Skip to main content
Official casework recordAllowedCurrent release

Appeal 3344134

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey extension to house to provide a swimming pool and amenities.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for single storey extension to house to provide a swimming pool and amenities at [site address] , [name], Dorset [postcode] in accordance with the terms of the application, [name]/HOU/2023/07231, subject to the conditions in the attached schedule.

  2. Section 03

    Preliminary Matters

    The appeal site address in the header and my decision above is taken from the application form and the Council’s decision notice. The appeal form provides a different address but I am satisfied the original adequately describes the location of the site.

    On my visit I saw building works being carried out to the appeal property. These did not appear to relate to the appeal scheme and so I have assumed the proposed development has not started.

  3. Section 04

    [name]

    The main issues are (i) the effect of the development on the character and appearance of the area, and (ii) the effect of construction works on trees.

  4. Section 05

    Reasons

    The appeal property lies within and on the edge of the [site address] Special Character Area (ACSCA). This is characterised by low density development with large properties heavily screened by mature pines and other trees and hedges. The appeal site is typical of the locality as it contains a large dwelling set in spacious grounds with hedges and trees on parts of its boundaries. The plot is almost triangular in shape so that its back garden widens as it moves away from the house. The rear boundary of the garden adjoins a field that is on a lower level and that also has hedges and trees on its boundaries.

    The proposed extension would not be seen from [address] as it would be behind the existing house. Also, it would be largely hidden from adjoining residences by virtue of the screening effect of boundary vegetation. There would be views of the addition from the adjoining fields but these would be from private property. Hedges and trees around the field would partially screen the extension and where it is visible the addition would be seen against the backdrop of the existing dwelling and the belt of vegetation along the side boundary. As such, the development would have only a localised visual effect.

    The extension would be sizeable, particularly as it would project a significant distance beyond the rear elevation of the house. However, it would be lower than the current dwelling. Also, it would not unduly intrude into the open area to the rear of the house due to its discrete positioning towards one side of the back garden next to a belt of hedges and trees. Most of the garden would remain unaltered and so the proposal would not lead to any unacceptable erosion of space to the edge of the ACSCA.

    The Council’s Special Character Areas Supplementary Planning Guidance 2005 (the SPG) states that new development in the ACSCA must reflect the rhythm and spacing of existing dwellings. However, properties at the end of [address] are not seen together as they are set back from the road within large, landscaped plots. As a result, there is no noticeable regular pattern to the layout of dwellings. Moreover, the unusual depth to the development would not be seen within the context of adjoining properties due to the screening effect of the boundary vegetation. Therefore, it would not appear out of character in the context of other buildings and it would not visually disrupt any rhythm to the existing built form.

    For these reasons, I conclude the development would have an acceptable effect on the character and appearance of the area. In these respects, it would accord with policy HE2 of the Christchurch and East Dorset Local Plan Part 1 [name] 2014 (the CS). Amongst other things, this looks to ensure development is compatible with its surroundings. The effect of construction works on trees.

    Many of the trees on the site are covered by a tree preservation order. The side wall of the extension would lie near to bushes and hedges that lie in front of a line of [name] trees. Most of these would be retained with only a dead pine indicated as being removed.

    The plans indicate the extension would lie outside of the root protection areas (RPAs) identified for each of the retained trees. Also shown is temporary fencing to be erected to protect the trees during construction. This would be positioned so as to provide a 1.5m wide workspace to the side of the proposed extension.

    The protective fencing would be outside most of the identified RPAs and I am satisfied that a 1.5m wide space would be sufficient for the erection of scaffolding associated with the construction works. There is limited information on the foundations that would be required for the extension. However, given the distance from the extension to the RPAs, it would be appropriate to impose a planning condition to ensure foundations are designed and can be constructed so as to avoid harm to the protected trees.

    The plans indicate a route to the side of the house close to the extension for construction workers. Even if an existing shed is removed as indicated, this route would be tight and potentially unable to take the movement of construction vehicles such as diggers without unduly impacting on the nearby trees. However, on my visit I saw a wider space between the other side of the house and the vegetation on the other boundary. I see no reason why this alternative route could not be used to minimise the impacts of development works on trees. Again, it would be reasonable to impose a planning condition that requires approval of revised tree protective measures that also allow adequate access for construction works to take place. The same condition could also ensure new servicing and pipework associated with the development are located so as to avoid tree roots.

    For these reasons, I conclude construction works associated with the development would not have a harmful effect on trees. In these regards, the proposal would accord with CS policy HE2 and the requirement for the scheme to have a compatible relationship with mature trees

  5. Section 06

    Conditions

    In line with the Council’s suggestion and in the interests of clarity, I have attached a condition listing the approved plans. For the same reason and to ensure a satisfactory appearance, I include a condition that requires the development to be constructed of materials as specified on the planning application form. This would remove the need for a condition that requires external materials to match those on the existing house. Condition 4 is imposed to ensure the development does not harm the well-being of trees on and near the site.

  6. Section 07

    Conclusion

    The development would be acceptable when considered against the main issues. Therefore, it would accord with the development plan when read as a whole. As such, I conclude the appeal should be allowed.

  7. Section 08

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos 306.GA.01, 306.GA.02, 3306.GA.02.03, 306.GA.03 and 306.GA.05.

    The external walls and roof of the development shall be constructed in materials as outlined on the planning application form.

    Notwithstanding the information provided with the planning application and planning appeal, no site clearance, preparatory work or development shall take place until a scheme for the protection of trees and the appropriate working methods in accordance with [name] 5837: Trees in relation to design, demolition and construction - Recommendations (or in an equivalent [name] if replaced) has been submitted to and approved in writing by the local planning authority. The scheme for the protection of the retained trees shall be carried out as approved. The scheme shall include the following details a) a specification for protection to trees during both demolition and construction phases and a plan indicating the alignment of the protection methods; b) a specification for scaffolding and ground protection within tree protection zones; c) a schedule of tree works; d) details on the area for storage of materials, concrete mixing and use of fires; e) plans and particulars showing the siting of service and piping infrastructure; f) a full specification for the construction of any arboriculturally sensitive structures and sections through them, including the installation of foundations as well as details of any no-dig specification; g) details of the works requiring arboricultural supervision to be carried out by the developer's arboricultural consultant, including details of the frequency of supervisory visits and procedure for notifying the local planning authority of the findings of the supervisory visits; and h) details of all other activities that have implications for trees on or adjacent to the site.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 113No official casework-database value to compare
    Extracted decision date · page 1
    10 December 2024Matches the official casework database
    Extracted site visit dates
    5 December 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3344134
Application reference
P/HOU/2023/07231
Lead case reference
Not recorded
Planning authority
Dorset
Planning authority code
E06000059

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 May 2024
Valid date
10 May 2024
Start date
4 July 2024
Planning authority decision date
27 February 2024
Appeal decision date
10 December 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
61499
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21