Skip to main content
Official casework recordDismissedCurrent release

Appeal 3342085

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the creation of an additional vehicular crossover to the property at the junction of [address] and [address].

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the proposed development firstly, on highway safety for users of [address] and [address]; and secondly, on the character and appearance of the local area.

  3. Section 04

    Highway safety

    The proposal is a new vehicle crossover to provide an additional access from the road to the appeal property, which is a detached house that occupies a prominent corner plot within a predominantly residential area. The new crossover would extend across part of highway frontage of the site to [address] as it curves into its junction with [address]. The existing access for vehicles from [address] to the hard surfaced area at the side of the main house, which is mainly used for car parking, would remain unchanged, as would the pedestrian access to the front of No [address].

    The use of the new crossover would result in motorists turning into or out of the site and across the footway directly onto the adjacent road junction and close to a pedestrian crossing that is marked by tactile paving and a dropped kerb. This arrangement would unduly compromise highway safety for footway and road users due to the obvious and significant potential for conflicting pedestrian and vehicle movements.

    The tactile paving and dropped kerb could be relocated further away from the new access to encourage pedestrians to follow a different route to cross the junction. However, most footway users are likely to take the shortest and most direct route across the junction, which would cut across the new access. A change to the formal arrangement for pedestrians to cross the road junction is therefore unlikely to be effective in reducing the risk of accidents.

    I also saw that vehicles turning into and out of residential accesses close to a road junction and a pedestrian crossing point is a notable feature of some properties along [address]. A number of these existing accesses also rely on vehicles reversing onto or from the highway. I am unaware of the detailed circumstances of these existing arrangements that were far from ideal with regard to highway safety. These examples do not persuade me that the appeal scheme, which would add to highway danger, should therefore be accepted.

    I note that the safety record of roads close to the site is good with no recorded instances of injuries over the last 21 years. However, it does not necessarily follow that the proposed access should therefore be regarded as safe.

    On the first main issue, I conclude that the proposed development would cause significant harm to highway safety. As such, it conflicts with Policies T3 and T4 of The London Plan (LP) and Policy 7A of the Ealing Development Management Development Plan Document (DPD). These policies state that development proposals should not, amongst other things, increase road danger. It is also at odds with the National Planning Policy Framework (the Framework), which states that development should provide safe and suitable access for all users.

  4. Section 05

    Character and appearance

    The site falls within the [address] (Haymills) Estate Conservation Area (CA), which is predominantly residential in character and includes a range of house types and styles. The Conservation Area Management Plan (the Management Plan) notes that the Estate derives part of its character from enclosed and planned front gardens, with the original frontages mostly defined by a low brick wall and a hedge, and a metal or timber gate.

    According to the Council, No 27 is identified as a local heritage asset. This designation signifies that the appeal property has visual, architectural or historic merit even though it is not statutorily listed. The Officer’s report also notes that the description of this asset includes the following reference: “Boundary wall intact and plenty of shrub/small tree planting to mitigate effect of hardstanding to front plot”.

    Part of the low-level boundary wall that runs along the back edge of the footway would be removed to accommodate the new access. In doing so, the proposal would reduce the sense of enclosure around one side of the junction. It would also ‘open up’ part of the site’s highway frontage to reveal more of the hard surface area around the front and side of the dwelling to public view. The combined effect would be to diminish the role of the wall as a distinctive feature that contributes to the significance of the CA and the setting of No 27 as heritage assets. According to the appellant, the boundary wall would be reduced by 7%. However, the visual impact would be proportionately greater given that the new access would be a conspicuous feature in the streetscape.

    I observed that gaps in front boundary walls are a noticeable feature of several properties along [address], including No 25 which is situated on the opposite side of the same junction as the appeal property. While these examples form part of the visual character of the local area, they blend into the street scene of which they form part with varying degrees of success. These cases do not therefore necessarily set a desirable example to follow. While the proposal would broadly mirror the break in the front boundary wall of No 25, it seems to me additional harm cannot be justified on the basis that some harm exists, particularly in an area that is recognised for its heritage value. To my mind, the cases cited and those that I saw tend to highlight the importance of retaining the remaining front boundary walls that remain intact and occupy a prominent position given that they are a finite resource.

    The Management Plan identifies several threats to the CA, amongst which is the removal of boundary walls. Accordingly, it notes that the removal of front walls, often to provide an additional off street parking space, will be firmly discouraged. This stance does not necessarily mean that all such proposals should therefore be refused since each development should be assessed on its individual planning merits. Having done so, my own conclusion is that by removing a section of the boundary wall to provide the new access, the proposal would be a visually disruptive and unsympathetic intrusion into the streetscape. As such, it would fail to preserve the character and appearance of the CA and diminish its significance as a heritage asset.

    On the second main issue, I conclude that the proposed development would cause significant harm the character and appearance of the local area. As such, it conflicts with [name] D3, D4 and HC1, [name] 7.4, 7B and 7C, and the objectives of the Management Plan. Together, the policies and guidance aim to ensure that development achieves a positive visual impact; complements the street sequence and building pattern; and conserves the significance of heritage assets. There would also be a conflict with the Framework with regard to the protection of designated heritage assets and the statutory duty. This duty requires that special attention is paid to the desirability of preserving or enhancing the character or appearance of the CA.

  5. Section 06

    Public benefits

    The Framework states that when considering the impact of a proposal on the significance of a designated heritage asset, great weight should be given to the asset’s conservation. Given the modest scale of the proposal relative to the considerable size of the CA, the identified harm would be less than substantial. In those circumstances, the Framework states that the harm should be weighed against the public benefits.

    The proposal would provide a more accessible, convenient and safer alternative to transfer a family member with specific needs between their home and a vehicle than the current access arrangements. These needs are detailed in the Client Needs Assessment, which I have carefully considered. A dedicated access that offers an entry and exit point and a route that is free from other parked cars is clearly important to the safety, care and well-being of the family member. By providing a more accessible and safer environment within the site for people with specific needs, the proposal could have a wider public benefit in that the property would be better placed to meet the requirements of future occupiers with similar needs. I also note that other possible options within the site have been explored and these are less well suited to meeting the appellant’s requirements. [name] am sympathetic to these matters, the benefits of providing an extra access, whether it is regarded as a private or a public benefit, do not outweigh the significant harm that I have identified.

  6. Section 07

    Conclusion

    The proposed development conflicts with the development plan, when read as a whole. There are no material considerations, including the Framework, which indicate that the decision should be taken otherwise than in accordance with the development plan. For the reasons set out above, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    2 September 2024Matches the official casework database
    Extracted site visit dates
    19 August 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3342085
Application reference
240379HH
Lead case reference
Not recorded
Planning authority
London Borough of Ealing
Planning authority code
E09000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 April 2024
Valid date
16 May 2024
Start date
17 June 2024
Planning authority decision date
11 March 2024
Appeal decision date
2 September 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
56473
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21