Appeal 3344044
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters and Main Issue
The shell of the rear extension has been constructed. I have proceeded on the basis that part retrospective planning permission is being sought. Based on the submitted documents, and from what I saw on site, it is sufficiently clear that the appellant is seeking approval for the extension as it has been built. While there is disagreement between the main parties regarding the exact height of the extension, this appears to relate to where the natural ground level is. Furthermore, the officer report shows an understanding that the proposal is retrospective and seeks to regularise what has been built and has made an assessment accordingly. For these reasons I am satisfied that I have sufficient information to make an assessment as to the effect of the proposals, with specific regard to the main issue which is such on the living conditions of the occupiers of No [address] with specific regard to outlook and light.
Section 05
Reasons for the Recommendation
A scheme for prior approval was accepted for a single-storey rear extension. The shell that has been constructed does not comply with the detail thereof and since the prior approval process requires details to be considered before development commences, this option does not represent a fallback position.
The extension has been built alongside the conservatory at No [address]. It projects more than marginally further and noticeably higher. In so doing, when considered along with its proximity, the extension has something of a looming effect, dominating the conservatory. The lessens the quality of the experience of it for users, imposing significantly and adversely on the outlook therefrom by being unacceptably overbearing.
Owing to the orientation of the properties, the extension results in increased overshadowing of the conservatory compared to previously, and particularly during winter months when the sun is lower in the sky. The submitted daylight and sunlight assessment shows that the extension satisfies the BRE criteria for the vertical sky component. However, the window panels in the roof of the conservatory that are angled towards the extension have a significant reduction in annual probable sunlight hours (APSH) and two of the panels do not meet the BRE criteria for APSH. The proximity and height of the extension have therefore unacceptably reduced the amount of light into the conservatory. An extension which, by virtue of its design, intendeds to maximise the enjoyment of light and not be in regular shadow for sustained periods.
The extension therefore significantly reduces the quality of the living conditions of the occupiers of No 1 in respect of outlook and light. It is therefore contrary to Policy GP2 of the Walsall Unitary Development Plan 2005 which requires that development does not cause an unacceptable adverse impact on matters including daylight and sunlight received by nearby property. The proposal would also be contrary to paragraph 135 (f) of the National Planning Policy Framework 2023 which requires development to have a high standard of amenity for existing and future users.
The decision notice also cites a conflict with Policy HOU2 of the Black Country Core Strategy 2011. However, and on my reading, this policy is more relevant to housing density in new development. It does not therefore relate to the substance of the main issue.
Section 06
[name]
I understand that the extension would provide a more comfortable and functional environment for the appellant, however it has not been satisfactorily demonstrated that this aim could not be achieved without causing the identified harm. I am also aware that the appeal scheme would be acceptable in terms of effects other than the living conditions of neighbours. These would however, in each case, represent a lack of harm which would be neutral in any balance of considerations. They would not weigh in favour of the proposal.
Section 07
Conclusion
The appeal scheme would conflict with the development plan. There are no material considerations worthy of sufficient weight which indicate that a decision should be made other than in accordance therewith. I therefore recommend that the appeal be dismissed. Darren Ellis APPEAL PLANNING OFFICER
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s recommendation and on that basis the appeal is dismissed. [planning inspector] INSPECTOR 2
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1895No official casework-database value to compare
- Extracted decision date · page 1
- 14 August 2024Matches the official casework database
- Extracted site visit dates
- 2 July 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3344044
- Application reference
- 23/1432
- Lead case reference
- Not recorded
- Planning authority
- Walsall Metropolitan Borough Council
- Planning authority code
- E08000030
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 May 2024
- Valid date
- 9 May 2024
- Start date
- 21 May 2024
- Planning authority decision date
- 1 March 2024
- Appeal decision date
- 14 August 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 55632
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21