Appeal 3340307
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
double hip to gable extensions with two side box dormers to the rear gable.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
The Planning Inspectorate Procedural Guide: Planning Appeals – England 2024 states that the appeal process should not be used to evolve a scheme, and that it is important that what is considered by the Inspector at appeal is essentially the same scheme that was considered by the Council and by interested parties at the application stage.
The appellant states that, if necessary, a condition could be imposed requiring that the proposed side dormers be stepped up by 0.5 metre. However, having regard to the above Guide, I have dealt with the scheme before me as depicted on the proposed drawings, and as was considered by the Council and by interested parties at application stage; and this alteration could not be appropriately addressed by means of a condition as suggested.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host property and the area.
Section 05
Reasons
Section 2.5 of the [name] and Alterations Supplementary Planning Document No 2 (2018) (‘SPD’) sets out that roof alterations should complement the host property and the original street character, but that the conversion of a hipped roof to a gable is generally acceptable.
Whilst they would be located towards the rear of the property, given that the proposed dormers would extend along the side plane of two sloping roofs, I agree with their description as ‘side box dormers’ on the application form. The SPD states that side dormers will only be allowed it they are well designed and do not compromise the building’s or the street’s character; and that they should be set down from the ridge by at least 0.3 metre, and up from the eaves by at least 0.5 metre measured along the roof plane.
The Council does not object to the proposed hip to gable extensions. Given that the properties on [address] have a mix of hips and gables, and that the host itself has a front projecting gable, I agree that that part of the scheme would not detract from the streetscene or from the character of the original dwelling.
The proposed side dormers would attach to the rear roofs of the proposed gables and would extend along the sides of the host property to just short of its upper floor rear face. Although they would be set down from the host’s ridge, and 0.4 metre up from its eaves, each would cover most of the sloping roof in which it would be set.
As a result, they would have a substantial scale, and whilst they would not be visible in the streetscene, from the gardens and rear elevations of nearby properties they would dominate the original dwelling, and would give the resultant building a very top-heavy, rectilinear bulk. As they would not complement the character of the host, they would fail to accord with the general advice in the SPD.
Many of the dormers in the area referred to by the appellant, including those in Figures 3, 4 and 6 of his statement, appear to be smaller in scale compared to those proposed here. [name] observed a large rectilinear dormer to the side of [address], and next to this site to the rear of [address], they are not typical of the area or this particular row. Indeed, I observed that the other properties in this row overwhelmingly have simple, sloping roofs above ground floor level to the rear. Consequently, notwithstanding those isolated examples, and a large dormer to the rear of [address], this scheme would be at odds with the prevailing character of this area and this row.
The scheme would therefore harm the character and appearance of the host property and the area. It would thus fail to accord with that part of Policy DMP1 of the Brent Local Plan 2019 - 2041 (2022) which states that development will be acceptable provided that its scale, detailing and design complements the locality. It would also conflict with the general approach in the SPD. Having regard to all other matters raised, the appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 450No official casework-database value to compare
- Extracted decision date · page 1
- 20 May 2024Matches the official casework database
- Extracted site visit dates
- 13 May 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3340307
- Application reference
- 23/3601
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Brent
- Planning authority code
- E09000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 32 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 8 March 2024
- Valid date
- 12 March 2024
- Start date
- 27 March 2024
- Planning authority decision date
- 6 February 2024
- Appeal decision date
- 20 May 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 51365
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21