Skip to main content
Official casework recordDismissedCurrent release

Appeal 3340307

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

double hip to gable extensions with two side box dormers to the rear gable.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The Planning Inspectorate Procedural Guide: Planning Appeals – England 2024 states that the appeal process should not be used to evolve a scheme, and that it is important that what is considered by the Inspector at appeal is essentially the same scheme that was considered by the Council and by interested parties at the application stage.

    The appellant states that, if necessary, a condition could be imposed requiring that the proposed side dormers be stepped up by 0.5 metre. However, having regard to the above Guide, I have dealt with the scheme before me as depicted on the proposed drawings, and as was considered by the Council and by interested parties at application stage; and this alteration could not be appropriately addressed by means of a condition as suggested.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the host property and the area.

  4. Section 05

    Reasons

    Section 2.5 of the [name] and Alterations Supplementary Planning Document No 2 (2018) (‘SPD’) sets out that roof alterations should complement the host property and the original street character, but that the conversion of a hipped roof to a gable is generally acceptable.

    Whilst they would be located towards the rear of the property, given that the proposed dormers would extend along the side plane of two sloping roofs, I agree with their description as ‘side box dormers’ on the application form. The SPD states that side dormers will only be allowed it they are well designed and do not compromise the building’s or the street’s character; and that they should be set down from the ridge by at least 0.3 metre, and up from the eaves by at least 0.5 metre measured along the roof plane.

    The Council does not object to the proposed hip to gable extensions. Given that the properties on [address] have a mix of hips and gables, and that the host itself has a front projecting gable, I agree that that part of the scheme would not detract from the streetscene or from the character of the original dwelling.

    The proposed side dormers would attach to the rear roofs of the proposed gables and would extend along the sides of the host property to just short of its upper floor rear face. Although they would be set down from the host’s ridge, and 0.4 metre up from its eaves, each would cover most of the sloping roof in which it would be set.

    As a result, they would have a substantial scale, and whilst they would not be visible in the streetscene, from the gardens and rear elevations of nearby properties they would dominate the original dwelling, and would give the resultant building a very top-heavy, rectilinear bulk. As they would not complement the character of the host, they would fail to accord with the general advice in the SPD.

    Many of the dormers in the area referred to by the appellant, including those in Figures 3, 4 and 6 of his statement, appear to be smaller in scale compared to those proposed here. [name] observed a large rectilinear dormer to the side of [address], and next to this site to the rear of [address], they are not typical of the area or this particular row. Indeed, I observed that the other properties in this row overwhelmingly have simple, sloping roofs above ground floor level to the rear. Consequently, notwithstanding those isolated examples, and a large dormer to the rear of [address], this scheme would be at odds with the prevailing character of this area and this row.

    The scheme would therefore harm the character and appearance of the host property and the area. It would thus fail to accord with that part of Policy DMP1 of the Brent Local Plan 2019 - 2041 (2022) which states that development will be acceptable provided that its scale, detailing and design complements the locality. It would also conflict with the general approach in the SPD. Having regard to all other matters raised, the appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 450No official casework-database value to compare
    Extracted decision date · page 1
    20 May 2024Matches the official casework database
    Extracted site visit dates
    13 May 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3340307
Application reference
23/3601
Lead case reference
Not recorded
Planning authority
London Borough of Brent
Planning authority code
E09000005

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
32 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
8 March 2024
Valid date
12 March 2024
Start date
27 March 2024
Planning authority decision date
6 February 2024
Appeal decision date
20 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
51365
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21