Appeal 3340199
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Under Article 3 (1) and Schedule 2 Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO), planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions.
Section 04
[name]
The main issue is whether the proposal would be permitted development.
Section 05
Reasons
There is no dispute that the development would have a width greater than half the width of the original dwellinghouse. The main issue of contention is whether the proposal would extend beyond a wall forming a side elevation of the original dwellinghouse contrary to the limitation within A.1 (j)(iii) of the GPDO.
The appeal property has been previously extended at ground floor across the full width of the property. I have no substantive evidence before me to indicate the appearance of the rear elevation of the property prior to the extension being constructed. However, existing drawings do indicate the original rear building line was staggered at ground floor. The appellant has identified that the approximate depth of this feature is between 0.25m to 0.3m. Although it is recessed and covered by the first floor, the plans show a clear projection, and stepped rear original building line. I do not disagree that this is an architectural feature, and not a structural part of the dwelling, but this does not preclude it from also being side wall.
The appellant has supplied numerous appeal decisions of varying ages on this matter. In the [address] appeal1 the Inspector considered ‘the nature, location and projection of a wall of similar depth did not constitute a wall forming a side elevation of the original dwelling. Like this appeal, this was not in situ although the submitted plans are not comprehensive. However, the Inspector was able to visit that property and referred to specific features, which are not evident from the information provided to me. I am therefore of the view that they had evidence or the benefit of first hand observation, which is not before me, to inform their view as a matter of fact and degree.
The wall in the [address] appeal2 was also a very short section of wall that served only to link the different parts of the ground floor rear elevation and the Inspector also found as a matter of fact and degree that it formed part of the rear wall of the original dwelling. With the [address] appeal3 it is clear that the rear façade was in alignment at ground floor level across the rear of the property. The contested feature was set at height above this. In the Endellion appeal4 the wall in question was described as a shallow, two storey projection which was evidently intended to provide some articulation to the rear elevation.
With the dismissed [name] appeal5 the appellant has suggested that the whole geometry of the external envelope of the building and total scale and visibility of the of the upper storey needs to be considered, thus drawing a variance with this decision. However, that Inspector determined that appeal based on the lawfulness of the proposed development as required. The planning merits and matters such as design, scale and visibility are not referred to within the limitations of the GPDO. [name] was to take this argument, all the above appeal properties appeared to be substantial dwellings. In the context of the scale of those dwellings, the side-walls referred to would be very minor features.
As such there are numerous appeals which support and conflict with the appellant’s case, and I have carefully considered these. Some of them pre-date the current Permitted Development Rights for Householders - Technical Guidance (2019). However, as is explained in this document a wall forming a side elevation of a house is any wall which cannot be identified as a front wall or rear wall. This point is illustrated by a diagram in the Guidance showing a house with stepped rear projections, the side walls of which are labelled as walls forming a side elevation.
Although no longer in situ, and the projection was quite small, I am of the view that there was a short piece of wall which was not rear-facing. It is not a front wall and it is side-facing; so it has to be treated as a side elevation. The proposed extension would project beyond this side elevation and would have a width greater than half the width of the original house. All the facts in those appeals are very different from the situation in this appeal where I have found that the 0.3m is part of the ground floor element of a wall forming a side elevation of the dwellinghouse and ultimately, I have insufficient evidence of this wall to conclude otherwise. 1 Appeal ref: APP/B1930/X/10/2133372 2 Appeal Ref: APP/L5810/X/18/2180519 3 Appeal Ref: APP/L5810/X/18/3198886 4 Appeal Ref: APP/Y3615/X/16/3142651 5 Appeal Ref: APP/M3645/X/16/3154333
I do not see good reason to interpret the GPDO other than in accordance with the Guidance. In my opinion there is no base-line for side-wall depth and the GPDO and guidance as drafted does not provide for flexibility, it simply refers to a wall forming a side elevation.
Therefore, the proposed extension would extend beyond a side elevation of original house and would be more than half the width of the original dwellinghouse. The appeal scheme would, therefore, not comply with the limitations contained within paragraph A.1 (j)(iii) of the GPDO.
[name].3 (a) of the GPDO requires the materials used in any exterior are of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse. The host dwelling has a rendered ground floor appearance, and tile hanging on the upper floor. I find that the proposed render would be of a similar appearance to that used in the construction of the exterior of the existing dwellinghouse on its current extension. The proposal would therefore satisfy the relevant provision A.1(g) of the GPDO.
There is also a dispute over the depth of the extension. I consider that this falls within the remit of A.4 (3)(b) of the GPDO that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the limitations and conditions. Although the application form states that the depth of the development would be 6m, the proposed plans clearly show a depth of 5700mm from the original wall aligned with the first floor. However, as the recessed original rear elevation is set in around 0.3m the extension should not exceed 6m from this point. I therefore have no substantive evidence that the proposal exceeds the limitations and would comply with the provisions of A.4 (3)(b) of the GPDO.
The proposal would comply with the provisions of A.3 (a) and A.4 (3)(b) of the GPDO. However, I conclude that the extension would not accord with limitations of A.4 (J)(iii) of Part 1, Class A, Schedule 2 of the GPDO. Therefore, the development does not constitute permitted development.
Section 06
Conclusion
For the reasons given above, I conclude that the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted decision date · page 1
- 11 December 2024Matches the official casework database
- Extracted site visit dates
- 18 November 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3340199
- Application reference
- 23/03133/PAEXT
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Kingston Upon Thames
- Planning authority code
- E09000021
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 March 2024
- Valid date
- 18 March 2024
- Start date
- 7 May 2024
- Planning authority decision date
- 18 December 2023
- Appeal decision date
- 11 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61612
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21