Appeal 3340641
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
replacement of the existing conservatory with a smaller extension; construction of a timber-framed carport to front, and open-sided timber- framed structure and replacement balcony at rear; installation of external wall insulation and cladding to all external walls; alterations to windows, doors, dormers and rooflights.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are: -whether or not the proposal is inappropriate development in the Green Belt; -the effect on the openness of the Green Belt; and -if the development is inappropriate, its effect on openness and whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.
Section 04
Whether inappropriate development
The appeal site comprises a dwelling which is situated in the Green Belt. The National Planning Policy Framework (the Framework) identifies that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. It goes on to state that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances.
The proposal includes the extension of an existing dwelling. The Framework advises at Paragraph 154 that the construction of new buildings should be regarded as inappropriate in the Green Belt subject to exceptions, one of which is the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Policy CS.10 of the [name] 2011 to 2031 (2016) (LP) also states that planning permission will be granted for a small-scale extension or alteration of a building in the Green Belt.
In the context of the Framework the glossary advises that ‘original building’ refers to a building as it stood on 1 July 1948 or as constructed if built after that date. The term ‘disproportionate’ is not defined in the Framework and ‘small scale’ is not defined in the LP. The supporting text to LP policy CS.10 advises that the cumulative effect of the proposed scheme together with previous development on the site will be taken into account and the extension should not result in a building disproportionately larger than the original building.
The appeal property comprises a detached bungalow which has undergone extensions and is set back from the road within a spacious plot. It is proposed to erect a rear extension following the demolition of the conservatory, and to erect a carport to the front elevation, an open-sided timber-framed structure and replacement balcony to the rear. Further alterations are also proposed in the form of external wall insulation and cladding and alterations to windows, doors, dormer windows and rooflights.
The main parties disagree on the volume increase created by the proposal. The Council calculates that the proposal would represent a cumulative increase in volume of 50.3%. The appellant calculates that the proposal would represent a cumulative increase in volume of 35.28%. Even if I were to accept the appellant’s calculations, this would still represent in a significant volume increase. Therefore, whilst the proposed development would be relatively modest in terms of both its footprint and volume, it would not be limited or small in scale having regard to previous extensions and would thus constitute a disproportionate addition over and above the original building.
For the reasons given the proposal would be inappropriate development in the Green Belt. The proposal would therefore conflict with LP Policy CS.10 and would not be an exception to new buildings in the Green Belt under bullet point 3 in Paragraph 154 of the Framework. In accordance with Paragraph 153 of the Framework, this is a matter to which I attach substantial weight.
Section 05
Openness
The fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. The essential characteristics of Green Belts are their openness and their permanence. Openness in terms of the Green Belt has a spatial aspect and a visual aspect.
The appeal proposal includes several components which, by virtue of their scale and siting, would have a neutral effect on the openness of the Green Belt including the replacement rear extension, open-sided timber-framed structure and the replacement balcony. Similarly, the external wall insulation and cladding to the external walls, and the alterations to windows, doors, dormers and rooflights would not significantly alter the footprint or massing of the dwelling or result in any adverse effects upon the openness of the Green Belt.
However, the proposed carport would project to the front of the dwelling. It would result in more of the Green Belt being built upon than at present, which would have a reducing effect on the openness of the Green Belt. Whilst it would be open on one side, the use of hit and miss timber cladding to the front and southeast elevations would result in an extension with a solid appearance which would add increased bulk and massing to the existing building.
By virtue of its position towards the front of the property, the increased footprint and volume of the building would also have a greater visual impact on the openness of the Green Belt when compared with the building as it originally stood or indeed the existing building. This would be particularly perceptible in views from neighbouring properties and from the road. The openness of this part of the Green Belt would thus be harmed. The Framework advises that substantial weight is given to any harm to the Green Belt.
Section 06
Other considerations
The Framework is clear that substantial weight should be given to any harm to the Green Belt. ‘Very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the development, is clearly outweighed by other considerations.
The appellant indicates that extensions which could be carried out under permitted development could result in an equivalent amount of development to the appeal proposal. I have limited information about whether there would be an intention to carry out extensions under permitted development if this appeal were dismissed. However, there would seem a greater than just theoretical possibility that this alternative would take place.
Subject to the limitations in the General Permitted Development) (England) Order (2015), works which could be carried out as permitted development could increase the floor area and volume of the building by more than the appeal proposal, resulting in more of the Green Belt being built upon than at present, and a greater spatial and visual impact upon openness.
Nonetheless, permitted development rights would not include an extension of the scale and siting of the proposed carport. The permitted development fallback would therefore omit a substantial part of the proposal, and indeed the part of the proposal that I have found to be most harmful to the openness of the Green Belt.
Furthermore, if the appeal proposal were allowed, this would not prevent further extensions from being erected under permitted development rights alongside the appeal proposal. There is no mechanism before me to prevent existing permitted development rights being exercised prior to commencing the proposed development as the removal of such rights would only take effect once any permission has been implemented. The potential for both the appeal proposal and permitted development being carried out, and the resultant effect on the openness of the Green Belt, reduces the weight to be afforded to this consideration.
The appellant goes on to suggest that development which could be carried out through a combination of permitted development and planning permission would have a similar physical form to the appeal proposal. The appellant sets out that this could be achieved by seeking planning permission for the cladding of the existing building, carrying out an extension and shading structure under permitted development and then seeking planning permission to convert the shading structure to a balcony.
I cannot be certain that the Council would grant planning permission for the works as detailed or that these works would include the carport, which is the element of the proposal that I have found to be most harmful to the openness of the Green Belt. Given this, if implemented, there is no suggestion that this hybrid fallback development would be more harmful to the openness of the Green Belt. Consequently, I afford limited weight to this in my decision.
The appellant suggests that the appeal proposal would result in improvements to energy efficiency, but I have very little evidence of the magnitude of these improvements. There is no evidence that the appeal proposal is the only mechanism by which these improvements could be achieved. Thus, I afford this benefit limited weight.
The appellant also suggests that the proposal would improve the design quality of the appeal property, in particular through the replacement of the existing white render with timber cladding. The extensions proposed in this appeal are not, however, shown to be necessary for this purpose. Thus, I afford this limited weight.
Section 07
Planning balance and Conclusion
The Framework indicates that inappropriate development is, by definition, harmful to the Green Belt should not be approved except in very special circumstances. Paragraph 153 goes on to advise that very special circumstances will not exist unless any potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations.
I attach substantial weight to the harm to the Green Belt by virtue of the fact the proposal is inappropriate development and the harm it has to the openness of the Green Belt, as I am required to do by the Framework. I find in this case that the other considerations do not clearly outweigh the harm that I have identified. Consequently, the very special circumstances necessary to justify the development do not exist.
Therefore, for the reasons given above, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5070No official casework-database value to compare
- Extracted decision date · page 1
- 27 September 2024Matches the official casework database
- Extracted site visit dates
- 23 September 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3340641
- Application reference
- 23/02790/FUL
- Lead case reference
- Not recorded
- Planning authority
- Stratford-on-Avon District Council
- Planning authority code
- E07000221
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 13 March 2024
- Valid date
- 13 March 2024
- Start date
- 14 May 2024
- Planning authority decision date
- 21 December 2023
- Appeal decision date
- 27 September 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 57650
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21