Appeal 3338735

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two storey side extension following demolition of existing Garage and Conservatory. Two storey rear extension plus loft extension created by raising roof height.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the development on: - i) the character and appearance of the host property and the surrounding area; and ii) the living conditions of the occupiers of the neighbouring property (No.10).

  3. Section 04

    Reasons

    The detached house is part of a row of four properties of the same design on the north-eastern side of [address]. The form and spacing between them have a notable rhythm, and due to the curve in the road and the separation the roofscape and massing of these properties are visible in views along [address].

    The proposal incorporates several elements which would significantly alter the form and appearance of the property. The proposed rear addition would have a higher ridge line, and combined with the side extension and dormer, would create an irregular and contrived roof form with several flat roof elements. Despite being set back, the higher roof would be evident, disrupting the form and homogeneity of the properties, and contrasting with the simplicity of the existing pitched gable roof.

    I have been directed to two detached properties of the same design further along the road (Nos. 34 and 36) which have been extended to the side over the garage. I also observed other extensions and dormer windows in the locality. While individual aspects may be appropriate, and the materials are to match, in combination, the scale and design of the proposed development would result in a discordant and incongruous form. This would both, consume the existing property, and be out of keeping with the street scene of inter-war properties.

    Overall, I find that the development would be to the detriment of the character and appearance of the host property and the surrounding area. The proposal, therefore, conflicts with policy QP3 of the Borough Local Plan (BLP) and policy DES.01 of the Windsor Neighbourhood Plan (WNP) which support high-quality design with particular regard to respecting and enhancing the local environment including rhythm, height, scale, bulk, massing, and the contour and profiles of the existing roofscape. In that regard, there would also be a conflict with the design aspects of the National Planning Policy Framework, Section 12 promoting well-designed places. Relationship with No.10

    The neighbouring property has a first-floor window in its flank elevation facing towards the appeal property. The Council advise that this serves a bedroom and is the only window to that room. The arrangement is the result of a rear extension undertaken to No.10 in the 1980s. While the window is at odds with the obscurely glazed or landing windows to the flank elevations of the other properties, it is an established window serving a habitable room. The proposed side extension would bring the flank substantially closer. This proximity would undoubtedly restrict the light and outlook to that window to the detriment of the occupiers' living conditions.

    Therefore, there would be a conflict with BLP policy QP3 criterion (m), which seeks to ensure that development has no unacceptable effect on the amenities enjoyed by the occupants of adjoining properties including through light and sunlight.

  4. Section 05

    Other Matters

    The appellant is critical of the Council’s approach and delays in the planning process. A costs application has not been made and, in my view, the reasons for refusal are complete and specific to the development with reference to policy and the Framework. It is also apparent that the appellant sought to address the objections and have amended the scheme, nonetheless, for the reasons set out, I share the Council’s concerns. The appellant’s desire to enhance their property is not unreasonable, although the alterations are extensive, and there are no other matters which indicate that the proposal should be determined other than in accordance with the development plan.

  5. Section 06

    Conclusion

    For the reasons set out, and having regard to all other matters raised the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 362No official casework-database value to compare
    Extracted site visit dates
    19 April 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3338735
Application reference
23/00645
Lead case reference
Not recorded
Planning authority
Royal Borough of Windsor and Maidenhead
Planning authority code
E06000040

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 February 2024
Valid date
14 February 2024
Start date
20 March 2024
Planning authority decision date
1 December 2023
Appeal decision date
7 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
50593
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21