Appeal 3340936
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the planning application form as “Proposed first floor side extension with hipped roof. All materials to match the existing. The first floor will be cantilevered at the rear to eliminate the need for a column which may have caused damage to the roots of nearby planting situated along the boundary. The existing ground floor side extension brickwork will be obscured by a timber fence with existing planting trained through a trellis to provide a natural soft appearance to the overall side elevation of the property in the streetscene. (This application is a re-submission of refused application ref 3/23/1578/HH, dated 9-10-23).”
Section 02
Decision
The appeal is dismissed.
Section 03
Main issue
The main issue in this appeal is the effect on the character and appearance of the locality and streetscene.
Section 04
Reasons
The dwellings within [address] include a number at corner locations typically having both front and side elevations facing the street. Even in relation to their side elevations, these tend to be set back from the pavement either for their full two storey height or at first floor level. During my site visit I saw those properties in the vicinity specifically referred to by the Appellant and noticed that these all have at least some space between the flank of the dwelling and the pavement. Moreover, it is pointed out that these only comprise three out of ten corner properties so that the predominant character is one of an even more spacious relationship.
As a result, the corner plots provide an important degree of spaciousness and openness to the streetscene, preventing an unduly developed appearance. This includes the appeal site where a single storey side projection abuts the pavement. The property on the opposite side of the junction has its front elevation facing the flank of the host dwelling. It therefore contributes more to the openness of the streetscene at this point than the appeal site. However, despite abutting the pavement, the side addition at the host dwelling is of a fairly modest scale and is only single storey in height allowing views over it of the sky and vegetation. As a result, it still makes a meaningful contribution to the overall sense of openness at corner locations within [address].
The resultant double storey projection, abutting the pavement, would be a particularly unusual feature within [address], unduly at odds with the general pattern of development. With its eaves height at the same level as that of the host dwelling and full two storey height side wall immediately adjoining the street it would introduce significant additional bulk and mass in this position.
Consequently, it would appear as an unacceptably dominant and overbearing feature at a prominent corner location. It would not therefore reflect a suitably modest increase in height. A new boundary fence, given the lack of any noticeable space between it and the side wall, would tend to highlight the cramped nature of the development rather than significantly mitigate it. Even with a trellis and vegetation trained through, the extension would rise significantly above it anyway.
For these reasons, it is concluded that the development would harm the character and appearance of the locality and the streetscene. Policies DES4 and HOU11 of the East Herts District Plan 2018 are relevant to this appeal. There would be no conflict with Policy HOU11 (b) as the side elevation would not be adjacent to another residential curtilage. However, the policy seeks compliance with other criteria and the siting, size and mass of the extension would not be appropriate to the character, appearance and setting of the dwelling and surrounding area, contrary to Policy HOU11 (a). There would also be conflict with Policy DES4 which, among other things, seeks development of a high standard of design that reflects and promotes local distinctiveness. The proposal would therefore be contrary to the development plan.
In the National Planning Policy Framework, it is indicated that decisions should ensure that developments satisfy a number of considerations. These include that the proposed development should add to the overall quality of the area, as well as being visually attractive and sympathetic to local character, which would not be achieved in this case.
The lack of any concern by the Council over the loss of vegetation is a neutral factor that weighs neither for nor against the appeal. A number of the properties referred to by the Appellant are in other parts of Sawbridgeworth. In consequence, they are not part of the context within which the proposed development would be most readily appreciated and against which its impact should be considered. Local residents support the proposal and the Town Council have raised no objections. Nevertheless, this does not, in itself, confer acceptability on the proposal and I must consider this appeal on its own merits.
Taking account of all other matters raised and given the harm that would result the appeal fails.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 8No official casework-database value to compare
- Extracted decision date · page 1
- 27 June 2024Matches the official casework database
- Extracted site visit dates
- 11 June 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3340936
- Application reference
- 3/23/2421/HH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 March 2024
- Valid date
- 18 March 2024
- Start date
- 12 April 2024
- Planning authority decision date
- 9 February 2024
- Appeal decision date
- 27 June 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53149
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21