Skip to main content
Official casework recordDismissedCurrent release

Appeal 3342642

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a part one/two storey side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Applications for costs

    An application for costs in relation to this appeal was made by the appellant against the Council of the London Borough of Bromley. This application is the subject of a separate decision.

  3. Section 04

    Preliminary Matters

    Following the submission of the appeal, a draft revision to the National Planning Policy Framework was issued for consultation alongside a [name]. Neither introduce issues relevant to the pertinent considerations in this appeal and therefore I have not sought comments on it from the parties.

    I have also dealt with another appeal APP/G5180/D/24/3349643 on this site. That appeal is the subject of a separate decision.

    I note that paragraph 7.1.1 of the Officer’s report, states that the proposed development is a resubmission of application 23/00227/FULL6 rather than 07/02106/FULL6. I note both applications are listed in the Planning History section of the committee report. As application 23/00227/FULL6 shares similarities with the appeal proposal, the Officer was not incorrect in stating that the proposal was a resubmission of this more recent application. I have considered the planning history of the appeal site, where relevant, within my reasoning below.

  4. Section 05

    [name]

    The main issues are: i. whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework and any relevant development plan policies; ii. the effect of the proposal on the openness of the Green Belt; and iii. would the harm by reason of inappropriateness, and any other harm, be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the development.

  5. Section 06

    Inappropriate Development

    The National Planning Policy Framework 2023 (the Framework) explains that the essential characteristics of Green Belts are their openness and permanence. There is a general presumption against inappropriate development in the Green Belt (GB) unless very special circumstances exist. The construction of new buildings should be regarded as inappropriate, but for defined exceptions.

    The Local Development Framework Local Plan, London Borough of Bromley Planning Division 2019 (LP) Policy 49 states that certain forms of development are not inappropriate in the GB. This includes the ‘extension or alteration of a building that it does not result in disproportionate additions over and above the size of the original building’. This stance is reflected in paragraph 149 of the Framework which also allows for extensions to existing buildings in the GB, as an exception, on the provision that they are not disproportionate.

    Further, criterion a of Policy 51 of the LP allows extensions to dwellinghouses in the GB provided ‘the net increase in the floor area over that of the original dwellinghouse is no more than 10%, as ascertained by external measurement’.

    Floor plans of the dwelling as originally built have not been provided and the main parties have not provided any quantitative data relating to the original floor area of the building. However, based on the evidence before me, the original dwelling appears to have been extended previously at ground floor level including a single storey rear extension to the lounge and dining room, a car port and a front porch extension.

    The cumulative floor area of the existing extensions appears to be greater than 10% of the original. This assessment reflects the view of the Inspector for a recent appeal for an extension to the property1, which is a material consideration in my assessment of the proposal. Further, there is no substantive evidence before me to demonstrate that the existing extensions on [name] are less than 10% of the original. With this in mind any additional extensions, however small, would contribute to a net increase in the floor area over that of the original dwellinghouse by more than 10%. Therefore, the appeal scheme would constitute inappropriate development in the GB. For the purposes of the Framework this would also be harmful to the GB by definition.

  6. Section 07

    Effect on Openness

    The Framework indicates that openness is an essential characteristic of the GB. The proposal would introduce a further element of built form to the site, albeit that it would be as an extension to an existing building. The development would inevitably increase the scale and mass of the dwelling. As a result, both in visual and spatial terms, the openness of the GB would be reduced. 1 APP/G5180/D/23/3321589

  7. Section 08

    [name]

    I note that Planning Permission was granted in 2007 for a part one/two storey side extension2. This permission was never implemented, and the appellant asserts that the appeal proposal reflects this previously approved scheme. If there is no fundamental change in local or national GB policy since 2007 then the appeal proposal should be determined in a like manner. However, since this initial approval the development plan has changed. This includes the adoption of the London Plan 2021 and the current LP, as well as the introduction of the Framework in place of national planning guidance. I have not been provided with all of the policies and guidance that were in place at the time of the 2007 decision, in their entirety. Therefore, it has not been clearly demonstrated that the wording of all relevant policies remains unaltered. Further, full details of the approval for this application have not been provided. As it was issued several years ago special circumstances pertinent to the decision may have changed. For these reasons I afford it only moderate weight.

    The Framework states that very special circumstances will not exist unless the potential harm to the GB by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations. I have found that the proposal would be inappropriate development. The proposed extension would also cause a loss of openness, although given the scale of the extension and the extent of the GB, the harm arising from the development in this respect would be limited.

    My attention has been drawn to an extension that was approved by the Council on neighbouring property Barnet Mead3, this property also had an earlier approval for the erection of an extension4. Notwithstanding this, full details of each approval have not been provided. As such, I cannot be certain that the extent of the extensions approved on this property form a direct parallel to this appeal, or were approved under the current development plan, as such I do not afford them weight in my assessment of the appeal.

    I understand that the site may benefit from permitted development rights. Still, it is not clear to me that the alternative scheme suggested would be permitted development. It is open to the appellant to apply to the Council for a separate determination on this matter. Further, allowances for larger extensions should be subject to a separate determination for prior approval, regardless of the outcome of the appeal. Consequently, I find the suggested alternative to have limited weight in the determination of the appeal.

    Inappropriate development is, by definition, harmful to the GB and should not be approved except in very special circumstances. I have addressed other considerations advanced and found them to be worthy of only moderate weight. Since substantial weight should be attributed to any harm to the GB, it is evident that they would not clearly outweigh the harm. Therefore, the harm by reason of inappropriateness, and any other harm, is not clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the development. 2 07/02106/FULL6 3 15/00827/FULL6 4 07/03783

  8. Section 09

    Other Matters

    The appeal site is adjacent to the Bromley, Hayes & Keston Commons Conservation Area (CA). The Council raised no concerns in relation to design or the impact of the proposal on the setting of the CA. Section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 sets out that special attention shall be paid to the desirability of preserving or enhancing the character and appearance of Conservation Areas. Given that the proposal would, be sympathetic to the existing building, and external materials can be controlled by condition, I have no reason to disagree with the Council’s assessment in this regard. However, a lack of harm in this respect would be a neutral factor in my assessment of the appeal scheme.

    Within the appeal statement the appellant asserts that the Chief Planning Officer suggested that planning permission would be granted for the proposed scheme. Whilst this is regrettable, advice provided by the local authority cannot pre-empt the democratic decision making process or a particular outcome.

  9. Section 10

    Conclusion

    For the reasons given above the appeal scheme would conflict with the development plan and there are no material considerations, including the approach of the Framework and worthy of sufficient weight, which would indicate to the contrary. Therefore the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 33807No official casework-database value to compare
    Extracted decision date · page 1
    15 November 2024Matches the official casework database
    Extracted site visit dates
    1 October 2024 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 33807No official casework-database value to compare
    Extracted decision date · page 1
    15 November 2024Matches the official casework database
    Extracted site visit dates
    1 October 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3342642
Application reference
23/04823/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 April 2024
Valid date
16 April 2024
Start date
10 May 2024
Planning authority decision date
25 March 2024
Appeal decision date
15 November 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
60069
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21