Appeal 3341952
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension with internal alterations and associated works.
Section 02
Decision
The appeal is allowed and planning permission is granted for a single storey rear extension with internal alterations and associated works at [site address] , in accordance with the terms of the application, Ref BH2024/00033, dated 5 January 2024, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: S1, S2, S3, S4, S5, S6, S7, S8, S9, S10, S11, P1, P2, P3, P4, P5, P6, P7, P8, P9, P10 and P11 all [name].
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwelling.
The roof area of the development hereby permitted shall not be used as a balcony, roof garden or similar amenity area.
At least one bee brick shall be incorporated within the external wall of the development hereby approved and shall be retained thereafter.
Section 04
Main issues
The main issues in this appeal are: - The effect on the character and appearance of the host dwelling and locality. - The effect on the living conditions of the occupiers of the adjacent dwellings at 4 and [address], with particular regard to whether the development would appear overbearing.
Section 05
Character and appearance
The appeal concerns a semi-detached dwelling with three floors below the eaves and another in the roofspace. There is a lower ground floor rear extension with a terrace above that is enclosed by privacy screens. These features mirror the back of the attached dwelling at no. 6. The proposed extension would be built above the existing addition resulting in an overall two storey rear projection. It would also span the full width of the rear of the dwelling while extending to the same depth as the existing privacy screens and terrace. There are also no other rear extensions at this height at the other similar properties in [address].
However, despite these factors, given the flat roof form and taking into account the parapet walls to the sides, its height would be relatively modest. Its roof would be significantly below the eaves level of the main roof with the distance to the ridge being considerably greater. Moreover, the depth of the addition would be a particularly limited proportion of that of the host dwelling itself. It would also be set against the fairly substantial and imposing backdrop of the host dwelling itself. As a result, the addition would not be excessively bulky or overly dominant.
Consequently, the proposed development would appear subordinate to the host property, while being well designed in terms of matters such as its scale and proportions. Therefore, there would be no harm to the character and appearance of the host dwelling and locality.
The extension would therefore comply with Policies DM18 and DM21 of City Plan Part Two (CPP2) 2022 and Policy CP12 of the Brighton and Hove City Plan Part One (CPP1) 2016. Among other things and taken together, these intend that development makes a positive contribution to the sense of place and is of a high standard of design while taking account of the existing character of the area.
Section 06
Living conditions
Both of the adjacent dwellings at 4 and [address] have similar roof terraces at the same height as that at the host dwelling. The opaque privacy screens to the sides of these properties facing towards the appeal site already provide a degree of enclosure. The extension would abut the boundary with no. 6 but there would be a gap to the terrace and screen at no. 4, reflecting the space between the flank walls of the dwellings. While the extension would be taller than the privacy screens, the extra height would be insufficient to result in an unacceptable reduction in outlook or unduly increased sense of enclosure. Moreover, both adjacent properties would still have a particularly open outlook directly to the rear over a railway line.
Due to these circumstances matters such as the proximity, depth and height of the rear extension would not result in an oppressive sense of enclosure. As a result, the development would not appear overbearing at the neighbouring houses. There would also be no undue loss of sunlight or daylight at either property due to similar factors and the fact that the backs of the dwellings are south facing. I also note that the Council has raised no objections in these respects.
For the above reasons, it is concluded that the living conditions of the occupiers of the adjacent dwellings would not be harmed. The proposal would accord with the aim of CPP2 Policy DM20 to avoid an unacceptable loss of amenity to adjacent occupiers.
Section 07
Other matters
The Council’s Supplementary Planning Document SPD12 design guide for extensions and alterations is an important material consideration. The SPD states that two storey rear extensions should sit within and not replace the boundary wall/fence. The Council’s report refers to a planning permission recently granted for an extension at the appeal site. It is pointed out in a re-produced extract of the original report that this would conflict with the SPD as it would be built to the boundary. However, it was considered that this would not justify refusing the application. Attention is drawn to the current proposal differing in being 0.5m deeper than that previously approved.
Nevertheless, this similar extension could be built up to the boundary, as now proposed and demonstrates flexibility in the application of the SPD. I am also not persuaded on the evidence before me that there is any significant difference in size that would justify taking a different approach in this instance and consider the additional depth of 0.5m to be fairly limited. In consequence, the guidance in the SPD would not merit rejecting the appeal, especially in relation to a scheme that would comply with the development plan and not have a harmful impact.
Because of this permission and the absence of any adverse impact, precedent would not be a sound reason for rejecting the development. In any event, it would be for the Council to consider other proposals on their own merits having regard to their particular circumstances. In the Planning Practice Guidance it is indicated that the protection of purely private interests such as the impact of a development on the value of a neighbouring property could not be a material consideration. Therefore, such concerns would not be a valid reason for rejecting the appeal.
Section 08
Conditions
A condition specifying the approved plans is necessary to provide certainty. The facing materials used should match those of the existing dwelling in order to protect its appearance. A condition preventing the use of the flat roof of the extension as a balcony or similar amenity space would be sufficient and necessary to prevent an undue loss of privacy at adjacent dwellings from overlooking. In order to ensure a biodiversity gain to comply with Policy DM37 of the CPP2 and Policy CP10 of the CPP1 a requirement for a bee brick to be installed and retained is needed.
Section 09
Conclusion
For the above reasons the appeal is allowed. In reaching this decision I have considered the representations made by the occupiers of other dwellings in [address].
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 8No official casework-database value to compare
- Extracted decision date · page 1
- 3 June 2024Matches the official casework database
- Extracted site visit dates
- 9 May 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3341952
- Application reference
- BH2024/00333
- Lead case reference
- Not recorded
- Planning authority
- Brighton and Hove City Council
- Planning authority code
- E06000043
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 4 April 2024
- Valid date
- 4 April 2024
- Start date
- 19 April 2024
- Planning authority decision date
- 6 March 2024
- Appeal decision date
- 3 June 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 51914
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21