Skip to main content
Official casework recordDismissedCurrent release

Appeal 3340072

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

new entrance to existing residential dwelling.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    This appeal relates to a development that is identified in the evidence as being retrospective. I did note that there was a porch structure at the appeal site during my site visit. However, works to reduce the depth of the porch following the Council’s decision are referred to in the appellant’s statement along with a discussion about a change to the materials proposed. Nevertheless, for the avoidance of doubt, the Council determined the application based on the submitted drawings and consequently so shall I.

  3. Section 04

    Main Issue

    The main issue is the effect of the porch extension on the character and appearance of the host dwelling, and the surrounding area.

  4. Section 05

    Reasons

    The host dwelling is a modern two storey mid terrace property formed of buff brick walls. The terrace is simple in design but provides a uniformity that is coherent visually. In the surrounding area there are a mix of dwelling types including terraced properties of different designs, semi-detached and detached dwellings. The established palette of external wall materials in the vicinity of the appeal site includes buff brick, red brick and render.

    Existing porches within the surrounding area include mainly flat, curved or pitched roof canopy style porches which are open at the sides and front. A flat roofed porch canopy is located above each neighbouring property within the host terrace. I noted enclosed porch structures in the surrounding area at 26/26A and [address] and next door to the host terrace at 10 and [address]. These existing porches have limited separation to the front boundary but were all constructed in materials to match the host buildings to which they are attached. The consistency of design features and external materials contribute positively to the character and appearance of the area.

    An enclosed porch formed of dark grey timber look horizontal cladding has been constructed at the appeal site. Whilst the development is single storey and set back from the edge of the road, its presence disrupts the existing pattern of built form and appears at odds with the uniformity of the host terrace. The dark grey timber look cladding does not reflect the materials used on the host dwelling or other dwellings within the surrounding area, resulting in a dominant feature which is out of keeping with the established built form. Whilst not located on a main through route, it is clearly visible to those travelling along [address].

    It is not clear where the examples provided in the appellant’s statement are located and how they relate to the context of the appeal site. Nevertheless, in the significant majority of those cases, the enclosed porches are constructed of materials which match that of the host building that they are attached to, or they appear to reflect the established palette of materials around them. In the case of the nearby example identified in photographs 54, 55, 56 and 57 where a grey porch is constructed in front of part of the existing garage door, I did not witness this in the surrounding area when I carried out my site visit. I am also not aware of the planning history of this particular site. I therefore attribute limited weight to this consideration.

    Even if the porch was to be reduced in depth to 975mm, the materials on site, or as identified on the drawings, mean that it would appear as an incongruous feature that is harmful to the character and appearance of the host dwelling and the surrounding area. I note that revised materials are mentioned, however, the details of these are not before me. The development is therefore contrary to Policy 22 of the Hull Local Plan 2016 to 2032 [name] 2017 which seeks, amongst other things, that house extensions should be well related to the existing building in terms of size, siting, materials and detailing and to respect the context of the surrounding area.

    The development is contrary to SPD1: Designing a [name] (SPD1) which provides advice in relation to Policy 22 and states, amongst other things, that proposals for front extensions should use materials matching the existing building as closely as possible. Whilst SPD1 is not part of the development plan, it is a material consideration.

  5. Section 06

    [name]

    It is not disputed that the development does not benefit from permitted development rights due to its proximity to the road. The appellant states that the porch has been designed to ensure that part of the front garden area is retained, whilst providing the internal space required to meet their needs. However, such personal circumstances carry very little weight.

  6. Section 07

    Conclusion

    The proposal conflicts with the development plan as a whole and the material considerations do not indicate that the appeal should be decided other than in accordance with it. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4047No official casework-database value to compare
    Extracted decision date · page 1
    18 June 2024Matches the official casework database
    Extracted site visit dates
    4 June 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3340072
Application reference
23/03378/FULL
Lead case reference
Not recorded
Planning authority
Kingston-Upon-Hull City Council
Planning authority code
E06000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
3 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 March 2024
Valid date
28 March 2024
Start date
24 April 2024
Planning authority decision date
4 January 2024
Appeal decision date
18 June 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
52696
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21