Skip to main content
Official casework recordDismissedCurrent release

Appeal 3338937

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single-storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are: • The effect on the living conditions of the neighbouring occupants of 29 and [address] with particular regard to outlook; • The effect on the character and appearance of the host building and surrounding area.

  3. Section 04

    Living conditions

    The appeal site is a two-storey, mid-terrace property in an established residential area. It currently has a stepped-in flat roof extension at the rear and an outbuilding at the bottom of the garden. The rear boundary treatments with Nos 29 & 33 are approximately 1.6m in height.

    The proposal is for a 9.5m long, full width, rear extension to replace the existing extension. The extension would be mostly flat roofed with a height of around 2.85m, although this would slope down to 2m in height along the boundary with No 33 and would contain glazing panels on that side. From the information before me, the Council has previously granted planning permission for a replacement 6m long extension of similar design to the proposal.

    The Council’s Housing Design Supplementary Planning Document 2019 (SPD) states that a flat roof, single-storey, rear extension on a terraced house should be no more than 3.5m in length and 3m in height, although greater depths may be acceptable where this would be consistent with adjoining properties.

    No 29 currently has a 3.8m rear extension. Clearly, the length of the proposed extension would exceed the SPD guidance in relation to this neighbour’s extension. Nevertheless, as the existing extension at the appeal site already projects a similar length and height along this boundary, the effect on the rear outlook of No 29 would be largely unchanged. Consequently, there are specific site circumstances which would warrant a departure from the SPD in relation to this neighbour.

    However, No 33 has not been previously extended and contains large patio doors close to the boundary. The manner in which the existing extension at the appeal site steps away from the boundary on that side means that it has only a limited effect on the rear outlook of No 33. Despite the attempts to reduce the height and solidity of the proposed extension on this side, it would still rise notably above the boundary fence. The combination of its height, considerable length, and proximity to the boundary, would undoubtedly have an excessively dominant impact on the rear outlook from No 33, even when judged against the baseline of the previously approved 6m long extension.

    The appellant has highlighted another appeal decision at [address] (APP/W5780/D/15/3136737). However, the extension in that case had a much shorter length and it appears that both adjoining neighbours also had rear extensions at the time. These notable differences mean that the decision has little bearing on my assessment of the scheme before me.

    In conclusion, I find that the proposed extension would unacceptably harm the living conditions of the occupiers of [address] in terms of outlook. As such, there is conflict with Policies LP26 and LP30 of the Redbridge Local Plan 2018 (the RLP), which both seek to ensure that development does not adversely affect the outlook of neighbouring occupiers. There is also conflict with the underlying aims of the SPD in this regard.

  4. Section 05

    Character and appearance

    As set out above, the size of the proposed extension far exceeds the SPD guidance. However, its depth would be similar to the existing extension, and although wider, would retain a reasonable amount of garden space at the rear. Moreover, the number and variety of rear extensions and outbuildings that already exist results in a varied character at the rear. In this context, and given the limited private vantage points from which it would be seen, the proposed extension would have minimal impact on the character and appearance of the host building and its established residential surroundings.

    I therefore conclude that the proposed extension would not unacceptably harm the character or appearance of the host building and its surroundings. As such, there is no significant conflict with the general design aims of Policies LP26 and LP30 of the RLP, and the SPD.

  5. Section 06

    Other Matters

    Although not advanced in any detail in the appellant’s grounds of appeal, it is apparent from the plans that the proposal would benefit a disabled person. I have therefore had regard to the Public Sector Equality Duty (PSED) contained in s149 of the Equalities Act 2010. The duty includes having regard to the need to eliminate discrimination, harassment, and advance equality of opportunity between those sharing relevant protected characteristics and those who do not.

    However, it has not been demonstrated that the scale of the proposal is specific to the disabled person’s needs, or that their needs cannot be met in a less harmful way, including by the extant planning permission. I am also mindful that both personal circumstances and occupants can change, but the effect of the development would be permanent. Thus, on the basis of the evidence before me, the PSED considerations do not outweigh the significant harm that I have identified, and following careful consideration of these particular matters I am satisfied that the impact of dismissing this appeal is proportionate and justified.

  6. Section 07

    Conclusion

    The proposal would be harmful to the living conditions of the occupants of [address] in terms of outlook, and is therefore in conflict with the development plan as a whole. Material considerations do not indicate that the decision should be taken other than in accordance with the development plan. Therefore, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 597No official casework-database value to compare
    Extracted decision date · page 1
    9 August 2024Matches the official casework database
    Extracted site visit dates
    6 August 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3338937
Application reference
3338/23
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 February 2024
Valid date
16 February 2024
Start date
22 March 2024
Planning authority decision date
5 January 2024
Appeal decision date
9 August 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
55389
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21