Appeal 3341314
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as “Proposal of single storey rear outbuilding.”
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
At the time of my site visit, a partially demolished single storey outbuilding was situated in the position of the proposed building. Based on the planning history, it would appear that the structure in situ is a version of a previous outbuilding. With this and the proposed plans in mind, the scheme does not appear to seek retrospective planning permission. I have considered it accordingly.
Section 05
[name]
The main issues are the effect of the proposed outbuilding on a) the character and appearance of the area; and b) the living conditions of the occupiers of [address] with specific regard to outlook.
Section 06
Character and Appearance
The appeal site is the rear garden of No [site address] which is a two storey dwelling attached at right angles to No 26. The rear garden is therefore side onto where [address] becomes a footpath adjacent a large open communal area of grass. The side elevation of the proposed building would be visible in the street scene, owing mainly to its height. The area is residential, where buildings are consistently two storey. There are outbuildings in rear gardens and a garage court nearby. That said there is an obvious hierarchical relationship between primary and secondary outbuildings that has established a clear and repeated structure in surrounding curtilages. The consistency of which contributes positively to the character and appearance of the area.
The land take and height of the proposed outbuilding would appear obvious in the street scene as one of authority and noticeable presence where one would normally expect, given the above context, to see something far more recessive against its host and primary building. In character terms, the building’s overall scale would buck the trend and pleasant hierarchical pattern of building relationships, competing for dominance within the plot. These matters would detrimentally affect the consistency of the locality and thus harm the character and appearance of the area.
Therefore, the proposal would conflict with Policy EN1 of the [name] and Policies Development Plan Document 2009 (DPD) and the Supplementary Planning Document on the Design of [name] and New Residential Development 2011 (SPD) which together seek to ensure that development proposals are of a high-quality design and standard.
Section 07
Living Conditions
The outbuilding would be close to three metres in height as it would address the side boundary of No [address]. What would be the rear elevation of the building would be a long, tall and continuous blank brick wall, without feature or visual interest. Owing to this, its height and length, the building would be oppressive to users of the garden of No 24 to the extent that it would present an overbearing effect that would lead to an unacceptably poor standard of outlook. The appeal scheme would therefore conflict with Policy EN1 of the DPD and the guidance in the SPD which, amongst other things, seek to ensure that living conditions of properties are protected.
Section 08
Other Matters
I am aware of the history of the appeal site and specifically a dismissed appeal for a similar building. From my findings above however, it is sufficiently clear that the changes that have been made to the scheme as it now stands have not gone sufficiently far to be acceptable. In addition, it is not for me as part of this appeal to determine the lawfulness of the building as it is proposed and specifically whether it or something similar might be acceptable under Class E of the Town and Country Planning (General Permitted Development) (England) Order 2015. In any event, I am unaware of the extent of the original garden which might shed some light on the percentage allowances for outbuildings thereunder.
[name] have alluded to above, there is a relatively dense development of garages in the immediate vicinity of the appeal site. They form part of the appeal site’s context and whilst they are not insignificant in isolation or as a collective, they are their own entity and do not feature as part of a contained planning unit in association with a host primary building. Their existence does not therefore justify the proposed development.
The garden size would be significantly reduced by the appeal scheme but, as the appellant has demonstrated, what would remain would not be unacceptable in either qualitative or quantitative terms, having regard to the guidance in the SPD. This would however be a lack of harm and not weigh in favour of the proposed development.
Section 09
Conclusion and Recommendation
For the reasons given above, the appeal scheme would not comply with the development plan, and I have been given no other compelling reason, taking into account other material considerations advanced, to deviate therefrom. I therefore recommend that the appeal should be dismissed.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1895No official casework-database value to compare
- Extracted decision date · page 1
- 26 July 2024Matches the official casework database
- Extracted site visit dates
- 9 July 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3341314
- Application reference
- 23/01467/HOU
- Lead case reference
- Not recorded
- Planning authority
- Spelthorne Borough Council
- Planning authority code
- E07000213
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 35 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 25 March 2024
- Valid date
- 25 March 2024
- Start date
- 3 May 2024
- Planning authority decision date
- 23 January 2024
- Appeal decision date
- 26 July 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 54675
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21