Appeal 3338923
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
first floor side extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a first floor side extension at [site address] in accordance with the terms of the application, [name]/HSE/23/00507, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: TQRQM23216022440396 – Site Location Plan, KON.JUL.23A Page 1 of 2, KON.JUL.23A Page 2 of 2.
The materials to be used in the construction of the external surfaces of the extension shall match those used in the existing building.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 05
Reasons
The appeal property is a two storey terraced house. It has a small forward projection and a single storey side projection. The roof of the side projection is connected to the roof of the garage at the neighbouring property creating an undercroft structure that provides access to a parking area. This results in a visible gap between the houses. The undercroft design feature is repeated at other terraces in the street scene. The surrounding area is residential in character.
The proposed first floor side extension would be built over the existing side projection with a similar width and depth. As a result of this, it would have a relatively modest scale that would relate well to the proportions of the house. Although it would sit forward of the first floor level, the front building line of the terrace is already disrupted by the front projections at some of the properties.
The extension would be set slightly back from the forward projection and would be set down from the roof ridge. It would therefore read as a subservient addition to the house, and it would not be visually dominant or unduly prominent. Overall, the design of the extension would accord with the appearance of the house.
By virtue of the size of the extension, sufficient space would remain between the house and the connected property with a degree of visual separation. The extension would also not extend over the middle part of the undercroft feature. This would ensure that the undercroft continues to read as a key architectural feature in the street scene. [name] accept that first floor extensions are not common, because of its design, the extension would integrate well within the street scene and would not result in such a change that detrimentally disrupts the rhythm of form or consistency of development on the road or in the wider area.
For these reasons, I conclude that the proposal would not cause harm to the character and appearance of the area. Accordingly, it complies with Policy PL1 of the Harlow Local Development Plan 2020, the Harlow Design Guide Supplementary Planning Document 2011 and the [name] Planning Document 2021. These policies and guidance, amongst other things, require extensions to be coherent, visually subservient and take account of local character and context.
Section 06
Conditions
I have imposed the statutory implementation condition, along with a condition listing the approved plans to provide certainty. A materials condition is also necessary to ensure the external materials of the proposal match the existing materials to protect the character and appearance of the area.
Section 07
Conclusion
For the reasons given above, the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5346No official casework-database value to compare
- Extracted decision date · page 1
- 15 August 2024Matches the official casework database
- Extracted site visit dates
- 7 August 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3338923
- Application reference
- HW/HSE/23/00507
- Lead case reference
- Not recorded
- Planning authority
- Harlow District Council
- Planning authority code
- E07000073
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 February 2024
- Valid date
- 16 February 2024
- Start date
- 23 April 2024
- Planning authority decision date
- 6 February 2024
- Appeal decision date
- 15 August 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 55679
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21