Appeal 3339868
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a dropped kerb for vehicular access.
Section 02
Decision
The appeal is allowed and planning permission is granted for a dropped kerb for vehicular access at [site address] in accordance with the terms of the application, [name]/2024/0000137/HHA, dated 19 January 2024, and the plans submitted with it, subject to the following condition:
The development hereby permitted shall begin not later than three years from the date of this decision.
Section 03
Main Issue
There is one main issue which is the effect of the proposed dropped kerb and consequent off-street parking on highway safety, including pedestrian safety, in the vicinity of the appeal site.
Section 04
Reasons
The appeal site comprises a large end of terrace dwelling set on a moderately busy street characterised by similar dwellings. It is some distance from any junction. The road connects the north of Coventry to the city centre and is a bus route. The speed limit is 30 mph. Most traffic appeared to be travelling within this limit. The street is residential with dwellings set on either side of a wide dual carriageway. There is a small grass verge separating the carriageways. The appeal dwelling has a generous front garden some 5m wide and 10m deep which would readily accommodate at least two vehicles. This has been paved and the front boundary wall has been removed.
[address] has on-street parking on both sides of the road, but space is limited because the majority of frontages in the section of road on which the appeal dwelling is located have dropped kerbs and off-street parking, a number of which appear to be recent. The appeal dwelling is set between dwellings that do not have dropped kerbs and frontage parking but, with the exception of No 53, most others to the north, towards the junction with [address], do and to the south, with the exception of a cluster of dwellings close to the appeal site, most properties also have dropped kerbs and off-street parking. This form of development is therefore common in the vicinity and characteristic of the street.
Owing to the generous size of the frontage at No 51 and the fact that traffic approaches the site from only one direction, manoeuvring a vehicle on or off the frontage would be relatively straightforward. Moreover, there appeared to be no significant impediments to visibility up and down the footway and limited pedestrian movement. There did not appear to be shops or other amenities in the immediate area likely to attract significant pedestrian traffic.
Although vehicles would have to reverse either onto or off the drive, from my observation most vehicles appear to reverse off the highway which would have a similar effect on other road traffic as a vehicle reverse parking. However, both manoeuvres would be common in the vicinity, owing to the number of verge crossings, and would not therefore surprise passing motorists, pedestrians or cyclists. The open street scene would also give pedestrians a clear view of traffic crossing the footway.
The Highway Authority suggests that parked cars would reduce visibility for emerging drivers but with limited on-street parking and traffic approaching from only one direction this would not result in a greater hazard than is commonly found in streets where there is a mix of driveways and street parking. The Highway Authority also suggests that reducing street parking would result in increased vehicles speeds but since there is a 30 mph speed limit and limited street parking it is unclear why this would be so. The same speed limit is common in urban areas and on streets with mixed street and driveway parking. I do not therefore consider that this amounts to a reason to resist the development.
The Council suggests that the creation of an access, resulting in the loss of an on-street parking space, would be detrimental. However, since the loss of one street parking space would enable the creation of two off-street spaces, in a residential street where off street parking is clearly sought after, I am not persuaded that this would be materially detrimental to either highway safety or the living conditions of occupiers.
Overall, I find that the proposed dropped kerb to facilitate off street parking at the appeal site would, owing to the specific circumstances identified, including the prevalence of similar development nearby, have a limited effect on highway, including pedestrian, safety. I therefore consider that the proposed development would be acceptable. 10.It is concluded on the main issue that the proposed dropped kerb and consequent off-street parking would have no materially harmful effect on highway, including pedestrian, safety in the vicinity of the appeal site. In consequence, it would comply with Policies AC1 and AC2 of the Coventry Local Plan, 2016 which expect new development not to cause unacceptable highway safety problems, and with the National Planning Policy Framework which expects new site access to be safe and suitable but advises that development 2 should only be refused on highway grounds if there would be an unacceptable impact on highway safety. 11.The Council suggests one condition which is the statutory commencement condition. I agree that this, but no other condition, is necessary to ensure that the development occurs within a reasonable timescale. 12.For the reasons set out above and having regard to all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2972No official casework-database value to compare
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3339868
- Application reference
- PL/2024/0000137/HHA
- Lead case reference
- Not recorded
- Planning authority
- Coventry City Council
- Planning authority code
- E08000026
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 1 March 2024
- Valid date
- 20 March 2024
- Start date
- 17 April 2024
- Planning authority decision date
- 28 February 2024
- Appeal decision date
- 22 May 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 51506
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21