Appeal 3342767
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘Demolition of existing detached garage and 2 storey side projection - 2 Storey side extension to include replacement intergal [sic] garage - 2 Storey infill extension to front of property, including bay window to match existing - Single storey rear extension - [name] with Rear facing dormer with glazed doors onto inset balcony - 1no. front facing high level roof light - 2no. Side (South) facing high level roof lights - New glazing throughout’.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal upon the character and appearance of the street scene.
Section 04
Reasons
[address] is a straight aligned residential street. No 32 is a two-storey detached property with a pedestrian access width gap to the side boundary with No 34, and a driveway to the opposite side between the boundary with No
Although there is no uniform separation distance between neighbouring buildings, there is clear spacing between most that creates a harmonious rhythm between the eclectic properties which prominently line both sides of the road behind consistently fairly shallow garden frontages. The proposal would involve alterations to the front and rear of the property including a two-storey side extension, a single-storey rear extension and a loft conversion with a rear facing dormer window.
The Council’s Residential Extensions – a [name] for Householders (the [name]) was adopted in 2008 to provide advice to householders, architects, and builders on what is acceptable within the Borough. The Design Guide deals with side extensions at section 3.2. It recognises that the character of an area is often a result of the spaces between buildings and that side extensions which fill the gaps between properties, can result in a cramped appearance, or give a terracing effect that is harmful to the character of the street. It advises, amongst other things, that side extensions should be set at least 1m off the side boundary of the property to ensure that the street does not become cramped and that in some instances the character of the street may require a greater distance is left to the boundary, particularly if a two-storey extension is proposed. The appeal proposal would extend No 32 sideways at two-storey, effectively filling the existing gap between the dwelling and the shared boundary with No 30. It would represent a type of development the [name] specifically seeks to avoid.
No 30 is set away from the boundary with the appeal property by the width of a side drive. As a consequence, the proposed side extension would not create any terracing effect with the neighbouring dwelling. Nevertheless, the encroachment of built form close to the boundary would change how No [address] scene. It currently sits comfortable on its plot with space to both side boundaries. The loss of a gap to the common side boundary with No 30 would make the dwelling appear cramped within its setting. This would detract from the rhythm and harmony of the street scene. In addition, allowing No [address] the gap would make it difficult to resist any similar future proposed change to No 30. This would have the potential of leading to further harm.
By failing to respect the site and its surroundings there would be conflict with Policy CS41 of the Bournemouth Local Plan: [name] 2012. There would also be conflict with Policy BAP1 of the Boscombe & Pokesdown Neighbourhood Plan, adopted November 2019, as far as it requires proposals for development to reflect the character of an area, including the spaces between buildings. For similar reasons there would be conflict with the National Planning Policy Framework’s objectives for achieving well-designed and beautiful places.
The appellant has referred to various other properties in the locality to support their appeal. Whilst there is no regimented degree of spacing between neighbouring properties along [address], the gaps that exist are important defining features of the street scene. I accept that there are some examples where properties extend up to one of their side boundaries at two-storey but these are by far the exception. Moreover, where they do exist, particularly at Nos 6 and 8 which have been specifically drawn to my attention, there is no evidence to show that the arrangement is the result of any past extension. My impression, based on my own observations during my site visit, was that these two properties were originally constructed in this manner. I saw that the re-development at [address], comprising two pairs of semi-detached dwellings under construction at the time of my visit, maintained adequate separation between each of the two buildings and between each of their neighbours. Examples at [address] and [address] are slightly further afield and where houses are more deeply recessed with less rhythm to the local development pattern. Overall, I saw nothing to alter my view that the loss of space to the side of the appeal property would detract from the character and appearance of the street scene.
The Council raised no objections in principle to other aspects of the appeal proposal. I have no reason to disagree. I have noted their reservation over the potential impact of a second-floor balcony to the rear due to some apparent discrepancies in the plans but, given my conclusion on the main issue, I have no reason to consider this matter further.
Section 05
Conclusion
For the reasons given, and having regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 286No official casework-database value to compare
- Extracted decision date · page 1
- 12 July 2024Matches the official casework database
- Extracted site visit dates
- 25 June 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3342767
- Application reference
- 7-2023-25345-C
- Lead case reference
- Not recorded
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning authority code
- E06000058
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 April 2024
- Valid date
- 18 April 2024
- Start date
- 16 May 2024
- Planning authority decision date
- 30 January 2024
- Appeal decision date
- 12 July 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53975
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21