Appeal 3341506
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
two storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
On 30 July 2024 the Government published a consultation on proposed reforms to the National Planning Policy Framework (2023) (the Framework). The consultation and draft Framework do not constitute Government policy or guidance. However, they are capable of being material considerations in appeals. Notwithstanding this, in relation to this appeal the aims of both sets of policies are similar. No party would be prejudiced or caused any injustice by me proceeding with the appeal in light of the consultation.
Section 04
[name]
The main issues in this appeal are the effect of the proposed development on (i) the character and appearance of the area; and (ii) the living conditions of occupiers of Plot 4.
Section 05
Character and Appearance
The appeal site is within a built-up area, set back from the highway behind a site which at the time of my site visit was in the process of being developed for residential1 units, this is referred to as Plot 4.
The site is in a predominantly residential area within the [site address] Conservation Area and is within the setting of a [name] listed building. Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (LBCA Act) requires decision makers, when considering whether to grant planning permission, to have special regard to the desirability of preserving the 1 Planning Ref: CB/23/03296/FULL listed building or its setting or any feature of special architectural or historic interest which it possesses.
Paragraph 205 of the Framework states that great weight should be given to the conservation of a designated heritage asset when considering the impact of a proposal on such an asset. This is irrespective of the level of harm.
The Central Bedfordshire Design Guide (2023) (the [name]) confirms that side extensions can have a significant impact on the street scene and that gaps between detached or semi-detached houses are an important characteristic and their infilling with side extensions can impact upon the character and appearance of the area. The Design Guide states that a minimum 1m distance from the common boundary should be maintained at first floor height.
Whilst the proposed development does not retain a 1m distance from the common boundary, the orientation of the appeal property is at a right angle to the property being developed on Plot 4, a separation would be retained between the two built forms. As such the proposed development would adhere to the aims of the [name], to amongst other things avoid terracing and maintain separation between properties.
The proposed development would be hard up to the boundary this is not an unusual relationship. Notwithstanding this in relation to the existing property the proposed development would be set back slightly from the front elevation. Given the height which is not dissimilar to the main ridge height and lack of meaningful set back the extension would not appear subservient to the existing property and would detract from the pleasant façade of the appeal property.
I conclude that the proposed development would harm the character and appearance of the area.
There is conflict with Policy HQ1 and HE3 of the Central Bedfordshire Local Plan 2015-2035 (2021) which seeks amongst other things to protect heritage assets and ensure developments are of the highest possible quality and respond positively to their context.
The proposed development conflicts with the [name] which confirms that all alterations and additions to existing buildings should relate well to the character and context of their surrounding area.
There is conflict with the Framework which seeks amongst other things to ensure developments are of good design appropriate, sympathetic to their surroundings and protects heritage assets.
The Council have drawn my attention to a dismissed appeal detailing a ground floor extension for the site of the property and first floor side extension 2. I have not been provided with details of this scheme to enable a comparison to the proposal before me. Notwithstanding this each development must be considered on its individual merits, and I have reached my conclusion based on the individual merit of the appeal proposal.
Section 06
Living Conditions
The proposed development would be located adjacent the common boundary with Plot 4. The rear elevation of the property on Plot 4 would face towards 2 APP/P0240/D/12/2175666 the proposed development, with a modest area of private amenity space separating the built forms. Due to the reduced separation distance the proposed development would be dominant and overbearing to the occupiers of Plot 4.
A window is proposed to the side elevation at first floor, whilst this would be closer to the common boundary that the existing building which has two windows serving bedroom 3, this would not exacerbate the current situation in terms of overlooking and loss of privacy to the private amenity space of the future occupiers at Plot 4.
Nevertheless, I conclude that the proposed development would harm the living conditions of occupiers of Plot 4.
The proposed development would conflict with Policy HQ1 of the Local Plan, which seeks amongst other things to protect the amenity of neighbouring residents.
The proposed development conflicts with the [name] and the Framework which seeks to ensure developments have high standards of amenity for existing and future users.
Section 07
Conclusion
For the above reasons I conclude that this appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 126No official casework-database value to compare
- Extracted decision date · page 1
- 9 August 2024Matches the official casework database
- Extracted site visit dates
- 20 June 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3341506
- Application reference
- CB/24/00216/FULL
- Lead case reference
- Not recorded
- Planning authority
- Central Bedfordshire
- Planning authority code
- E06000056
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 March 2024
- Valid date
- 3 April 2024
- Start date
- 13 May 2024
- Planning authority decision date
- 7 March 2024
- Appeal decision date
- 9 August 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 55400
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21