existence of a previous planning permission for a similar proposal in 2014, should be afforded only limited weight. On balance, therefore, I conclude that there are no other considerations which, separately or cumulatively, clearly outweigh the harm to the Green Belt by way both of inappropriateness and impact on openness, which must be afforded substantial weight.
Section 08
Conclusion
I find that the proposed extension would be inappropriate development in the Green Belt, and the very special circumstances necessary to justify the development would not exist. On this basis, the proposal would conflict with Policy GBR1 of the LP and with national policy in the NPPF. Consequently, I dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 239No official casework-database value to compare
- Extracted decision date · page 1
- 27 August 2024Matches the official casework database
- Extracted site visit dates
- 16 July 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3338448
- Application reference
- 3/23/2074/HH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 430 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 8 February 2024
- Valid date
- 3 March 2024
- Start date
- 6 March 2024
- Planning authority decision date
- 18 December 2023
- Appeal decision date
- 27 August 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 56178
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21